Back to bathroom remodel contractors
Jakobson Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2016 to Sep 2026
- Last 24 months
- 4 permits filed
10 permits since 2000: 7 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2025 | Completed final sign-off Aug 2025 | 720 York St | unit# 224: bathroom remodel- remove and replace bathtub and shower fixtures, new fan and light fixtures, replace old vanity and sink, new above bathtub and new tile on wall and floor, replace old toilet, upgrade electrical to code. install glass shower door. in kindDetails
unit# 224: bathroom remodel- remove and replace bathtub and shower fixtures, new fan and light fixtures, replace old vanity and sink, new above bathtub and new tile on wall and floor, replace old toilet, upgrade electrical to code. install glass shower door. in kind | $35,000 |
| May 1, 2024 | Completed final sign-off Jul 2024 | 2525 Lyon St | bathroom remodel, keep same blueprint, new shower, faucets (2), replace toilet, vanity, rebuild shower enclosure. install ceiling fan, new electrical circuits, insulation and new drywall in walk-in closet. like for like remodel.Details
bathroom remodel, keep same blueprint, new shower, faucets (2), replace toilet, vanity, rebuild shower enclosure. install ceiling fan, new electrical circuits, insulation and new drywall in walk-in closet. like for like remodel. | $25,000 |
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 1501 08th Av | unit a 1st floor: remodel existing kitchen and bath. removal on non-load bearing wall, casework, finishes, electrical, mechanical and plumbing. no exterior. unit a basement: refresh garage.Details
unit a 1st floor: remodel existing kitchen and bath. removal on non-load bearing wall, casework, finishes, electrical, mechanical and plumbing. no exterior. unit a basement: refresh garage. | $50,000 |
| Dec 9, 2019 | Completed final sign-off Feb 2020 | 1534 Baker St | master bathroom remodel. remove bathtube, replace with shower pan, newtile, install new shower valve and head. replace toilet and vanity, new sink, and faucets. paint walls and ceiling. remodel in-kindDetails
master bathroom remodel. remove bathtube, replace with shower pan, newtile, install new shower valve and head. replace toilet and vanity, new sink, and faucets. paint walls and ceiling. remodel in-kind | $10,000 |
| Aug 17, 2016 | Completed final sign-off Jan 2021 | 16 Hillway Av | third story rear addition to include first floor office & bathroom, second floor family room addition, powder room and deck, third floor bathroom, laundry closet and bathroom.Details
third story rear addition to include first floor office & bathroom, second floor family room addition, powder room and deck, third floor bathroom, laundry closet and bathroom. | $50,000 |