Jonathan A Rauh
- Based in
- Muir Beach
- On San Francisco permits
- Jan 2000 to Jun 2024
- Last 24 months
- 0 permits filed
59 permits since 2000: 40 completed, 8 never finaled, 11 expired or cancelled.
Of the 8 never-finaled permits, 2 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 17 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 255 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 28, 2016 | Completed final sign-off Sep 2017 | 302 Maple St | remodel 2 bathrooms & 1 powder room. add 2 skylights. skylights to be sprinklered under deferred submittal. n/a ordinance #155-13Details
remodel 2 bathrooms & 1 powder room. add 2 skylights. skylights to be sprinklered under deferred submittal. n/a ordinance #155-13 | $50,000 |
| Jul 11, 2016 | Completed final sign-off Jun 2017 | 149 Jordan Av | replace tile in bathroom, install new plumbing fixtures and light fixtures. n/a ordinance #155-13Details
replace tile in bathroom, install new plumbing fixtures and light fixtures. n/a ordinance #155-13 | $18,000 |
| Jun 17, 2016 | Completed final sign-off Apr 2018 | 4012 22nd St | replace bathroom fixtures, replace vanity, install new light fixtures and exhaust fanDetails
replace bathroom fixtures, replace vanity, install new light fixtures and exhaust fan | $22,000 |
| Jul 1, 2015 | Completed final sign-off Mar 2016 | 128 Jordan Av | construct new family room, bath, and utility room at 1st level. install new cabinetry at 2nd floor kitchen. renovate extg stair railing at kitchenDetails
construct new family room, bath, and utility room at 1st level. install new cabinetry at 2nd floor kitchen. renovate extg stair railing at kitchen | $60,000 |
| Sep 30, 2014 | Completed final sign-off Jun 2015 | 427 Spruce St | remodel two (e) bathrooms in-kind at fourth levelDetails
remodel two (e) bathrooms in-kind at fourth level | $26,250 |
| Sep 30, 2014 | Completed final sign-off Jul 2015 | 427 Spruce St | renovate (e) kitchen & (e) bath, and relocate (e) laundry room at third level.Details
renovate (e) kitchen & (e) bath, and relocate (e) laundry room at third level. | $55,000 |
| May 5, 2014 | Completed final sign-off Jan 2015 | 2475 Filbert St | demo walls and fireplace between kitchen and dining rm and sunroom. remodel kitchen. reconfigure and remodel master bath and closet. replace rear windows in kindDetails
demo walls and fireplace between kitchen and dining rm and sunroom. remodel kitchen. reconfigure and remodel master bath and closet. replace rear windows in kind | $80,000 |
| Oct 17, 2012 | Completed final sign-off Jan 2013 | 3362 Clay St | replace shower pans in 2 bathrooms, replace tile in two bathrooms, replace vanity in one of 2 bathrooms, replace in kind - no structural work.Details
replace shower pans in 2 bathrooms, replace tile in two bathrooms, replace vanity in one of 2 bathrooms, replace in kind - no structural work. | $19,000 |
| Apr 17, 2012 | Never finaled issued Apr 2012, no final | 2445 Filbert St | replace (e) stairs from basement garage to 1st floor, relocate (e) 1st floor bathroomDetails
replace (e) stairs from basement garage to 1st floor, relocate (e) 1st floor bathroom | $75,000 |
| Dec 29, 2011 | Completed final sign-off Sep 2012 | 2750 Lyon St | first floor:404 sq ft:new entry,media room, bathroom and laundry room.new garage door.2nd floor and 3rd floors: remove extg closets at stairwell, new open rail stair case. new skylight at roof.Details
first floor:404 sq ft:new entry,media room, bathroom and laundry room.new garage door.2nd floor and 3rd floors: remove extg closets at stairwell, new open rail stair case. new skylight at roof. | $80,000 |
| Oct 21, 2011 | Completed final sign-off Sep 2012 | 2750 Lyon St | remodel kitchen cabinets & counter tops, updage electrical. remodel 2 bathrooms and 1 powder room tile & cabinets, also update eletrical. remove closets on 3 floors (verify closet walls, non structural). lighting per cec 150 (k)8 & cec 150(k)10.Details
remodel kitchen cabinets & counter tops, updage electrical. remodel 2 bathrooms and 1 powder room tile & cabinets, also update eletrical. remove closets on 3 floors (verify closet walls, non structural). lighting per cec 150 (k)8 & cec 150(k)10. | $60,000 |
| Dec 2, 2010 | Completed final sign-off Aug 2011 | 2445 Filbert St | change cabinets, tile, countertops, fixtures in kitchen, change bathroom fixtures & tile in 2 full baths and two 1/2 baths, change flooring in family room, install new lighting.Details
change cabinets, tile, countertops, fixtures in kitchen, change bathroom fixtures & tile in 2 full baths and two 1/2 baths, change flooring in family room, install new lighting. | $60,000 |
| Feb 3, 2009 | Completed final sign-off May 2009 | 1900 Green St | construct new bathroom at existing 1st floor hallDetails
construct new bathroom at existing 1st floor hall | $11,000 |
| Jun 19, 2007 | Completed final sign-off Sep 2007 | 2445 Pacific Av | repalce bathroom fixtures and tile in 2 bathrooms on the 2nd floor. replace tile update electrical and plumbing as required by code.Details
repalce bathroom fixtures and tile in 2 bathrooms on the 2nd floor. replace tile update electrical and plumbing as required by code. | $32,000 |
| Aug 3, 2006 | Completed final sign-off Apr 2007 | 2791 Clay St | replace kitchen cabinets, countertop, flooring, fixtures, windows and updated electric & plumbing. and 3rd level bathroom.Details
replace kitchen cabinets, countertop, flooring, fixtures, windows and updated electric & plumbing. and 3rd level bathroom. | $75,000 |
| May 15, 2006 | Expired or cancelled expired Oct 2008 | 2 Genoa Pl | apt. # 3 & 8 : replace kitchen cabinets and plumbing fixtures, replace bath fixtures and replace tile in bathroom. update electrical where accessibleDetails
apt. # 3 & 8 : replace kitchen cabinets and plumbing fixtures, replace bath fixtures and replace tile in bathroom. update electrical where accessible | $30,000 |
| May 15, 2006 | Completed final sign-off Jun 2007 | 2789 Clay St | replace kitchen and bath fixtures on g/f, repair foundation at rear of building, repair dry rot and or termite damage on g/f, replace eectrical and plumbing where accessible to upgradeDetails
replace kitchen and bath fixtures on g/f, repair foundation at rear of building, repair dry rot and or termite damage on g/f, replace eectrical and plumbing where accessible to upgrade | $30,000 |
| Mar 21, 2006 | Completed final sign-off Aug 2006 | 128 Jordan Av | bathroom renovation update electrical & plumbing. replace fixtures, tile, flooring, no structural work.Details
bathroom renovation update electrical & plumbing. replace fixtures, tile, flooring, no structural work. | $15,000 |
| Aug 23, 2005 | Expired or cancelled expired Jul 2007 | 2453 Filbert St | move bath to new space under (e) home, move furnace to new space under (e) home.no exterior changes or modifications.Details
move bath to new space under (e) home, move furnace to new space under (e) home.no exterior changes or modifications. | $25,000 |
| Sep 14, 2000 | Completed final sign-off Mar 2001 | 3845 Jackson St | remove plaster & replace in 2 bedrooms & bathroom,change all plbg & elec to new,install 2 layersDetails
remove plaster & replace in 2 bedrooms & bathroom,change all plbg & elec to new,install 2 layers | $25,000 |