Back to bathroom remodel contractors
Jpg Home Improvement Inc
- Based in
- Burlingame
- On San Francisco permits
- May 2011 to Sep 2024
- Last 24 months
- 0 permits filed
91 permits since 2000: 80 completed, 3 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
39 bathroom remodel permits: 35 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 6 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2023 | Completed final sign-off May 2024 | 72 Westgate Dr | revision to permit 202303203963. reconfigure 1/f bedroom and bath.Details
revision to permit 202303203963. reconfigure 1/f bedroom and bath. | |
| Jun 13, 2023 | Completed final sign-off May 2024 | 1103 Bowdoin St | basement structural foundaton and seismic upgrade, 1st fl. (n) bathroom, remodel (e) kitchen and bathroom, (n) front & rer deck/stair, remove/infill (2) chimneys, add sliding door to rear deck, add (n) north side window, new roof overhangDetails
basement structural foundaton and seismic upgrade, 1st fl. (n) bathroom, remodel (e) kitchen and bathroom, (n) front & rer deck/stair, remove/infill (2) chimneys, add sliding door to rear deck, add (n) north side window, new roof overhang | $125,000 |
| Mar 20, 2023 | Completed final sign-off May 2024 | 72 Westgate Dr | interior renovation of an (e) bldg: demo, reconfifuration kitchen layout, construct new bedroom, family rm, bathroom in basement level. included electric & plumbing, hvac modificatin as necessary. add approx 828 sf of living space in basement.Details
interior renovation of an (e) bldg: demo, reconfifuration kitchen layout, construct new bedroom, family rm, bathroom in basement level. included electric & plumbing, hvac modificatin as necessary. add approx 828 sf of living space in basement. | $100,000 |
| Jan 6, 2023 | Completed final sign-off Jun 2023 | 425 Sawyer St | bathroom remodel: with 1 new shower pan. run new electrical wire throughout the 2nd floor (except kitchen). replace electrical panel to 125a.Details
bathroom remodel: with 1 new shower pan. run new electrical wire throughout the 2nd floor (except kitchen). replace electrical panel to 125a. | $20,000 |
| Oct 21, 2022 | Completed final sign-off Feb 2023 | 2224 Clay St | add full bathroom. work to be performed at ground floor only.Details
add full bathroom. work to be performed at ground floor only. | $15,000 |
| Sep 16, 2022 | In progress issued May 2024 | 2122 41st Av | remodel (e) kitchen, bathrooms & launtry room. install (n) windows at front side of property. remove (e) fireplace. build two floor addition in rear of property. build second story deck in rear of property.Details
remodel (e) kitchen, bathrooms & launtry room. install (n) windows at front side of property. remove (e) fireplace. build two floor addition in rear of property. build second story deck in rear of property. | $125,000 |
| Aug 31, 2022 | Completed final sign-off Mar 2023 | 1531 California St | remodel one kitchen and one hallway bathroom. change bathtub to a shower. add a subpanel.Details
remodel one kitchen and one hallway bathroom. change bathtub to a shower. add a subpanel. | $28,000 |
| Jun 6, 2022 | Completed final sign-off Dec 2022 | 626 Belvedere St | addition of bathroom, converting master bedroom closet into bathroom. 1)remove closet door, shelving, flooring, add new closet. 2) move wall to extend 18" into bedroom, add pocket door. 3)add shower, sink, toilet and pony wall between shower and sink. 4)add window into interior stairwell.Details
addition of bathroom, converting master bedroom closet into bathroom. 1)remove closet door, shelving, flooring, add new closet. 2) move wall to extend 18" into bedroom, add pocket door. 3)add shower, sink, toilet and pony wall between shower and sink. 4)add window into interior stairwell. | $30,000 |
| May 11, 2022 | Completed final sign-off May 2023 | 1547 46th Av | construct 1 bedroom, 1 media room, 1 full bath & family room at g/f. remodel (e) kitchen, bathroom, add 1 full bath & replace (e) sheet rock w/ new at 2/f.Details
construct 1 bedroom, 1 media room, 1 full bath & family room at g/f. remodel (e) kitchen, bathroom, add 1 full bath & replace (e) sheet rock w/ new at 2/f. | $150,000 |
| Aug 13, 2021 | Completed final sign-off Mar 2022 | 2224 Clay St | work to be performed on 3rd fl only. reconfigure and remodel master bathroom.Details
work to be performed on 3rd fl only. reconfigure and remodel master bathroom. | $16,000 |
| Jan 13, 2021 | Completed final sign-off Nov 2021 | 2224 Clay St | 3/f - convert 3/4 bath to full bath and remodel 1/4 bathDetails
3/f - convert 3/4 bath to full bath and remodel 1/4 bath | $13,000 |
| Sep 8, 2020 | Completed final sign-off Feb 2021 | 2224 Clay St | remodel a kitchen & bath at 2nd floor. no walls & doors to be removed. upgrade the main panel to be 200 amp ready.add 2 sub-panels , add new lights & outlets throughout the house.Details
remodel a kitchen & bath at 2nd floor. no walls & doors to be removed. upgrade the main panel to be 200 amp ready.add 2 sub-panels , add new lights & outlets throughout the house. | $28,000 |
| Jul 22, 2020 | Completed final sign-off Nov 2020 | 1376 De Haro St | bathroom remodel in-kind. no change to flooe plan. replace fixtures, re-tile shower & floor. replace 2 vanity lights, keep exhaust fan.Details
bathroom remodel in-kind. no change to flooe plan. replace fixtures, re-tile shower & floor. replace 2 vanity lights, keep exhaust fan. | $15,000 |
| Feb 24, 2020 | Completed final sign-off Jan 2021 | 2218 20th Av | legalized unpermitted space (e) in ground floor rear (study, bedroom & bath) which was damaged from plumbing leak from bathroom above. no change to exteriorDetails
legalized unpermitted space (e) in ground floor rear (study, bedroom & bath) which was damaged from plumbing leak from bathroom above. no change to exterior | $28,500 |
| Dec 31, 2019 | Completed final sign-off Feb 2020 | 2218 20th Av | remove water damaged sheetrock and tile floor in bathroom. remodel bathroom, new sheetrock, tile and fixtures. no structural work. separate electrical and plumbing permit.Details
remove water damaged sheetrock and tile floor in bathroom. remodel bathroom, new sheetrock, tile and fixtures. no structural work. separate electrical and plumbing permit. | $8,000 |
| Mar 20, 2019 | Completed final sign-off Dec 2020 | 455 Magellan Av | interior remodel - rleocate family rm, add new bedroom, bath & laundry on 1st fl, kitchen, family rm and powderroom remodel on2nd fl, 3rd fl remodel of existing bedrooms, 2 baths & construction of 3rd bath.Details
interior remodel - rleocate family rm, add new bedroom, bath & laundry on 1st fl, kitchen, family rm and powderroom remodel on2nd fl, 3rd fl remodel of existing bedrooms, 2 baths & construction of 3rd bath. | $550,000 |
| Jan 4, 2019 | Completed final sign-off Feb 2019 | 2147 39th Av | bathroom remodel change the tub to a shower , adding 4 reccessed lights & a fan, 2 outlets no change in size 5x8Details
bathroom remodel change the tub to a shower , adding 4 reccessed lights & a fan, 2 outlets no change in size 5x8 | $9,000 |
| Nov 14, 2018 | Expired or cancelled expired Sep 2024 | 49 Ellington Av | remodel kitchen change new kitchen cabinet w/ sink, bathroom sink. no other work in bathroom.Details
remodel kitchen change new kitchen cabinet w/ sink, bathroom sink. no other work in bathroom. | $7,000 |
| Dec 11, 2017 | Completed final sign-off Dec 2017 | 4489 17th St | work in unit #2: remodel bathroom, no change of (e) layout more or less 40 sq. ft.Details
work in unit #2: remodel bathroom, no change of (e) layout more or less 40 sq. ft. | $12,000 |
| Nov 15, 2017 | Expired or cancelled cancelled May 2018 | 733 Garfield St | to comply nov#201709286 & 201788341- add one media room, one bedroom and one full bath @ garage.Details
to comply nov#201709286 & 201788341- add one media room, one bedroom and one full bath @ garage. | $40,000 |
| Oct 10, 2017 | Completed final sign-off Nov 2017 | 1742 Fitzgerald Av | bathroom remodel on the 2nd floor. maher naDetails
bathroom remodel on the 2nd floor. maher na | $9,000 |
| Apr 21, 2017 | Completed final sign-off Nov 2017 | 741 26th Av | remdoel 1 kitchen & 2 baths.Details
remdoel 1 kitchen & 2 baths. | $20,000 |
| Feb 16, 2017 | Completed final sign-off Jun 2017 | 27 West Portal Av | kitchen and bathroom remodeling and deck repair (less than 50%).Details
kitchen and bathroom remodeling and deck repair (less than 50%). | $25,000 |
| Feb 7, 2017 | Completed final sign-off Mar 2017 | 880 Silver Av | bathroom remodeling, replacr tile, tub vanity toilet, no sheetrock removedDetails
bathroom remodeling, replacr tile, tub vanity toilet, no sheetrock removed | $6,000 |
| Jan 23, 2017 | Completed final sign-off Apr 2018 | 53 Teddy Av | ground floor: convert open-air entry (lightwell) to living space ; add bedroom & full bathroom behind garage. replace water heater to tankless type & install lighting, switches & receptacles. construction deck at rear of property & concrete retaining wall.Details
ground floor: convert open-air entry (lightwell) to living space ; add bedroom & full bathroom behind garage. replace water heater to tankless type & install lighting, switches & receptacles. construction deck at rear of property & concrete retaining wall. | $75,000 |
| Jan 26, 2016 | Completed final sign-off Feb 2016 | 2385 Ocean Av | kitchen - replace cabinets and tiles - bathroom - replace vainity, toilet and tilesDetails
kitchen - replace cabinets and tiles - bathroom - replace vainity, toilet and tiles | $6,000 |
| Aug 3, 2015 | Completed final sign-off Oct 2015 | 2723 40th Av | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $14,000 |
| Jun 30, 2015 | Completed final sign-off Jan 2016 | 240 Gaven St | interior remodel - add one bedroom, one family room & one full bath at ground floor.Details
interior remodel - add one bedroom, one family room & one full bath at ground floor. | $40,000 |
| Apr 9, 2015 | Completed final sign-off Sep 2017 | 1493 Newcomb Av | add gym,study rm, theater, half bath & 2 dormers @ attic flr. add 2 bedrms, fam,full bath & wet bar @ 1st flr. add full bath,utility,balcony & relocate kitchen & remodel (e) bedrm & bath @ 2nd flr. relocate int. stair, add lights fixtures.Details
add gym,study rm, theater, half bath & 2 dormers @ attic flr. add 2 bedrms, fam,full bath & wet bar @ 1st flr. add full bath,utility,balcony & relocate kitchen & remodel (e) bedrm & bath @ 2nd flr. relocate int. stair, add lights fixtures. | $80,000 |
| Feb 20, 2015 | Completed final sign-off Nov 2015 | 601 Van Ness Av | renovation kitchen, bathroom, add recessed lighting, outlets, replace (e) electrical panel, add new drain pipe from (e)Details
renovation kitchen, bathroom, add recessed lighting, outlets, replace (e) electrical panel, add new drain pipe from (e) | $35,000 |
| Jan 20, 2015 | Completed final sign-off Nov 2015 | 643 43rd Av | 2nd floor: construct wooden deck and staircase at rear of property. ground floor: legalize extg family room. add bedroom, full bathroom, exercise room, sauna room, perform voluntary seismic strengthening. install lighting, switches, & receptacles.Details
2nd floor: construct wooden deck and staircase at rear of property. ground floor: legalize extg family room. add bedroom, full bathroom, exercise room, sauna room, perform voluntary seismic strengthening. install lighting, switches, & receptacles. | $60,000 |
| May 28, 2014 | Completed final sign-off Jan 2015 | 1406 Thomas Av | 3rd floor: add full bath; replace 1 window. 2nd floor: reconfigure floor plan for kitchen, dining rm, master bedrm; add half bath w/ new window; replace 3 windows. ground floor: relocate and replace water heater and furnace. install light switches & receptacles.Details
3rd floor: add full bath; replace 1 window. 2nd floor: reconfigure floor plan for kitchen, dining rm, master bedrm; add half bath w/ new window; replace 3 windows. ground floor: relocate and replace water heater and furnace. install light switches & receptacles. | $48,000 |
| Apr 11, 2014 | Completed final sign-off May 2015 | 1895 Funston Av | remodel kitchen, bathroom and one full bath at upper floor per plan.Details
remodel kitchen, bathroom and one full bath at upper floor per plan. | $29,700 |
| Apr 11, 2014 | Never finaled issued Apr 2014, no final | 1052 Filbert St | to comply with nov #201456491 - repair ceiling drywall due to water leak. previously installed a tankless water heater by another contractor without permit; a bathroom ceiling vent/fan and an outlet previvously installed without a permit work 1054 - 1056.Details
to comply with nov #201456491 - repair ceiling drywall due to water leak. previously installed a tankless water heater by another contractor without permit; a bathroom ceiling vent/fan and an outlet previvously installed without a permit work 1054 - 1056. | $2,000 |
| Mar 20, 2014 | Completed final sign-off May 2014 | 855 Arguello Bl | remodel (e) bathroom w/a new bathtub, new pocket door, move (e) window w/(n) window.Details
remodel (e) bathroom w/a new bathtub, new pocket door, move (e) window w/(n) window. | $8,000 |
| Dec 5, 2013 | Completed final sign-off Nov 2015 | 4217 21st St | work @ unit# 4219 only. remodel (e) kitchen & bath. add 47.75 sq ft to (e) kitchen by extending horizontal 4'-o" 4219 onlyDetails
work @ unit# 4219 only. remodel (e) kitchen & bath. add 47.75 sq ft to (e) kitchen by extending horizontal 4'-o" 4219 only | $20,000 |
| Apr 24, 2013 | Completed final sign-off Aug 2013 | 646 41st Av | kitchen & 2 bathrooms (upstairs) remodel, repl kitchen cabinets, sink, faucet, light and outlet, repl bath tub, faucet, vanity, cabinet, light and outlet, floor tilingDetails
kitchen & 2 bathrooms (upstairs) remodel, repl kitchen cabinets, sink, faucet, light and outlet, repl bath tub, faucet, vanity, cabinet, light and outlet, floor tiling | $15,000 |
| Apr 22, 2013 | Completed final sign-off Oct 2013 | 201 Webster St | work to be performed at 1st floor in 201 webster street only. reconfigure and remodel kitchen, remodel bathroom. install lighting. switches and receptacles.Details
work to be performed at 1st floor in 201 webster street only. reconfigure and remodel kitchen, remodel bathroom. install lighting. switches and receptacles. | $22,000 |
| Mar 14, 2013 | Completed final sign-off Oct 2013 | 362 11th Av | upgrade/re-arrange existing rooms, bathroom & re-wire electrical lighting. all work at ground floor.Details
upgrade/re-arrange existing rooms, bathroom & re-wire electrical lighting. all work at ground floor. | $28,000 |