Back to kitchen remodel contractors
Jonathan A Rauh
- Based in
- Muir Beach
- On San Francisco permits
- Jan 2000 to Jun 2024
- Last 24 months
- 0 permits filed
59 permits since 2000: 40 completed, 8 never finaled, 11 expired or cancelled.
Of the 8 never-finaled permits, 2 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 255 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2015 | Completed final sign-off Mar 2016 | 128 Jordan Av | construct new family room, bath, and utility room at 1st level. install new cabinetry at 2nd floor kitchen. renovate extg stair railing at kitchenDetails
construct new family room, bath, and utility room at 1st level. install new cabinetry at 2nd floor kitchen. renovate extg stair railing at kitchen | $60,000 |
| Sep 30, 2014 | Completed final sign-off Jul 2015 | 427 Spruce St | renovate (e) kitchen & (e) bath, and relocate (e) laundry room at third level.Details
renovate (e) kitchen & (e) bath, and relocate (e) laundry room at third level. | $55,000 |
| May 5, 2014 | Completed final sign-off Jan 2015 | 2475 Filbert St | demo walls and fireplace between kitchen and dining rm and sunroom. remodel kitchen. reconfigure and remodel master bath and closet. replace rear windows in kindDetails
demo walls and fireplace between kitchen and dining rm and sunroom. remodel kitchen. reconfigure and remodel master bath and closet. replace rear windows in kind | $80,000 |
| Oct 21, 2011 | Completed final sign-off Sep 2012 | 2750 Lyon St | remodel kitchen cabinets & counter tops, updage electrical. remodel 2 bathrooms and 1 powder room tile & cabinets, also update eletrical. remove closets on 3 floors (verify closet walls, non structural). lighting per cec 150 (k)8 & cec 150(k)10.Details
remodel kitchen cabinets & counter tops, updage electrical. remodel 2 bathrooms and 1 powder room tile & cabinets, also update eletrical. remove closets on 3 floors (verify closet walls, non structural). lighting per cec 150 (k)8 & cec 150(k)10. | $60,000 |
| Dec 2, 2010 | Completed final sign-off Aug 2011 | 2445 Filbert St | change cabinets, tile, countertops, fixtures in kitchen, change bathroom fixtures & tile in 2 full baths and two 1/2 baths, change flooring in family room, install new lighting.Details
change cabinets, tile, countertops, fixtures in kitchen, change bathroom fixtures & tile in 2 full baths and two 1/2 baths, change flooring in family room, install new lighting. | $60,000 |
| Aug 3, 2006 | Completed final sign-off Apr 2007 | 2791 Clay St | replace kitchen cabinets, countertop, flooring, fixtures, windows and updated electric & plumbing. and 3rd level bathroom.Details
replace kitchen cabinets, countertop, flooring, fixtures, windows and updated electric & plumbing. and 3rd level bathroom. | $75,000 |
| May 15, 2006 | Expired or cancelled expired Oct 2008 | 2 Genoa Pl | apt. # 3 & 8 : replace kitchen cabinets and plumbing fixtures, replace bath fixtures and replace tile in bathroom. update electrical where accessibleDetails
apt. # 3 & 8 : replace kitchen cabinets and plumbing fixtures, replace bath fixtures and replace tile in bathroom. update electrical where accessible | $30,000 |
| May 15, 2006 | Completed final sign-off Jun 2007 | 2789 Clay St | replace kitchen and bath fixtures on g/f, repair foundation at rear of building, repair dry rot and or termite damage on g/f, replace eectrical and plumbing where accessible to upgradeDetails
replace kitchen and bath fixtures on g/f, repair foundation at rear of building, repair dry rot and or termite damage on g/f, replace eectrical and plumbing where accessible to upgrade | $30,000 |
| Feb 22, 2005 | Expired or cancelled expired Nov 2006 | 2453 Filbert St | replace kitchen cabinets & fixtures,update plumbing & electrical,replace flooring.repair/replace 3Details
replace kitchen cabinets & fixtures,update plumbing & electrical,replace flooring.repair/replace 3 | $125,000 |
| Apr 7, 2004 | Completed final sign-off May 2004 | 42 02nd St | remove 2 walls & kitchenette,provide additional floor plugs,change light fix.provide ada assistedDetails
remove 2 walls & kitchenette,provide additional floor plugs,change light fix.provide ada assisted | $10,000 |
| Mar 9, 2000 | Completed final sign-off Oct 2000 | 149 Jordan Av | remodel kitchen & bathrm. remove partition in kitichen, new lightiing in livingrm, diningrm & familyDetails
remodel kitchen & bathrm. remove partition in kitichen, new lightiing in livingrm, diningrm & family | $85,000 |