Jared Johnson Construction
- Based in
- Truckee
- On San Francisco permits
- Nov 2011 to May 2017
- Last 24 months
- 0 permits filed
32 permits since 2000: 30 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
12 deck permits: 11 completed, 1 expired or cancelled. Typically 39 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2017 | Completed final sign-off Sep 2017 | 1675 Alabama St | add deck off rear of bldg, new french doors to deck, new window in rearwall, renovate extg kitchen, renovate main floor bath, renovate upper floor bathroom, remove extg washer and dryer on main floor & relocate to upper floor.Details
add deck off rear of bldg, new french doors to deck, new window in rearwall, renovate extg kitchen, renovate main floor bath, renovate upper floor bathroom, remove extg washer and dryer on main floor & relocate to upper floor. | $125,000 |
| Nov 12, 2015 | Completed final sign-off May 2016 | 537 28th St | new french patio door & 3 windows on rear facade, new interior finished family room with lighting, hardwood floors, new exterior steps to (e) deck, new guardrail on 1st level over stairs, repair (e) footing/foundation and provide drainage. new exterior plantersDetails
new french patio door & 3 windows on rear facade, new interior finished family room with lighting, hardwood floors, new exterior steps to (e) deck, new guardrail on 1st level over stairs, repair (e) footing/foundation and provide drainage. new exterior planters | $70,000 |
| Sep 17, 2015 | Completed final sign-off Mar 2016 | 90 Laidley St | remodel (e) kitchen, remodel (e) master bath, new exterior sliding door, new hardwood floors throughout, replacing exterior patios decking in kind. replace fence and exterior handrail in kind. plumbing, fixture upgrade to guest bath and half bathDetails
remodel (e) kitchen, remodel (e) master bath, new exterior sliding door, new hardwood floors throughout, replacing exterior patios decking in kind. replace fence and exterior handrail in kind. plumbing, fixture upgrade to guest bath and half bath | $115,000 |
| Jun 26, 2015 | Completed final sign-off Jul 2016 | 396 Laidley St | remove (e) decks, remove patio paving, build new decks, guard rails & windscreens, repave patio w conc. slab. install patio area drains, relocate (e) spa & associated utilities, install exterior lighting.Details
remove (e) decks, remove patio paving, build new decks, guard rails & windscreens, repave patio w conc. slab. install patio area drains, relocate (e) spa & associated utilities, install exterior lighting. | $19,000 |
| May 11, 2015 | Expired or cancelled cancelled Mar 2017 | 537 28th St | infill bldg under(e)sunroom to crate an add'l grd level bedroom. repair rear deck. rebuild stairs betwn grd flr & 1/fl. install trench drain in frt of bldg. move (e) gas meter away from electrical service panel.Details
infill bldg under(e)sunroom to crate an add'l grd level bedroom. repair rear deck. rebuild stairs betwn grd flr & 1/fl. install trench drain in frt of bldg. move (e) gas meter away from electrical service panel. | $90,000 |
| Apr 1, 2015 | Completed final sign-off Jan 2016 | 187 Brompton Av | replace/rebuild existing deck and stairways with deck of reduced size at rear of houseDetails
replace/rebuild existing deck and stairways with deck of reduced size at rear of house | $15,000 |
| Mar 20, 2015 | Completed final sign-off Feb 2016 | 4715 25th St | add a new deck at rear on second floor. add a new full bath, a bedroom and closet on first floor. remodel kitchen on 2nd floor. new siding on exterior backyard facing wall. new french doors and windows on 1st level.Details
add a new deck at rear on second floor. add a new full bath, a bedroom and closet on first floor. remodel kitchen on 2nd floor. new siding on exterior backyard facing wall. new french doors and windows on 1st level. | $150,000 |
| Mar 20, 2014 | Completed final sign-off Jan 2016 | 328 Harriet St | (rear building) replace current stairs entry deck to house with smaller like products. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13Details
(rear building) replace current stairs entry deck to house with smaller like products. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13 | $25,000 |
| Feb 12, 2014 | Completed final sign-off Jan 2016 | 1045 Scott St | replacement in kind of stairs/entry deck to 2nd floor house. compliance with ordinance no.155-13 not required. excavation <50 cu.yd.Details
replacement in kind of stairs/entry deck to 2nd floor house. compliance with ordinance no.155-13 not required. excavation <50 cu.yd. | $19,000 |
| Dec 5, 2013 | Completed final sign-off Oct 2014 | 19 Mendosa Av | remove extg deck, construct new deck with similar dimensions. no grading, excuvation, retaining walls included in this permit. deck surface less than 10' in height above grade.Details
remove extg deck, construct new deck with similar dimensions. no grading, excuvation, retaining walls included in this permit. deck surface less than 10' in height above grade. | $5,000 |
| Mar 22, 2013 | Completed final sign-off Feb 2014 | 345 Grafton Av | demo existing front door stairs & concrete pathway. new 14-6x15-6 redwood deck to be constructed. two secured doors to be located on the norther side of deck. new stem wall w/stone facade to be constructed on west side of deckDetails
demo existing front door stairs & concrete pathway. new 14-6x15-6 redwood deck to be constructed. two secured doors to be located on the norther side of deck. new stem wall w/stone facade to be constructed on west side of deck | $13,000 |
| Dec 5, 2012 | Completed final sign-off Apr 2013 | 1736 Hayes St | new 24'x9' deck at rear of (e) bldg (2nd fl). installation of 2 sliding glass door leading onto new deckDetails
new 24'x9' deck at rear of (e) bldg (2nd fl). installation of 2 sliding glass door leading onto new deck | $30,000 |