James Labao
- Based in
- Daly City
- On San Francisco permits
- May 2000 to Sep 2022
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2022 | Completed final sign-off Oct 2022 | 151 Swiss Av | voluntary add (9) sill bolts in south east corner.Details
voluntary add (9) sill bolts in south east corner. | $850 |
| Jun 24, 2022 | Completed final sign-off Oct 2022 | 151 Swiss Av | kitchen remodel with 8 cabinets, counter top, and appliances. bathroom remodel, new tube, tile, vanity and toiletDetails
kitchen remodel with 8 cabinets, counter top, and appliances. bathroom remodel, new tube, tile, vanity and toilet | $18,000 |
| Apr 9, 2021 | Completed final sign-off Jun 2021 | 313 Winfield St | small kitchen remodel. 7 new cabinets and new appliance. confirguration in kind. no moving plumbing fixtures. no wall removal. all new lighting to comply with cec 150.0(k)3.Details
small kitchen remodel. 7 new cabinets and new appliance. confirguration in kind. no moving plumbing fixtures. no wall removal. all new lighting to comply with cec 150.0(k)3. | $12,000 |
| May 15, 2018 | Completed final sign-off Aug 2018 | 115 Marietta Dr | bathroom remodel, new tub, toilet. no change of (e) layoutDetails
bathroom remodel, new tub, toilet. no change of (e) layout | $12,000 |
| Oct 17, 2016 | Completed final sign-off Dec 2016 | 275 Olympia Wy | bathroom remodel. maher naDetails
bathroom remodel. maher na | $9,500 |
| Jan 28, 2016 | Completed final sign-off Aug 2018 | 399 San Fernando Wy | replace 3 windows and install new bike lockers, conform plans to new planning conditional use permit.Details
replace 3 windows and install new bike lockers, conform plans to new planning conditional use permit. | $8,000 |
| Feb 23, 2015 | Completed final sign-off Mar 2015 | 1231 Noe St | to comply with physical inspection report #cc-7561.Details
to comply with physical inspection report #cc-7561. | $20,000 |
| Feb 23, 2015 | Completed final sign-off Mar 2015 | 1231 Noe St | to obtain final inspection for work approved under pa#2005-0209-5108. all work is complete.Details
to obtain final inspection for work approved under pa#2005-0209-5108. all work is complete. | |
| Aug 7, 2014 | Completed final sign-off Aug 2014 | 1341 Lake St | to comply with physical inspection report #cc-7662Details
to comply with physical inspection report #cc-7662 | $6,500 |
| May 29, 2012 | Completed final sign-off Oct 2012 | 115 Marietta Dr | upgrade kitchen cabinets, upgrade sink, faucet & garbage disposal, add one new 20amp circuit for microwave, no new lighting.Details
upgrade kitchen cabinets, upgrade sink, faucet & garbage disposal, add one new 20amp circuit for microwave, no new lighting. | $11,500 |
| Jul 7, 2011 | Never finaled issued Jul 2011, no final | 60 Pinehurst Wy | replace concrete driveway in kind, repairing size 8x16Details
replace concrete driveway in kind, repairing size 8x16 | $4,500 |
| Feb 22, 2010 | Completed final sign-off Jun 2010 | 87 Pinehurst Wy | install drain tile on the north side of the building, 40ft long. new catch basinDetails
install drain tile on the north side of the building, 40ft long. new catch basin | $7,500 |
| Dec 1, 2008 | Completed final sign-off Mar 2009 | 71 De Soto St | complete kitchen remodel. new cabinets, new appliances, new electrical plugs lights, new kitchen sink + garbage disposal.Details
complete kitchen remodel. new cabinets, new appliances, new electrical plugs lights, new kitchen sink + garbage disposal. | $24,250 |
| Oct 31, 2008 | Completed final sign-off Dec 2008 | 1559 40th Av | bathroom remodel at upstairs bathroom. new shower valve, toilet,vanity,tile and finishesDetails
bathroom remodel at upstairs bathroom. new shower valve, toilet,vanity,tile and finishes | $19,800 |
| Sep 4, 2008 | Completed final sign-off Oct 2008 | 71 De Soto St | addition to permit# 1162640. additional dry-rot work on south side of building. in 3 defferent spots on south side. mostly sill work & pony wall below floor. also in south west corner in front. sill work-rim joist corner studs & new plywood & stucco.Details
addition to permit# 1162640. additional dry-rot work on south side of building. in 3 defferent spots on south side. mostly sill work & pony wall below floor. also in south west corner in front. sill work-rim joist corner studs & new plywood & stucco. | $7,500 |
| Aug 8, 2008 | Completed final sign-off Oct 2008 | 71 De Soto St | dryrot repair at south-west corner of building from sillto above windows. new framing, sheating, stucco, not visible from street.Details
dryrot repair at south-west corner of building from sillto above windows. new framing, sheating, stucco, not visible from street. | $5,200 |
| Nov 15, 2007 | Completed final sign-off Dec 2007 | 898 Carolina St | remodel bathroom. new tub, new toilet , new vanity, lighting to remainnew insulation . repair some dryrot floor in kind.Details
remodel bathroom. new tub, new toilet , new vanity, lighting to remainnew insulation . repair some dryrot floor in kind. | $8,000 |
| May 14, 2007 | Completed final sign-off Jun 2007 | 351 Winding Wy | bathroom remodel. new tub new tile on floor + shower. new toilet + shower valve. new fan.Details
bathroom remodel. new tub new tile on floor + shower. new toilet + shower valve. new fan. | $8,000 |
| Jan 24, 2005 | Completed final sign-off Mar 2005 | 26 Miramar Av | insulate and sheetrock two rear bedrms on 2nd flr r-13 wall, r-30 ceilingDetails
insulate and sheetrock two rear bedrms on 2nd flr r-13 wall, r-30 ceiling | $3,000 |
| Aug 11, 2004 | Completed final sign-off Sep 2004 | 109 Pinehurst Wy | dryrot repair on front stucco to match existing,repair only.under living room/dining room windowsDetails
dryrot repair on front stucco to match existing,repair only.under living room/dining room windows | $2,000 |
| Mar 23, 2004 | Completed final sign-off Apr 2004 | 235 San Leandro Wy | repair water damaged plaster wall, ceiling in living roomDetails
repair water damaged plaster wall, ceiling in living room | $3,000 |
| Jan 24, 2003 | Completed final sign-off Feb 2003 | 87 Pinehurst Wy | replace 31' of dry rotted sill plate @ north side of house.Details
replace 31' of dry rotted sill plate @ north side of house. | $4,000 |
| Dec 28, 2000 | Expired or cancelled expired Apr 2001 | 701 Urbano Dr | renew for final inspection appl#9907983Details
renew for final inspection appl#9907983 | |
| May 19, 2000 | Completed final sign-off Jun 2000 | 95 Pinehurst Wy | dry rot repair and stucco repairDetails
dry rot repair and stucco repair | $2,000 |