Back to kitchen remodel contractors
Jjay Builders
- Based in
- Daly City
- On San Francisco permits
- Aug 2018 to Jun 2026
- Last 24 months
- 6 permits filed
15 permits since 2000: 10 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 10, 2025 | Completed final sign-off Jan 2026 | 1859 31st Av | kitchen remodel: new cabinet, countertop and power outlet.Details
kitchen remodel: new cabinet, countertop and power outlet. | $30,000 |
| Feb 5, 2025 | Expired or cancelled expired Apr 2026 | 85 Sharon St | remodel kitchen like for like, new cabinets & countertops. remodel bathroom like for like, convert (e) bathtub to shower pan. replace 2 (e) windows like for like in sunroom, not visible from street.Details
remodel kitchen like for like, new cabinets & countertops. remodel bathroom like for like, convert (e) bathtub to shower pan. replace 2 (e) windows like for like in sunroom, not visible from street. | $20,000 |
| Apr 19, 2024 | In progress issued Apr 2024 | 2325 Ortega St | one kitchen remodel, cabinet countertop, sink. upgrade service panel. non structuralDetails
one kitchen remodel, cabinet countertop, sink. upgrade service panel. non structural | $33,000 |
| Jun 27, 2023 | Completed final sign-off Dec 2023 | 4133 19th Av | one kitchen remodel. cabinet, countertop. upgrade 200 amp panel. replace waterline (underground). meter to main valve.Details
one kitchen remodel. cabinet, countertop. upgrade 200 amp panel. replace waterline (underground). meter to main valve. | $26,000 |
| Apr 13, 2022 | Completed final sign-off Nov 2022 | 245 Dorado Tr | remodel one kitchen and two bathrooms some electric and plumbing. non structural work. work to be done at 247 dorado terrace (2 units building)Details
remodel one kitchen and two bathrooms some electric and plumbing. non structural work. work to be done at 247 dorado terrace (2 units building) | $8,000 |