Back to kitchen remodel contractors
James Labao
- Based in
- Daly City
- On San Francisco permits
- May 2000 to Sep 2022
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2022 | Completed final sign-off Oct 2022 | 151 Swiss Av | kitchen remodel with 8 cabinets, counter top, and appliances. bathroom remodel, new tube, tile, vanity and toiletDetails
kitchen remodel with 8 cabinets, counter top, and appliances. bathroom remodel, new tube, tile, vanity and toilet | $18,000 |
| Apr 9, 2021 | Completed final sign-off Jun 2021 | 313 Winfield St | small kitchen remodel. 7 new cabinets and new appliance. confirguration in kind. no moving plumbing fixtures. no wall removal. all new lighting to comply with cec 150.0(k)3.Details
small kitchen remodel. 7 new cabinets and new appliance. confirguration in kind. no moving plumbing fixtures. no wall removal. all new lighting to comply with cec 150.0(k)3. | $12,000 |
| May 29, 2012 | Completed final sign-off Oct 2012 | 115 Marietta Dr | upgrade kitchen cabinets, upgrade sink, faucet & garbage disposal, add one new 20amp circuit for microwave, no new lighting.Details
upgrade kitchen cabinets, upgrade sink, faucet & garbage disposal, add one new 20amp circuit for microwave, no new lighting. | $11,500 |
| Dec 1, 2008 | Completed final sign-off Mar 2009 | 71 De Soto St | complete kitchen remodel. new cabinets, new appliances, new electrical plugs lights, new kitchen sink + garbage disposal.Details
complete kitchen remodel. new cabinets, new appliances, new electrical plugs lights, new kitchen sink + garbage disposal. | $24,250 |