Back to bathroom remodel contractors
John Construction Builder
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to Sep 2026
- Last 24 months
- 8 permits filed
41 permits since 2000: 29 completed, 6 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 17 completed, 3 in progress, 3 never finaled, 2 expired or cancelled. Typically 5 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2026 | In progress issued Mar 2026 | 246 20th Av | revision to pa 202601083485: removing 1 kitchen remodel from scope of work. will only be completing 1 bathroom remodel. electrical and plumbing as needed. replacing sheetrock on 2nd flr bathroom and bedroom.Details
revision to pa 202601083485: removing 1 kitchen remodel from scope of work. will only be completing 1 bathroom remodel. electrical and plumbing as needed. replacing sheetrock on 2nd flr bathroom and bedroom. | $10,000 |
| Jan 8, 2026 | In progress issued Jan 2026 | 246 20th Av | remodel (1) kitchen in kind. remodel (1) bathroom in kind. plumbing and electrical as needed. no walls removed.Details
remodel (1) kitchen in kind. remodel (1) bathroom in kind. plumbing and electrical as needed. no walls removed. | $25,000 |
| Jun 10, 2025 | Completed final sign-off Aug 2025 | 2729 Lombard St | in-kind remodel of kitchen and bathroom for unit 4: no change to floor layout, no change to wall layout, no structural work.Details
in-kind remodel of kitchen and bathroom for unit 4: no change to floor layout, no change to wall layout, no structural work. | $30,000 |
| Jun 10, 2025 | Completed final sign-off Aug 2025 | 2729 Lombard St | unit 6-in-kind remodel of kitchen and bathroom for unit 6: no change to floor layout. no change to wall layout, no structural work.Details
unit 6-in-kind remodel of kitchen and bathroom for unit 6: no change to floor layout. no change to wall layout, no structural work. | $30,000 |
| Oct 15, 2024 | Completed final sign-off Jul 2025 | 80 Chaves Av | interior remodel: convert existing storage to 1 bedroom, 1 media room, 1 home office, and 1 bathroom on ground floor. add 1 bath on 2nd floor. no exterior work.Details
interior remodel: convert existing storage to 1 bedroom, 1 media room, 1 home office, and 1 bathroom on ground floor. add 1 bath on 2nd floor. no exterior work. | $250,000 |
| Jun 4, 2024 | In progress issued Jun 2024 | 3558 20th St | revision to pa#201904299176 to add 1 master bathroom to 3rd floor unit. no change to egress or structural. revision to 202006088261 to change 2 tubs to 2 showers and remove living rm wall on 2nd fl unit (3556 20th st)Details
revision to pa#201904299176 to add 1 master bathroom to 3rd floor unit. no change to egress or structural. revision to 202006088261 to change 2 tubs to 2 showers and remove living rm wall on 2nd fl unit (3556 20th st) | $16,000 |
| Jan 19, 2024 | Completed final sign-off Oct 2024 | 1730 22nd Av | repair fire damage to comply with nov# 202303317. interior remodel, infill south lightwell, add 2 bedrooms, media room, and 2 baths on the ground floor and add 1.5 baths on the 2nd flr.Details
repair fire damage to comply with nov# 202303317. interior remodel, infill south lightwell, add 2 bedrooms, media room, and 2 baths on the ground floor and add 1.5 baths on the 2nd flr. | $250,000 |
| Feb 17, 2023 | Never finaled issued Feb 2023, no final | 3554 20th St | remove lightwell enclosure to comply w/nov# 202181498, add 1 bathroom to ground flr, unit#1. no change to egress or structural. all (e) lightwells to remain.Details
remove lightwell enclosure to comply w/nov# 202181498, add 1 bathroom to ground flr, unit#1. no change to egress or structural. all (e) lightwells to remain. | $50,000 |
| Sep 7, 2021 | Completed final sign-off May 2023 | 1050 Pine St | revision to approved permit 201708296351. revise ground floor adu layout, add 1 bedroom, 1 bath, 1 powder room and laundry. no change to egress. structural under soft story permits 201708144682 and 202002204996.Details
revision to approved permit 201708296351. revise ground floor adu layout, add 1 bedroom, 1 bath, 1 powder room and laundry. no change to egress. structural under soft story permits 201708144682 and 202002204996. | |
| Sep 7, 2021 | Expired or cancelled revoked Apr 2023 | 3552 20th St | revision to 201904299176, add 1 bath to gr fl unit 1. close lightwell at gr fl only. no change to egress or structural. comply w nov 201878063 and 202181498Details
revision to 201904299176, add 1 bath to gr fl unit 1. close lightwell at gr fl only. no change to egress or structural. comply w nov 201878063 and 202181498 | $30,000 |
| Jan 28, 2021 | Completed final sign-off May 2023 | 1050 Pine St | interior remodel of vacant apartments for unit #2 on 2nd fl. unit# 5 on 3rd fl. & unit #9 on 4th fl. add one full bath for unit #9 . enclose interior lightwell on 2nd-4th floors, no change to facade or egress, no structuralDetails
interior remodel of vacant apartments for unit #2 on 2nd fl. unit# 5 on 3rd fl. & unit #9 on 4th fl. add one full bath for unit #9 . enclose interior lightwell on 2nd-4th floors, no change to facade or egress, no structural | $75,000 |
| Nov 17, 2020 | Completed final sign-off May 2023 | 1050 Pine St | #6: interior remodel. relocate kitchen. add a bedroom & bathroom. remodel existing bathroom.Details
#6: interior remodel. relocate kitchen. add a bedroom & bathroom. remodel existing bathroom. | $50,000 |
| Apr 29, 2019 | Never finaled issued Apr 2019, no final | 3552 20th St | upgrade electrical in all units and ground floor commercial, replace & patch sheetrock as needed, remodel kitchen & bathroom in all residential units.Details
upgrade electrical in all units and ground floor commercial, replace & patch sheetrock as needed, remodel kitchen & bathroom in all residential units. | $60,000 |
| Mar 13, 2019 | Expired or cancelled cancelled Apr 2021 | 1700 Jones St | remodel kitchen and (2) bathrooms. remodel in existing locationsDetails
remodel kitchen and (2) bathrooms. remodel in existing locations | $19,000 |
| Jan 31, 2019 | Completed final sign-off Feb 2021 | 1362 07th Av | as built revision to pa 2018-0309-3290 relocate full bath on 1st floor. relocate full bath on 1st floor, add one bath on 3rd floor. minor bath layout changes on 4th floor.Details
as built revision to pa 2018-0309-3290 relocate full bath on 1st floor. relocate full bath on 1st floor, add one bath on 3rd floor. minor bath layout changes on 4th floor. | $20,000 |
| Aug 28, 2018 | Completed final sign-off Feb 2019 | 2010 Lombard St | 3rd flr - interior remodel (e) kitchen adn add a full bathroom in unit 2010bDetails
3rd flr - interior remodel (e) kitchen adn add a full bathroom in unit 2010b | $25,000 |
| Jan 22, 2018 | Completed final sign-off Sep 2018 | 2012 Lombard St | unit a: 4th fl - remodel existing kitchen and bathroom; add full bathroomDetails
unit a: 4th fl - remodel existing kitchen and bathroom; add full bathroom | $30,000 |
| Dec 7, 2017 | Completed final sign-off Sep 2018 | 2012 Lombard St | unit b - remodel kitchen and add a full bathroomDetails
unit b - remodel kitchen and add a full bathroom | $30,000 |
| Aug 29, 2017 | Completed final sign-off May 2023 | 1050 Pine St | add additional unit per ord #162.16. remove garage. (n) unit includes kitchen & (2) bathrooms. soft story submitted #2017-08-14-4682.Details
add additional unit per ord #162.16. remove garage. (n) unit includes kitchen & (2) bathrooms. soft story submitted #2017-08-14-4682. | $75,000 |
| Jun 20, 2014 | Completed final sign-off Sep 2014 | 3115 Balboa St | revision under app#201404294404. add one full bath and laundry at 2nd floor and 3rd floor.Details
revision under app#201404294404. add one full bath and laundry at 2nd floor and 3rd floor. | $22,000 |
| May 8, 2014 | Never finaled issued May 2014, no final | 1155 Jones St | remodel kitchen and bathroom, upgrade electric in the apt, install new lights in kitchen and bathroom to conform with title 24, no structural work no window or door change work for apt 505, 205 & 504; compliance with ord 155-13 not requiredDetails
remodel kitchen and bathroom, upgrade electric in the apt, install new lights in kitchen and bathroom to conform with title 24, no structural work no window or door change work for apt 505, 205 & 504; compliance with ord 155-13 not required | $75,000 |
| Apr 29, 2014 | Completed final sign-off Sep 2014 | 3115 Balboa St | remodel (e) kitchen/bathroom, convert (e) dining room into bedroom & remove (e) shower stall convert to toilet room for 2nd & 3rd floor.Details
remodel (e) kitchen/bathroom, convert (e) dining room into bedroom & remove (e) shower stall convert to toilet room for 2nd & 3rd floor. | $32,000 |
| Apr 29, 2014 | Completed final sign-off Sep 2014 | 3115 Balboa St | remodel existing bedroom, bathroom & rebuilt two bedrooms & one full bathroom & relocate water heaters/furnaces. all work at ground floor.Details
remodel existing bedroom, bathroom & rebuilt two bedrooms & one full bathroom & relocate water heaters/furnaces. all work at ground floor. | $28,000 |
| Mar 15, 2013 | Completed final sign-off Sep 2013 | 1618 Polk St | updating the electric in apt #1 @ 1618 polk st sf, remodeling kitchen and bathroomDetails
updating the electric in apt #1 @ 1618 polk st sf, remodeling kitchen and bathroom | $29,000 |
| Jun 7, 2011 | Completed final sign-off Aug 2011 | 1618 Polk St | remodel 1 bathroom, no change to walls windows doors @ residential; install new in-wall heater, lighting to comply with cec 150(k)Details
remodel 1 bathroom, no change to walls windows doors @ residential; install new in-wall heater, lighting to comply with cec 150(k) | $10,000 |