Jpg Home Improvement Inc
- Based in
- Burlingame
- On San Francisco permits
- May 2011 to Sep 2024
- Last 24 months
- 0 permits filed
91 permits since 2000: 80 completed, 3 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 9 completed, 1 in progress, 1 never finaled. Typically 80 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2024 | Completed final sign-off Dec 2024 | 576 Liberty St | demolish two level rear deck with stairs and reconstruct in kind. demolish windows and door at 1st fl porch & replace with 3 panel sliding doors at rear and 2 panel sliding doors at east side.Details
demolish two level rear deck with stairs and reconstruct in kind. demolish windows and door at 1st fl porch & replace with 3 panel sliding doors at rear and 2 panel sliding doors at east side. | $85,000 |
| Jun 13, 2023 | Completed final sign-off May 2024 | 1103 Bowdoin St | basement structural foundaton and seismic upgrade, 1st fl. (n) bathroom, remodel (e) kitchen and bathroom, (n) front & rer deck/stair, remove/infill (2) chimneys, add sliding door to rear deck, add (n) north side window, new roof overhangDetails
basement structural foundaton and seismic upgrade, 1st fl. (n) bathroom, remodel (e) kitchen and bathroom, (n) front & rer deck/stair, remove/infill (2) chimneys, add sliding door to rear deck, add (n) north side window, new roof overhang | $125,000 |
| Sep 16, 2022 | In progress issued May 2024 | 2122 41st Av | remodel (e) kitchen, bathrooms & launtry room. install (n) windows at front side of property. remove (e) fireplace. build two floor addition in rear of property. build second story deck in rear of property.Details
remodel (e) kitchen, bathrooms & launtry room. install (n) windows at front side of property. remove (e) fireplace. build two floor addition in rear of property. build second story deck in rear of property. | $125,000 |
| Mar 18, 2022 | Completed final sign-off Mar 2023 | 427 Edinburgh St | construct new deck at rear wall. convert (e) window to new door for access to new deck. replace 4 rear yard windows. replace rotted siding with new siding.Details
construct new deck at rear wall. convert (e) window to new door for access to new deck. replace 4 rear yard windows. replace rotted siding with new siding. | $48,000 |
| Jun 27, 2019 | Completed final sign-off Aug 2021 | 455 Magellan Av | demolition of (e) raised deck at second floor & replacement with (n) deck & stair structure with fire rated walls where required within the same footprint.Details
demolition of (e) raised deck at second floor & replacement with (n) deck & stair structure with fire rated walls where required within the same footprint. | $20,000 |
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 300 Anzavista Av | to comply with complaint #201848491, #10, replace the deck wood, 5pcs, 3'x3', install the water heater, 100 gal in same locaton, change one electrict outlet for laundry roomDetails
to comply with complaint #201848491, #10, replace the deck wood, 5pcs, 3'x3', install the water heater, 100 gal in same locaton, change one electrict outlet for laundry room | $2,000 |
| Jul 20, 2018 | Completed final sign-off Apr 2025 | 1270 31st Av | 1 story rear deckDetails
1 story rear deck | $3,000 |
| Feb 16, 2017 | Completed final sign-off Jun 2017 | 27 West Portal Av | kitchen and bathroom remodeling and deck repair (less than 50%).Details
kitchen and bathroom remodeling and deck repair (less than 50%). | $25,000 |
| Jan 23, 2017 | Completed final sign-off Apr 2018 | 53 Teddy Av | ground floor: convert open-air entry (lightwell) to living space ; add bedroom & full bathroom behind garage. replace water heater to tankless type & install lighting, switches & receptacles. construction deck at rear of property & concrete retaining wall.Details
ground floor: convert open-air entry (lightwell) to living space ; add bedroom & full bathroom behind garage. replace water heater to tankless type & install lighting, switches & receptacles. construction deck at rear of property & concrete retaining wall. | $75,000 |
| Jan 20, 2015 | Completed final sign-off Nov 2015 | 643 43rd Av | 2nd floor: construct wooden deck and staircase at rear of property. ground floor: legalize extg family room. add bedroom, full bathroom, exercise room, sauna room, perform voluntary seismic strengthening. install lighting, switches, & receptacles.Details
2nd floor: construct wooden deck and staircase at rear of property. ground floor: legalize extg family room. add bedroom, full bathroom, exercise room, sauna room, perform voluntary seismic strengthening. install lighting, switches, & receptacles. | $60,000 |
| Sep 25, 2013 | Completed final sign-off Mar 2015 | 2721 Noriega St | deck at 2nd floor was enclosed w/o permit. this application is to legalize as conditioned. habitable space (annex to bedroom 2 ).Details
deck at 2nd floor was enclosed w/o permit. this application is to legalize as conditioned. habitable space (annex to bedroom 2 ). | $6,000 |