Back to kitchen remodel contractors
Jakobson Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2016 to Sep 2026
- Last 24 months
- 4 permits filed
10 permits since 2000: 7 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 in progress. Typically 32 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 30 Nido Av | kitchen remodel, replace wiring, install new recessed ceiling lights, replace drywall behind cabinets. install new cabinets and appliances. floor plan stays the same, install new electrical subpanel in the hallway next to the kitchen.Details
kitchen remodel, replace wiring, install new recessed ceiling lights, replace drywall behind cabinets. install new cabinets and appliances. floor plan stays the same, install new electrical subpanel in the hallway next to the kitchen. | $43,650 |
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 1501 08th Av | unit a 1st floor: remodel existing kitchen and bath. removal on non-load bearing wall, casework, finishes, electrical, mechanical and plumbing. no exterior. unit a basement: refresh garage.Details
unit a 1st floor: remodel existing kitchen and bath. removal on non-load bearing wall, casework, finishes, electrical, mechanical and plumbing. no exterior. unit a basement: refresh garage. | $50,000 |