Back to bathroom remodel contractors
Jjay Builders
- Based in
- Daly City
- On San Francisco permits
- Aug 2018 to Jun 2026
- Last 24 months
- 6 permits filed
15 permits since 2000: 10 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 2 expired or cancelled. Typically 18 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2025 | Expired or cancelled expired Apr 2026 | 85 Sharon St | remodel kitchen like for like, new cabinets & countertops. remodel bathroom like for like, convert (e) bathtub to shower pan. replace 2 (e) windows like for like in sunroom, not visible from street.Details
remodel kitchen like for like, new cabinets & countertops. remodel bathroom like for like, convert (e) bathtub to shower pan. replace 2 (e) windows like for like in sunroom, not visible from street. | $20,000 |
| Aug 23, 2023 | Expired or cancelled cancelled Mar 2025 | 2055 18th Av | bathroom remodel. convert bath tub to shower. shower pan, faucet, fixture, light. approx 40 sq. ft., no framing demo.Details
bathroom remodel. convert bath tub to shower. shower pan, faucet, fixture, light. approx 40 sq. ft., no framing demo. | $20,000 |
| Apr 13, 2022 | Completed final sign-off Nov 2022 | 245 Dorado Tr | remodel one kitchen and two bathrooms some electric and plumbing. non structural work. work to be done at 247 dorado terrace (2 units building)Details
remodel one kitchen and two bathrooms some electric and plumbing. non structural work. work to be done at 247 dorado terrace (2 units building) | $8,000 |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 460 Filbert St | unit 2 - retile 1 bath floor and wall. replace shower door, shower headDetails
unit 2 - retile 1 bath floor and wall. replace shower door, shower head | $7,600 |
| Aug 30, 2019 | Completed final sign-off May 2020 | 2379 44th Av | add a family, a bedroom and a full bathroom on the 1st fl. replace water heater to tankless typeDetails
add a family, a bedroom and a full bathroom on the 1st fl. replace water heater to tankless type | $45,000 |
| Aug 6, 2018 | Completed final sign-off Jan 2019 | 286 Sadowa St | interior remodel. add 1 bedroom, 1 full bath, 1 media room at ground fl per planDetails
interior remodel. add 1 bedroom, 1 full bath, 1 media room at ground fl per plan | $40,888 |