Back to kitchen remodel contractors
Jpg Home Improvement Inc
- Based in
- Burlingame
- On San Francisco permits
- May 2011 to Sep 2024
- Last 24 months
- 0 permits filed
91 permits since 2000: 80 completed, 3 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
30 kitchen remodel permits: 26 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 191 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2024 | Completed final sign-off May 2024 | 2293 21st Av | 1 kitchen remodel. new subpanel for recepticle line. no layout changeDetails
1 kitchen remodel. new subpanel for recepticle line. no layout change | $20,000 |
| Jan 12, 2024 | In progress issued Jan 2024 | 401 34th Av | remodel kitchen: new lights, new outlets, replace sink, replace cabinets.Details
remodel kitchen: new lights, new outlets, replace sink, replace cabinets. | $15,000 |
| Jun 13, 2023 | Completed final sign-off May 2024 | 1103 Bowdoin St | basement structural foundaton and seismic upgrade, 1st fl. (n) bathroom, remodel (e) kitchen and bathroom, (n) front & rer deck/stair, remove/infill (2) chimneys, add sliding door to rear deck, add (n) north side window, new roof overhangDetails
basement structural foundaton and seismic upgrade, 1st fl. (n) bathroom, remodel (e) kitchen and bathroom, (n) front & rer deck/stair, remove/infill (2) chimneys, add sliding door to rear deck, add (n) north side window, new roof overhang | $125,000 |
| Mar 20, 2023 | Completed final sign-off May 2024 | 72 Westgate Dr | interior renovation of an (e) bldg: demo, reconfifuration kitchen layout, construct new bedroom, family rm, bathroom in basement level. included electric & plumbing, hvac modificatin as necessary. add approx 828 sf of living space in basement.Details
interior renovation of an (e) bldg: demo, reconfifuration kitchen layout, construct new bedroom, family rm, bathroom in basement level. included electric & plumbing, hvac modificatin as necessary. add approx 828 sf of living space in basement. | $100,000 |
| Jan 6, 2023 | Completed final sign-off Jun 2023 | 425 Sawyer St | bathroom remodel: with 1 new shower pan. run new electrical wire throughout the 2nd floor (except kitchen). replace electrical panel to 125a.Details
bathroom remodel: with 1 new shower pan. run new electrical wire throughout the 2nd floor (except kitchen). replace electrical panel to 125a. | $20,000 |
| Sep 16, 2022 | In progress issued May 2024 | 2122 41st Av | remodel (e) kitchen, bathrooms & launtry room. install (n) windows at front side of property. remove (e) fireplace. build two floor addition in rear of property. build second story deck in rear of property.Details
remodel (e) kitchen, bathrooms & launtry room. install (n) windows at front side of property. remove (e) fireplace. build two floor addition in rear of property. build second story deck in rear of property. | $125,000 |
| Aug 31, 2022 | Completed final sign-off Mar 2023 | 1531 California St | remodel one kitchen and one hallway bathroom. change bathtub to a shower. add a subpanel.Details
remodel one kitchen and one hallway bathroom. change bathtub to a shower. add a subpanel. | $28,000 |
| May 11, 2022 | Completed final sign-off May 2023 | 1547 46th Av | construct 1 bedroom, 1 media room, 1 full bath & family room at g/f. remodel (e) kitchen, bathroom, add 1 full bath & replace (e) sheet rock w/ new at 2/f.Details
construct 1 bedroom, 1 media room, 1 full bath & family room at g/f. remodel (e) kitchen, bathroom, add 1 full bath & replace (e) sheet rock w/ new at 2/f. | $150,000 |
| Apr 25, 2022 | Completed final sign-off Apr 2023 | 2788 35th Av | remodel kitchen. replace counter, cabinets, sink & flooring. all work on 2nd flr.Details
remodel kitchen. replace counter, cabinets, sink & flooring. all work on 2nd flr. | $28,000 |
| Apr 19, 2022 | Completed final sign-off Apr 2023 | 2788 35th Av | existing wall between kitchen/living room to be removed. see structural dwgs for details.Details
existing wall between kitchen/living room to be removed. see structural dwgs for details. | $36,000 |
| Nov 22, 2021 | Completed final sign-off Jun 2022 | 427 Edinburgh St | removal of interior load bearing wall between kitchen & dining room on 1st story. raise height of hallway opening into kitchen. remodel kitchen.Details
removal of interior load bearing wall between kitchen & dining room on 1st story. raise height of hallway opening into kitchen. remodel kitchen. | $33,000 |
| Mar 31, 2021 | Completed final sign-off Oct 2021 | 1533 California St | kitchen & bathroomn remodel. no doors or walls to be altered. convert a tub to a shower.Details
kitchen & bathroomn remodel. no doors or walls to be altered. convert a tub to a shower. | $32,000 |
| Sep 8, 2020 | Completed final sign-off Feb 2021 | 2224 Clay St | remodel a kitchen & bath at 2nd floor. no walls & doors to be removed. upgrade the main panel to be 200 amp ready.add 2 sub-panels , add new lights & outlets throughout the house.Details
remodel a kitchen & bath at 2nd floor. no walls & doors to be removed. upgrade the main panel to be 200 amp ready.add 2 sub-panels , add new lights & outlets throughout the house. | $28,000 |
| Mar 20, 2019 | Completed final sign-off Dec 2020 | 455 Magellan Av | interior remodel - rleocate family rm, add new bedroom, bath & laundry on 1st fl, kitchen, family rm and powderroom remodel on2nd fl, 3rd fl remodel of existing bedrooms, 2 baths & construction of 3rd bath.Details
interior remodel - rleocate family rm, add new bedroom, bath & laundry on 1st fl, kitchen, family rm and powderroom remodel on2nd fl, 3rd fl remodel of existing bedrooms, 2 baths & construction of 3rd bath. | $550,000 |
| Nov 14, 2018 | Expired or cancelled expired Sep 2024 | 49 Ellington Av | remodel kitchen change new kitchen cabinet w/ sink, bathroom sink. no other work in bathroom.Details
remodel kitchen change new kitchen cabinet w/ sink, bathroom sink. no other work in bathroom. | $7,000 |
| Apr 21, 2017 | Completed final sign-off Nov 2017 | 741 26th Av | remdoel 1 kitchen & 2 baths.Details
remdoel 1 kitchen & 2 baths. | $20,000 |
| Mar 16, 2017 | Completed final sign-off May 2017 | 1967 21st Av | kitchen remodeling.Details
kitchen remodeling. | $12,000 |
| Feb 16, 2017 | Completed final sign-off Jun 2017 | 27 West Portal Av | kitchen and bathroom remodeling and deck repair (less than 50%).Details
kitchen and bathroom remodeling and deck repair (less than 50%). | $25,000 |
| Feb 16, 2017 | Never finaled issued Feb 2017, no final | 503 07th Av | kitchen remodeling and replace existing cracked plaster walls.Details
kitchen remodeling and replace existing cracked plaster walls. | $16,000 |
| Dec 27, 2016 | Completed final sign-off May 2017 | 129 Warren Dr | remodel kitchen on 2nd flr, upgrade main electrical panel, install lights, switches & outlets.Details
remodel kitchen on 2nd flr, upgrade main electrical panel, install lights, switches & outlets. | $30,000 |
| Mar 17, 2016 | Completed final sign-off Jun 2016 | 514 45th Av | kitchen (on upper level) remodeling, replace (e)kitchen cabinets, update plumbing fixtures & lighting. min 50% wattage lighting as high efficacy.Details
kitchen (on upper level) remodeling, replace (e)kitchen cabinets, update plumbing fixtures & lighting. min 50% wattage lighting as high efficacy. | $12,000 |
| Jan 26, 2016 | Completed final sign-off Feb 2016 | 2385 Ocean Av | kitchen - replace cabinets and tiles - bathroom - replace vainity, toilet and tilesDetails
kitchen - replace cabinets and tiles - bathroom - replace vainity, toilet and tiles | $6,000 |
| Aug 3, 2015 | Completed final sign-off Oct 2015 | 2723 40th Av | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $14,000 |
| Apr 9, 2015 | Completed final sign-off Sep 2017 | 1493 Newcomb Av | add gym,study rm, theater, half bath & 2 dormers @ attic flr. add 2 bedrms, fam,full bath & wet bar @ 1st flr. add full bath,utility,balcony & relocate kitchen & remodel (e) bedrm & bath @ 2nd flr. relocate int. stair, add lights fixtures.Details
add gym,study rm, theater, half bath & 2 dormers @ attic flr. add 2 bedrms, fam,full bath & wet bar @ 1st flr. add full bath,utility,balcony & relocate kitchen & remodel (e) bedrm & bath @ 2nd flr. relocate int. stair, add lights fixtures. | $80,000 |
| Feb 20, 2015 | Completed final sign-off Nov 2015 | 601 Van Ness Av | renovation kitchen, bathroom, add recessed lighting, outlets, replace (e) electrical panel, add new drain pipe from (e)Details
renovation kitchen, bathroom, add recessed lighting, outlets, replace (e) electrical panel, add new drain pipe from (e) | $35,000 |
| May 28, 2014 | Completed final sign-off Jan 2015 | 1406 Thomas Av | 3rd floor: add full bath; replace 1 window. 2nd floor: reconfigure floor plan for kitchen, dining rm, master bedrm; add half bath w/ new window; replace 3 windows. ground floor: relocate and replace water heater and furnace. install light switches & receptacles.Details
3rd floor: add full bath; replace 1 window. 2nd floor: reconfigure floor plan for kitchen, dining rm, master bedrm; add half bath w/ new window; replace 3 windows. ground floor: relocate and replace water heater and furnace. install light switches & receptacles. | $48,000 |
| Apr 11, 2014 | Completed final sign-off May 2015 | 1895 Funston Av | remodel kitchen, bathroom and one full bath at upper floor per plan.Details
remodel kitchen, bathroom and one full bath at upper floor per plan. | $29,700 |
| Dec 5, 2013 | Completed final sign-off Nov 2015 | 4217 21st St | work @ unit# 4219 only. remodel (e) kitchen & bath. add 47.75 sq ft to (e) kitchen by extending horizontal 4'-o" 4219 onlyDetails
work @ unit# 4219 only. remodel (e) kitchen & bath. add 47.75 sq ft to (e) kitchen by extending horizontal 4'-o" 4219 only | $20,000 |
| Apr 24, 2013 | Completed final sign-off Aug 2013 | 646 41st Av | kitchen & 2 bathrooms (upstairs) remodel, repl kitchen cabinets, sink, faucet, light and outlet, repl bath tub, faucet, vanity, cabinet, light and outlet, floor tilingDetails
kitchen & 2 bathrooms (upstairs) remodel, repl kitchen cabinets, sink, faucet, light and outlet, repl bath tub, faucet, vanity, cabinet, light and outlet, floor tiling | $15,000 |
| Apr 22, 2013 | Completed final sign-off Oct 2013 | 201 Webster St | work to be performed at 1st floor in 201 webster street only. reconfigure and remodel kitchen, remodel bathroom. install lighting. switches and receptacles.Details
work to be performed at 1st floor in 201 webster street only. reconfigure and remodel kitchen, remodel bathroom. install lighting. switches and receptacles. | $22,000 |