Jared Johnson Construction
- Based in
- Truckee
- On San Francisco permits
- Nov 2011 to May 2017
- Last 24 months
- 0 permits filed
32 permits since 2000: 30 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 6 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2017 | Completed final sign-off Sep 2017 | 1675 Alabama St | add deck off rear of bldg, new french doors to deck, new window in rearwall, renovate extg kitchen, renovate main floor bath, renovate upper floor bathroom, remove extg washer and dryer on main floor & relocate to upper floor.Details
add deck off rear of bldg, new french doors to deck, new window in rearwall, renovate extg kitchen, renovate main floor bath, renovate upper floor bathroom, remove extg washer and dryer on main floor & relocate to upper floor. | $125,000 |
| Feb 22, 2017 | Completed final sign-off Oct 2017 | 159 Elsie St | demo (e) bathroom and closet in master ste. new full bath, wood flooring, (n) led lighting, new posts to support (e) beam. no additional sq ft of conditioned space being added.Details
demo (e) bathroom and closet in master ste. new full bath, wood flooring, (n) led lighting, new posts to support (e) beam. no additional sq ft of conditioned space being added. | $60,000 |
| Jan 11, 2017 | Completed final sign-off Mar 2017 | 4312 Kirkham St | add half bath off kitchenDetails
add half bath off kitchen | $5,000 |
| Jul 25, 2016 | Completed final sign-off Sep 2016 | 4307 Kirkham St | add new bathroom - remodel master bedroom & bath. remodel hallway to office and (1) bedroomDetails
add new bathroom - remodel master bedroom & bath. remodel hallway to office and (1) bedroom | $24,000 |
| Jan 28, 2016 | Completed final sign-off Oct 2016 | 299 Douglass St | adding new conditioned space to (e) garage. new rec room, full bathroom, office, new furnace to heat proposed conditioned space. no work to exterior of structure. new wood floors, lighting, new 200 amp panel to replace (e) panelDetails
adding new conditioned space to (e) garage. new rec room, full bathroom, office, new furnace to heat proposed conditioned space. no work to exterior of structure. new wood floors, lighting, new 200 amp panel to replace (e) panel | $60,000 |
| Sep 17, 2015 | Completed final sign-off Mar 2016 | 90 Laidley St | remodel (e) kitchen, remodel (e) master bath, new exterior sliding door, new hardwood floors throughout, replacing exterior patios decking in kind. replace fence and exterior handrail in kind. plumbing, fixture upgrade to guest bath and half bathDetails
remodel (e) kitchen, remodel (e) master bath, new exterior sliding door, new hardwood floors throughout, replacing exterior patios decking in kind. replace fence and exterior handrail in kind. plumbing, fixture upgrade to guest bath and half bath | $115,000 |
| Mar 20, 2015 | Completed final sign-off Feb 2016 | 4715 25th St | add a new deck at rear on second floor. add a new full bath, a bedroom and closet on first floor. remodel kitchen on 2nd floor. new siding on exterior backyard facing wall. new french doors and windows on 1st level.Details
add a new deck at rear on second floor. add a new full bath, a bedroom and closet on first floor. remodel kitchen on 2nd floor. new siding on exterior backyard facing wall. new french doors and windows on 1st level. | $150,000 |
| Jan 27, 2015 | Completed final sign-off Jan 2016 | 187 Brompton Av | horizontal extension on first floor below overhang, & horizontal extension on second floor at light well; remodel 2nd fl kitchen and 2 baths. remodel gr level bath, tv room, and add bedroom. compliance with maher ordinance no 155-13 not required.Details
horizontal extension on first floor below overhang, & horizontal extension on second floor at light well; remodel 2nd fl kitchen and 2 baths. remodel gr level bath, tv room, and add bedroom. compliance with maher ordinance no 155-13 not required. | $130,000 |
| Jul 23, 2014 | Completed final sign-off Dec 2014 | 2583 47th Av | new bathroom within existing building envelope at 1st fl level. new window at rear, west facade. new conditioned space 67 square feetDetails
new bathroom within existing building envelope at 1st fl level. new window at rear, west facade. new conditioned space 67 square feet | $16,000 |
| Jul 8, 2014 | Completed final sign-off Mar 2015 | 654 Chenery St | kitchen, living, dining, master bedroom & bathroom remodelDetails
kitchen, living, dining, master bedroom & bathroom remodel | $75,000 |