Jln Builders
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Jul 2019
- Last 24 months
- 0 permits filed
27 permits since 2000: 26 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 40 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2018 | Completed final sign-off Aug 2019 | 760 Dolores St | correction permit in response to planning enforcement #2018012875enf to remove non-conforming interconnecting stair between basement unit #2 & 3- story unit #1 above. install basement kitchenette restoring last permitted use as shown on appln #200206280275Details
correction permit in response to planning enforcement #2018012875enf to remove non-conforming interconnecting stair between basement unit #2 & 3- story unit #1 above. install basement kitchenette restoring last permitted use as shown on appln #200206280275 | $20,000 |
| Aug 15, 2018 | Completed final sign-off Jan 2019 | 1425 Shotwell St | new interior spiral stair to connect (e) ground level floor to 1st lev. add 1 bathroom & 1 bedroom on g/f. (n) concrete slab on g/f with new footings for sprial staircase and (n) load bearing wall. electrical & plumbing as required.Details
new interior spiral stair to connect (e) ground level floor to 1st lev. add 1 bathroom & 1 bedroom on g/f. (n) concrete slab on g/f with new footings for sprial staircase and (n) load bearing wall. electrical & plumbing as required. | $60,000 |
| Nov 3, 2017 | Completed final sign-off Feb 2018 | 2302 Divisadero St | scope of work at interior stairway at 2nd floor: refinish (e)treads & risers, new paint & tile & sheet rock, update electrical fixtures in same location. new sheet rock shall be no less than 5/8" type x gyp board.Details
scope of work at interior stairway at 2nd floor: refinish (e)treads & risers, new paint & tile & sheet rock, update electrical fixtures in same location. new sheet rock shall be no less than 5/8" type x gyp board. | $10,000 |
| Feb 2, 2017 | Completed final sign-off Dec 2018 | 630 Wawona St | lower level: remodel & upgrade of bedroom, reconfigure foyer & enclosure of (e) open stairwell. main level: reconfigure kitchen, powder room, office, bathroom & (2) bedrooms. upper level: demo (e) stair & build (n) stair, remodel master suite & bathroom, demo (e) roof to replace w/ (n) roof.Details
lower level: remodel & upgrade of bedroom, reconfigure foyer & enclosure of (e) open stairwell. main level: reconfigure kitchen, powder room, office, bathroom & (2) bedrooms. upper level: demo (e) stair & build (n) stair, remodel master suite & bathroom, demo (e) roof to replace w/ (n) roof. | $600,000 |
| Jun 16, 2016 | Completed final sign-off Jan 2017 | 277 Bradford St | remove (e) wall between kitchen and liv rm. renovate (e) kitchen, remove portion of wall between interior stair and liv rm. renovate/enlarge (e) bath. add 1 closet at ea bdrm. plumb/elec sep permit. interior work only, only struct at bsmt and 1st flDetails
remove (e) wall between kitchen and liv rm. renovate (e) kitchen, remove portion of wall between interior stair and liv rm. renovate/enlarge (e) bath. add 1 closet at ea bdrm. plumb/elec sep permit. interior work only, only struct at bsmt and 1st fl | $85,000 |