Permit GraphShortlistSan Francisco building permits since 2000

Jjay Builders

Contractor license
1014831
State license record
Based in
Daly City
On San Francisco permits
Aug 2018 to Jun 2026
Last 24 months
6 permits filed

15 permits since 2000: 10 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllStairs 2Kitchen remodel 5Bathroom remodel 6

2 stairs permits: 1 never finaled, 1 expired or cancelled. Typically 13 days from filing to permit.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 14, 2024Expired or cancelled
expired Sep 2026
1998 Bush St1998 bush aka 1900 buchanan st: comply w/ nov #202423193: legalize as-built non-structural furr wall, as-built staircase, & electrical sub-panel.
Details
Permit
202408148603
Status
expired
Filed
Aug 14, 2024
Permit issued
Sep 9, 2024
Declared cost
$50,000
Address
1998 Bush St

1998 bush aka 1900 buchanan st: comply w/ nov #202423193: legalize as-built non-structural furr wall, as-built staircase, & electrical sub-panel.

Open the permit page

$50,000
Jul 26, 2023Never finaled
issued Jul 2023, no final
2315 20th Avdiconnect (e) tankless water heater (remove). repair rear stairway (less than 50%). to comply with nov 202309805 #2, #6 and its entirety
Details
Permit
202307263011
Status
issued
Filed
Jul 26, 2023
Permit issued
Jul 26, 2023
Declared cost
$1,800
Address
2315 20th Av

diconnect (e) tankless water heater (remove). repair rear stairway (less than 50%). to comply with nov 202309805 #2, #6 and its entirety

Open the permit page

$1,800