Back to bathroom remodel contractors
Jv Services
- Based in
- San Ramon
- On San Francisco permits
- Jun 2020 to Jan 2026
- Last 24 months
- 10 permits filed
28 permits since 2000: 22 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 6, 2025 | Completed final sign-off Jun 2026 | 211 Moulton St | addition of bathroom. new drain and water for toilet, sink, and shower. new electrical for lights and gfci. new sheetrock and paint.Details
addition of bathroom. new drain and water for toilet, sink, and shower. new electrical for lights and gfci. new sheetrock and paint. | $23,000 |
| Jul 1, 2025 | Completed final sign-off Sep 2025 | 3665 Fillmore St | unit #12: remodeling of kitchen and bathroom in kind. no moving walls. fixtures to remain in the same location. kitchen approx. 99 sq ft. bathroom approx. 40 sq ft.Details
unit #12: remodeling of kitchen and bathroom in kind. no moving walls. fixtures to remain in the same location. kitchen approx. 99 sq ft. bathroom approx. 40 sq ft. | $30,000 |
| May 12, 2025 | Completed final sign-off Dec 2025 | 211 Moulton St | (2) bathroom remodels in kind. remove and replace toilets, sinks, shower walls, tub, and sheetrock as needed.Details
(2) bathroom remodels in kind. remove and replace toilets, sinks, shower walls, tub, and sheetrock as needed. | $28,000 |
| Mar 5, 2025 | Completed final sign-off Jun 2025 | 44 Cervantes Bl | unit 206: demolition of kitchen and bathroom. redo new kitchen and bath in kind. new appliances, new paintDetails
unit 206: demolition of kitchen and bathroom. redo new kitchen and bath in kind. new appliances, new paint | $25,000 |
| Oct 10, 2023 | Completed final sign-off Sep 2024 | 600 Buchanan St | run electrical for bath, powder room and kitchen. insulate bath, powder room and kitchen. in kitchen: sheetrock, new cabinets, appliances and countertop. in bath and powder: toilets and sinks/vanity. install insul. and sheetrock on 1 bedroom wall and ceiling. 5/8" type x everwhere. all work in kind.Details
run electrical for bath, powder room and kitchen. insulate bath, powder room and kitchen. in kitchen: sheetrock, new cabinets, appliances and countertop. in bath and powder: toilets and sinks/vanity. install insul. and sheetrock on 1 bedroom wall and ceiling. 5/8" type x everwhere. all work in kind. | $28,000 |
| Dec 20, 2022 | Completed final sign-off Oct 2023 | 121 San Benito Wy | remodel (e) kitchen, new applicances,counter w/o new cabinets and lighting.remodel (e) main bath and access.remodel (e) jack and jill bathroom with new access from hall and (n) lighting. remodel (e) primary bath and primary closet and (n) lighting.Details
remodel (e) kitchen, new applicances,counter w/o new cabinets and lighting.remodel (e) main bath and access.remodel (e) jack and jill bathroom with new access from hall and (n) lighting. remodel (e) primary bath and primary closet and (n) lighting. | $45,000 |
| Sep 23, 2022 | Completed final sign-off Jan 2023 | 44 Cervantes Bl | one kitchen and one bathroom: unit #203: demo of kitchen cabinets, counters. demo of toilet, vanity, wall tile and floor tile in bathroom. replace with new fixtures, upgrade electrical subpanel.Details
one kitchen and one bathroom: unit #203: demo of kitchen cabinets, counters. demo of toilet, vanity, wall tile and floor tile in bathroom. replace with new fixtures, upgrade electrical subpanel. | $25,000 |
| Jul 15, 2022 | Completed final sign-off Sep 2022 | 3665 Fillmore St | unit 16: demoliton of extg kitchen and bathroom. run electrical for kitchen and bathroom. install new cabinets. new tub and toilet. layout will stay the same. no exterior workDetails
unit 16: demoliton of extg kitchen and bathroom. run electrical for kitchen and bathroom. install new cabinets. new tub and toilet. layout will stay the same. no exterior work | $15,000 |
| Jun 11, 2020 | Completed final sign-off Oct 2020 | 1865 Clay St | unit#6: bathroom remodel: replace bathtub with shower pan, replace shower valve, install new granite on shower walls, replace vanity. replace kitchen countertops, relocate electrical sub panel from kitchen to hallway. kitchen and bathroom remodel in-kind.Details
unit#6: bathroom remodel: replace bathtub with shower pan, replace shower valve, install new granite on shower walls, replace vanity. replace kitchen countertops, relocate electrical sub panel from kitchen to hallway. kitchen and bathroom remodel in-kind. | $22,000 |