Back to kitchen remodel contractors
John Construction Builder
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to Sep 2026
- Last 24 months
- 8 permits filed
41 permits since 2000: 29 completed, 6 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 13 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2026 | In progress issued Mar 2026 | 246 20th Av | revision to pa 202601083485: removing 1 kitchen remodel from scope of work. will only be completing 1 bathroom remodel. electrical and plumbing as needed. replacing sheetrock on 2nd flr bathroom and bedroom.Details
revision to pa 202601083485: removing 1 kitchen remodel from scope of work. will only be completing 1 bathroom remodel. electrical and plumbing as needed. replacing sheetrock on 2nd flr bathroom and bedroom. | $10,000 |
| Jan 8, 2026 | In progress issued Jan 2026 | 246 20th Av | remodel (1) kitchen in kind. remodel (1) bathroom in kind. plumbing and electrical as needed. no walls removed.Details
remodel (1) kitchen in kind. remodel (1) bathroom in kind. plumbing and electrical as needed. no walls removed. | $25,000 |
| Jun 10, 2025 | Completed final sign-off Aug 2025 | 2729 Lombard St | in-kind remodel of kitchen and bathroom for unit 4: no change to floor layout, no change to wall layout, no structural work.Details
in-kind remodel of kitchen and bathroom for unit 4: no change to floor layout, no change to wall layout, no structural work. | $30,000 |
| Jun 10, 2025 | Completed final sign-off Aug 2025 | 2729 Lombard St | unit 6-in-kind remodel of kitchen and bathroom for unit 6: no change to floor layout. no change to wall layout, no structural work.Details
unit 6-in-kind remodel of kitchen and bathroom for unit 6: no change to floor layout. no change to wall layout, no structural work. | $30,000 |
| Nov 17, 2020 | Completed final sign-off May 2023 | 1050 Pine St | #6: interior remodel. relocate kitchen. add a bedroom & bathroom. remodel existing bathroom.Details
#6: interior remodel. relocate kitchen. add a bedroom & bathroom. remodel existing bathroom. | $50,000 |
| Apr 29, 2019 | Never finaled issued Apr 2019, no final | 3552 20th St | upgrade electrical in all units and ground floor commercial, replace & patch sheetrock as needed, remodel kitchen & bathroom in all residential units.Details
upgrade electrical in all units and ground floor commercial, replace & patch sheetrock as needed, remodel kitchen & bathroom in all residential units. | $60,000 |
| Mar 13, 2019 | Expired or cancelled cancelled Apr 2021 | 1700 Jones St | remodel kitchen and (2) bathrooms. remodel in existing locationsDetails
remodel kitchen and (2) bathrooms. remodel in existing locations | $19,000 |
| Aug 28, 2018 | Completed final sign-off Feb 2019 | 2010 Lombard St | 3rd flr - interior remodel (e) kitchen adn add a full bathroom in unit 2010bDetails
3rd flr - interior remodel (e) kitchen adn add a full bathroom in unit 2010b | $25,000 |
| Feb 2, 2018 | Completed final sign-off May 2018 | 1819 Lyon St | #2 -kitchen - open hole for install ceiling lights 2' x2' 15 holes. remodeling a kitchenDetails
#2 -kitchen - open hole for install ceiling lights 2' x2' 15 holes. remodeling a kitchen | $9,000 |
| Jan 22, 2018 | Completed final sign-off Sep 2018 | 2012 Lombard St | unit a: 4th fl - remodel existing kitchen and bathroom; add full bathroomDetails
unit a: 4th fl - remodel existing kitchen and bathroom; add full bathroom | $30,000 |
| Dec 7, 2017 | Completed final sign-off Sep 2018 | 2012 Lombard St | unit b - remodel kitchen and add a full bathroomDetails
unit b - remodel kitchen and add a full bathroom | $30,000 |
| Aug 29, 2017 | Completed final sign-off May 2023 | 1050 Pine St | add additional unit per ord #162.16. remove garage. (n) unit includes kitchen & (2) bathrooms. soft story submitted #2017-08-14-4682.Details
add additional unit per ord #162.16. remove garage. (n) unit includes kitchen & (2) bathrooms. soft story submitted #2017-08-14-4682. | $75,000 |
| Aug 10, 2015 | Completed final sign-off Jan 2016 | 228 Chicago Wy | remodel extg kitchen. replace counter, cabinets, flooring, remove/re-built closet, & extended counter to double sink. all work at 2nd floor.Details
remodel extg kitchen. replace counter, cabinets, flooring, remove/re-built closet, & extended counter to double sink. all work at 2nd floor. | $12,000 |
| May 8, 2014 | Never finaled issued May 2014, no final | 1155 Jones St | remodel kitchen and bathroom, upgrade electric in the apt, install new lights in kitchen and bathroom to conform with title 24, no structural work no window or door change work for apt 505, 205 & 504; compliance with ord 155-13 not requiredDetails
remodel kitchen and bathroom, upgrade electric in the apt, install new lights in kitchen and bathroom to conform with title 24, no structural work no window or door change work for apt 505, 205 & 504; compliance with ord 155-13 not required | $75,000 |
| Apr 29, 2014 | Completed final sign-off Sep 2014 | 3115 Balboa St | remodel (e) kitchen/bathroom, convert (e) dining room into bedroom & remove (e) shower stall convert to toilet room for 2nd & 3rd floor.Details
remodel (e) kitchen/bathroom, convert (e) dining room into bedroom & remove (e) shower stall convert to toilet room for 2nd & 3rd floor. | $32,000 |
| Mar 15, 2013 | Completed final sign-off Sep 2013 | 1618 Polk St | updating the electric in apt #1 @ 1618 polk st sf, remodeling kitchen and bathroomDetails
updating the electric in apt #1 @ 1618 polk st sf, remodeling kitchen and bathroom | $29,000 |
| Apr 27, 2011 | Completed final sign-off Aug 2011 | 1618 Polk St | remodel kitchen upgrade plumbing and elec inside uinte 18. completely paint unit and refinish hardwood floors. new lighting comply with cec 150 k. no structural work. no window door, ceiling or wall workDetails
remodel kitchen upgrade plumbing and elec inside uinte 18. completely paint unit and refinish hardwood floors. new lighting comply with cec 150 k. no structural work. no window door, ceiling or wall work | $26,000 |
| Mar 23, 2011 | Completed final sign-off Nov 2011 | 630 Cole St | replace cabinet, outlets, pipe kitchen. no structural workDetails
replace cabinet, outlets, pipe kitchen. no structural work | $4,900 |