Jared Johnson Construction
- Based in
- Truckee
- On San Francisco permits
- Nov 2011 to May 2017
- Last 24 months
- 0 permits filed
32 permits since 2000: 30 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 expired or cancelled. Typically 41 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2015 | Completed final sign-off May 2016 | 537 28th St | new french patio door & 3 windows on rear facade, new interior finished family room with lighting, hardwood floors, new exterior steps to (e) deck, new guardrail on 1st level over stairs, repair (e) footing/foundation and provide drainage. new exterior plantersDetails
new french patio door & 3 windows on rear facade, new interior finished family room with lighting, hardwood floors, new exterior steps to (e) deck, new guardrail on 1st level over stairs, repair (e) footing/foundation and provide drainage. new exterior planters | $70,000 |
| May 11, 2015 | Expired or cancelled cancelled Mar 2017 | 537 28th St | infill bldg under(e)sunroom to crate an add'l grd level bedroom. repair rear deck. rebuild stairs betwn grd flr & 1/fl. install trench drain in frt of bldg. move (e) gas meter away from electrical service panel.Details
infill bldg under(e)sunroom to crate an add'l grd level bedroom. repair rear deck. rebuild stairs betwn grd flr & 1/fl. install trench drain in frt of bldg. move (e) gas meter away from electrical service panel. | $90,000 |
| Apr 1, 2015 | Completed final sign-off Jan 2016 | 187 Brompton Av | replace/rebuild existing deck and stairways with deck of reduced size at rear of houseDetails
replace/rebuild existing deck and stairways with deck of reduced size at rear of house | $15,000 |
| Sep 5, 2014 | Completed final sign-off Mar 2015 | 654 Chenery St | revision to 201407080717; attic framing to be removed 140 sf. habitable bedroom added. stair from 2nd to 3rd level added, emergency exit window created through enlargement of existing attic window. 24 sf glazing added to 2nd level.Details
revision to 201407080717; attic framing to be removed 140 sf. habitable bedroom added. stair from 2nd to 3rd level added, emergency exit window created through enlargement of existing attic window. 24 sf glazing added to 2nd level. | $40,000 |
| Mar 20, 2014 | Completed final sign-off Jan 2016 | 328 Harriet St | (rear building) replace current stairs entry deck to house with smaller like products. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13Details
(rear building) replace current stairs entry deck to house with smaller like products. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13 | $25,000 |
| Feb 12, 2014 | Completed final sign-off Jan 2016 | 1045 Scott St | replacement in kind of stairs/entry deck to 2nd floor house. compliance with ordinance no.155-13 not required. excavation <50 cu.yd.Details
replacement in kind of stairs/entry deck to 2nd floor house. compliance with ordinance no.155-13 not required. excavation <50 cu.yd. | $19,000 |
| Nov 4, 2013 | Completed final sign-off Mar 2014 | 818 York St | replacement in kind of extg 3 story wood frame egress stairway. third story landing @ 20 ft. to meet egressDetails
replacement in kind of extg 3 story wood frame egress stairway. third story landing @ 20 ft. to meet egress | $8,000 |
| Mar 22, 2013 | Completed final sign-off Feb 2014 | 345 Grafton Av | demo existing front door stairs & concrete pathway. new 14-6x15-6 redwood deck to be constructed. two secured doors to be located on the norther side of deck. new stem wall w/stone facade to be constructed on west side of deckDetails
demo existing front door stairs & concrete pathway. new 14-6x15-6 redwood deck to be constructed. two secured doors to be located on the norther side of deck. new stem wall w/stone facade to be constructed on west side of deck | $13,000 |