Back to kitchen remodel contractors
Jln Builders
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Jul 2019
- Last 24 months
- 0 permits filed
27 permits since 2000: 26 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 32 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2019 | Completed final sign-off Jul 2019 | 1207 Indiana St | unit #7 remodel kitchen, partial remodel in 2 bathrooms. bathroom scope is replacement of vanity. n/a for maherDetails
unit #7 remodel kitchen, partial remodel in 2 bathrooms. bathroom scope is replacement of vanity. n/a for maher | $48,000 |
| Dec 14, 2018 | Completed final sign-off Aug 2019 | 760 Dolores St | correction permit in response to planning enforcement #2018012875enf to remove non-conforming interconnecting stair between basement unit #2 & 3- story unit #1 above. install basement kitchenette restoring last permitted use as shown on appln #200206280275Details
correction permit in response to planning enforcement #2018012875enf to remove non-conforming interconnecting stair between basement unit #2 & 3- story unit #1 above. install basement kitchenette restoring last permitted use as shown on appln #200206280275 | $20,000 |
| Oct 26, 2018 | Completed final sign-off Sep 2019 | 1125 Monterey Bl | lower level: finish basement,add 2 beds, 1 bath. maintain 1 car garge space, main level: remodel kitchen & bathroom add powder & master bath, general: enlarge (e) openings at rear of house, seismic upgrades, new elec, mech & plumbingDetails
lower level: finish basement,add 2 beds, 1 bath. maintain 1 car garge space, main level: remodel kitchen & bathroom add powder & master bath, general: enlarge (e) openings at rear of house, seismic upgrades, new elec, mech & plumbing | $285,000 |
| Jun 20, 2018 | Completed final sign-off Sep 2019 | 1125 Monterey Bl | kitchen remodeling. no change in wall & opening layout. add water outlet at refrigerator spaceDetails
kitchen remodeling. no change in wall & opening layout. add water outlet at refrigerator space | $20,000 |
| Mar 8, 2018 | Completed final sign-off Aug 2018 | 1331 45th Av | revision to app#201606069169. add skylight above kitchen sink.Details
revision to app#201606069169. add skylight above kitchen sink. | $250 |
| Aug 2, 2017 | Completed final sign-off Nov 2017 | 338 Holladay Av | interior renovation to extg kitchen. scope to include new cabinets, appliances, fixtures and finishes. patch flooring as required. plumbing and electrical work as required. n/a for maher.Details
interior renovation to extg kitchen. scope to include new cabinets, appliances, fixtures and finishes. patch flooring as required. plumbing and electrical work as required. n/a for maher. | $20,000 |
| Feb 2, 2017 | Completed final sign-off Dec 2018 | 630 Wawona St | lower level: remodel & upgrade of bedroom, reconfigure foyer & enclosure of (e) open stairwell. main level: reconfigure kitchen, powder room, office, bathroom & (2) bedrooms. upper level: demo (e) stair & build (n) stair, remodel master suite & bathroom, demo (e) roof to replace w/ (n) roof.Details
lower level: remodel & upgrade of bedroom, reconfigure foyer & enclosure of (e) open stairwell. main level: reconfigure kitchen, powder room, office, bathroom & (2) bedrooms. upper level: demo (e) stair & build (n) stair, remodel master suite & bathroom, demo (e) roof to replace w/ (n) roof. | $600,000 |
| Jun 24, 2016 | Completed final sign-off Dec 2016 | 3770 Cesar Chavez St | interior renovation to 2nd level includes remodel of (e) kitchen and bathroom. cabinetry at living room and new gas fireplace to replace (e) wood burining fireplace.Details
interior renovation to 2nd level includes remodel of (e) kitchen and bathroom. cabinetry at living room and new gas fireplace to replace (e) wood burining fireplace. | $100,000 |
| Jun 16, 2016 | Completed final sign-off Jan 2017 | 277 Bradford St | remove (e) wall between kitchen and liv rm. renovate (e) kitchen, remove portion of wall between interior stair and liv rm. renovate/enlarge (e) bath. add 1 closet at ea bdrm. plumb/elec sep permit. interior work only, only struct at bsmt and 1st flDetails
remove (e) wall between kitchen and liv rm. renovate (e) kitchen, remove portion of wall between interior stair and liv rm. renovate/enlarge (e) bath. add 1 closet at ea bdrm. plumb/elec sep permit. interior work only, only struct at bsmt and 1st fl | $85,000 |
| Jun 2, 2016 | Completed final sign-off Dec 2017 | 570 Precita Av | interior remodel & reconfiguration of 2nd flr including remodeled kitchen, bath, bedrooms, living & dining. new 3rd floor roof dormer, new bath & w.c. new rear windows & door. new water heater & heating unit.Details
interior remodel & reconfiguration of 2nd flr including remodeled kitchen, bath, bedrooms, living & dining. new 3rd floor roof dormer, new bath & w.c. new rear windows & door. new water heater & heating unit. | $200,500 |