Back to bathroom remodel contractors
Jln Builders
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Jul 2019
- Last 24 months
- 0 permits filed
27 permits since 2000: 26 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 26 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2019 | Completed final sign-off Jul 2019 | 1207 Indiana St | unit #7 remodel kitchen, partial remodel in 2 bathrooms. bathroom scope is replacement of vanity. n/a for maherDetails
unit #7 remodel kitchen, partial remodel in 2 bathrooms. bathroom scope is replacement of vanity. n/a for maher | $48,000 |
| Oct 26, 2018 | Completed final sign-off Sep 2019 | 1125 Monterey Bl | lower level: finish basement,add 2 beds, 1 bath. maintain 1 car garge space, main level: remodel kitchen & bathroom add powder & master bath, general: enlarge (e) openings at rear of house, seismic upgrades, new elec, mech & plumbingDetails
lower level: finish basement,add 2 beds, 1 bath. maintain 1 car garge space, main level: remodel kitchen & bathroom add powder & master bath, general: enlarge (e) openings at rear of house, seismic upgrades, new elec, mech & plumbing | $285,000 |
| Aug 15, 2018 | Completed final sign-off Jan 2019 | 1425 Shotwell St | new interior spiral stair to connect (e) ground level floor to 1st lev. add 1 bathroom & 1 bedroom on g/f. (n) concrete slab on g/f with new footings for sprial staircase and (n) load bearing wall. electrical & plumbing as required.Details
new interior spiral stair to connect (e) ground level floor to 1st lev. add 1 bathroom & 1 bedroom on g/f. (n) concrete slab on g/f with new footings for sprial staircase and (n) load bearing wall. electrical & plumbing as required. | $60,000 |
| Jan 12, 2018 | Completed final sign-off Jan 2019 | 630 Wawona St | enclosure of lightwell infill along the east facade to enlarge an existing bathroom, main level. ref bpa#201702028508Details
enclosure of lightwell infill along the east facade to enlarge an existing bathroom, main level. ref bpa#201702028508 | $2,500 |
| Jan 8, 2018 | Completed final sign-off Mar 2018 | 170 Commonwealth Av | bathroom refresh of finsihes, (e) fixtures to remain in (e) locations. no alteration of wall, window and door.Details
bathroom refresh of finsihes, (e) fixtures to remain in (e) locations. no alteration of wall, window and door. | $15,000 |
| Feb 2, 2017 | Completed final sign-off Dec 2018 | 630 Wawona St | lower level: remodel & upgrade of bedroom, reconfigure foyer & enclosure of (e) open stairwell. main level: reconfigure kitchen, powder room, office, bathroom & (2) bedrooms. upper level: demo (e) stair & build (n) stair, remodel master suite & bathroom, demo (e) roof to replace w/ (n) roof.Details
lower level: remodel & upgrade of bedroom, reconfigure foyer & enclosure of (e) open stairwell. main level: reconfigure kitchen, powder room, office, bathroom & (2) bedrooms. upper level: demo (e) stair & build (n) stair, remodel master suite & bathroom, demo (e) roof to replace w/ (n) roof. | $600,000 |
| Jan 9, 2017 | Completed final sign-off Dec 2017 | 570 Precita Av | new foundation at 1st floor including new concrete walls, new slab and new footings. remodel bath at 1st floor. ref app#201606028983 & #201701187382. for whole building. structural review. rp 01/12/17Details
new foundation at 1st floor including new concrete walls, new slab and new footings. remodel bath at 1st floor. ref app#201606028983 & #201701187382. for whole building. structural review. rp 01/12/17 | $50,000 |
| Jun 24, 2016 | Completed final sign-off Dec 2016 | 3770 Cesar Chavez St | interior renovation to 2nd level includes remodel of (e) kitchen and bathroom. cabinetry at living room and new gas fireplace to replace (e) wood burining fireplace.Details
interior renovation to 2nd level includes remodel of (e) kitchen and bathroom. cabinetry at living room and new gas fireplace to replace (e) wood burining fireplace. | $100,000 |
| Jun 16, 2016 | Completed final sign-off Jan 2017 | 277 Bradford St | remove (e) wall between kitchen and liv rm. renovate (e) kitchen, remove portion of wall between interior stair and liv rm. renovate/enlarge (e) bath. add 1 closet at ea bdrm. plumb/elec sep permit. interior work only, only struct at bsmt and 1st flDetails
remove (e) wall between kitchen and liv rm. renovate (e) kitchen, remove portion of wall between interior stair and liv rm. renovate/enlarge (e) bath. add 1 closet at ea bdrm. plumb/elec sep permit. interior work only, only struct at bsmt and 1st fl | $85,000 |
| Jun 2, 2016 | Completed final sign-off Dec 2017 | 570 Precita Av | interior remodel & reconfiguration of 2nd flr including remodeled kitchen, bath, bedrooms, living & dining. new 3rd floor roof dormer, new bath & w.c. new rear windows & door. new water heater & heating unit.Details
interior remodel & reconfiguration of 2nd flr including remodeled kitchen, bath, bedrooms, living & dining. new 3rd floor roof dormer, new bath & w.c. new rear windows & door. new water heater & heating unit. | $200,500 |