Back to kitchen remodel contractors
James A Keenan
- Based in
- San Francisco
- On San Francisco permits
- Jan 2004 to Nov 2018
- Last 24 months
- 0 permits filed
37 permits since 2000: 22 completed, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 30 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 28, 2018 | Completed final sign-off Aug 2020 | 775 14th St | kitchen and bathroom remodel on 1st, 2nd, & 3rd floor. new hvac at 3rd floor. n/a for maherDetails
kitchen and bathroom remodel on 1st, 2nd, & 3rd floor. new hvac at 3rd floor. n/a for maher | $132,693 |
| Jun 27, 2014 | Completed final sign-off Nov 2014 | 2240 Chestnut St | change tenant from tuttimelon to seed+salt, demo existing counter, cabinets, drop ceiling, lighting, finishes, front facade door & windows & kitchen walls, (e)ada compliant restrms to remain. install new kitchen wall w/openings,new cabinets lighting, finishes, facade & eqpt;maher n/aDetails
change tenant from tuttimelon to seed+salt, demo existing counter, cabinets, drop ceiling, lighting, finishes, front facade door & windows & kitchen walls, (e)ada compliant restrms to remain. install new kitchen wall w/openings,new cabinets lighting, finishes, facade & eqpt;maher n/a | $137,000 |
| Jan 10, 2014 | Completed final sign-off Jan 2015 | 1958 Polk St | first time tenant improvement, install new kitchen & one ada restroom, new counters, new finishes & lighting, add 210 sf mezzanine partially oever adjacent tenant space & add spiral stair for access. replace fixed window with operable winodw.Details
first time tenant improvement, install new kitchen & one ada restroom, new counters, new finishes & lighting, add 210 sf mezzanine partially oever adjacent tenant space & add spiral stair for access. replace fixed window with operable winodw. | $131,000 |
| Jul 1, 2011 | Completed final sign-off Mar 2012 | 1 Embarcadero Center | 1st floor-interior tenant improvements for restaurant use including partitions finishes and kitchen equipment.street levelDetails
1st floor-interior tenant improvements for restaurant use including partitions finishes and kitchen equipment.street level | $200,000 |