Back to bathroom remodel contractors
James Labao
- Based in
- Daly City
- On San Francisco permits
- May 2000 to Sep 2022
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 54 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2022 | Completed final sign-off Oct 2022 | 151 Swiss Av | kitchen remodel with 8 cabinets, counter top, and appliances. bathroom remodel, new tube, tile, vanity and toiletDetails
kitchen remodel with 8 cabinets, counter top, and appliances. bathroom remodel, new tube, tile, vanity and toilet | $18,000 |
| May 15, 2018 | Completed final sign-off Aug 2018 | 115 Marietta Dr | bathroom remodel, new tub, toilet. no change of (e) layoutDetails
bathroom remodel, new tub, toilet. no change of (e) layout | $12,000 |
| Oct 17, 2016 | Completed final sign-off Dec 2016 | 275 Olympia Wy | bathroom remodel. maher naDetails
bathroom remodel. maher na | $9,500 |
| Oct 31, 2008 | Completed final sign-off Dec 2008 | 1559 40th Av | bathroom remodel at upstairs bathroom. new shower valve, toilet,vanity,tile and finishesDetails
bathroom remodel at upstairs bathroom. new shower valve, toilet,vanity,tile and finishes | $19,800 |
| Nov 15, 2007 | Completed final sign-off Dec 2007 | 898 Carolina St | remodel bathroom. new tub, new toilet , new vanity, lighting to remainnew insulation . repair some dryrot floor in kind.Details
remodel bathroom. new tub, new toilet , new vanity, lighting to remainnew insulation . repair some dryrot floor in kind. | $8,000 |
| May 14, 2007 | Completed final sign-off Jun 2007 | 351 Winding Wy | bathroom remodel. new tub new tile on floor + shower. new toilet + shower valve. new fan.Details
bathroom remodel. new tub new tile on floor + shower. new toilet + shower valve. new fan. | $8,000 |