Block 1854, lot 001
1501 08th Ave
- City’s use
- Multi-Family Residential
- Built
- 1914
- Stories
- 4
- Units
- 6
- Rooms
- 12 bedrooms, 6 bathrooms
- Building
- 5,907 sq ft
- Lot
- 3,097 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 1501 08th Av | Jakobson Construction Inc. | unit a 1st floor: remodel existing kitchen and bath. removal on non-load bearing wall, casework, finishes, electrical, mechanical and plumbing. no exterior. unit a basement: refresh garage.Details
unit a 1st floor: remodel existing kitchen and bath. removal on non-load bearing wall, casework, finishes, electrical, mechanical and plumbing. no exterior. unit a basement: refresh garage. | $50,000 |
| Jun 4, 2021 | Completed final sign-off Dec 2021 | 1501 08th Av | Jemico Llc Dba Renewal By Andersen Of Sf | unit #f: replace 12 windows. visible from the street. no size change. material is wood. (last unit on building to have windows changed)Details
unit #f: replace 12 windows. visible from the street. no size change. material is wood. (last unit on building to have windows changed) | $24,400 |
| Feb 25, 2019 | Completed final sign-off Jun 2019 | 1501 08th Av | Reed Electric Company Inc Dba Century El | replace (e) fire alarm system with a new wireless fire alarm system on a like for like basis per csfm code interpretation 12-001 and information bulletin dated 9-4-08. install wireless low frequency sounders in all sleeping areas to comply with sffc 1103.7.6.1Details
replace (e) fire alarm system with a new wireless fire alarm system on a like for like basis per csfm code interpretation 12-001 and information bulletin dated 9-4-08. install wireless low frequency sounders in all sleeping areas to comply with sffc 1103.7.6.1 | $5,000 |
| Jun 13, 2018 | Completed final sign-off Aug 2018 | 1501 08th Av | replace siding partially visible from the street less than 25 percent cedar shingle in-kind.Details
replace siding partially visible from the street less than 25 percent cedar shingle in-kind. | $15,000 | |
| Sep 5, 2017 | Completed final sign-off Aug 2018 | 1501 08th Av | Charles Window & Door/Golden Gate Home I | unit a, b, c, d. replace 54 winndows size for size wood to wood sash visible froms street u factor .29 grids to match existing and full divided light and double hung windows.Details
unit a, b, c, d. replace 54 winndows size for size wood to wood sash visible froms street u factor .29 grids to match existing and full divided light and double hung windows. | $80,000 |
| Jul 17, 2017 | Never finaled issued Jul 2017, no final | 1501 08th Av | street spaceDetails
street space | ||
| Jul 9, 2015 | Completed final sign-off Apr 2016 | 1501 08th Av | Sincere Construction Company Inc | seismic retrofit soft story comply with sfbc 34b mandatory seismic retrofit iebc a4Details
seismic retrofit soft story comply with sfbc 34b mandatory seismic retrofit iebc a4 | $60,000 |
| Jan 23, 2014 | Never finaled issued Jan 2014, no final | 1501 08th Av | street spaceDetails
street space | ||
| May 20, 2010 | Completed final sign-off Jun 2010 | 1501 08th Av | Gil Construction & Assoc Inc. | remove and replace shingles on left side 25x25Details
remove and replace shingles on left side 25x25 | $5,600 |
| Jan 23, 2009 | Completed final sign-off Jun 2009 | 1501 08th Av | North Beach Const. | renew pa# 2006/07/31/8045 to obtain final inspection. all work has been completed.Details
renew pa# 2006/07/31/8045 to obtain final inspection. all work has been completed. | |
| Jul 31, 2006 | Never finaled issued Jul 2006, no final | 1501 08th Av | North Beach Const. | work @ unit# c only. remove (e) counter & cabinets. replace with new counter & cabinets. re-hook up sink, dish washer & stove. miscellenous sheet rock patches. install new 40 amp. electrical line for stove. total 1 kitchen.Details
work @ unit# c only. remove (e) counter & cabinets. replace with new counter & cabinets. re-hook up sink, dish washer & stove. miscellenous sheet rock patches. install new 40 amp. electrical line for stove. total 1 kitchen. | $14,000 |
| Jan 30, 2006 | Completed final sign-off Feb 2006 | 1501 08th Av | reroofingDetails
reroofing | $2,500 | |
| Sep 27, 2005 | Never finaled issued Sep 2005, no final | 1501 08th Av | North Beach Const. | renew 200504281173Details
renew 200504281173 | |
| Sep 27, 2005 | Never finaled issued Sep 2005, no final | 1501 08th Av | North Beach Const. | renew 200411108900, 200501264059,200501072801Details
renew 200411108900, 200501264059,200501072801 | |
| Sep 26, 2005 | Never finaled issued Sep 2005, no final | 1501 08th Av | street space & sitewalk permit only.Details
street space & sitewalk permit only. | ||
| May 23, 2005 | Completed final sign-off Oct 2005 | 1501 08th Av | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $13,836 |
| Apr 28, 2005 | Never finaled issued Apr 2005, no final | 1501 08th Av | new common laundry space at ground levelDetails
new common laundry space at ground level | $1,000 | |
| Jan 26, 2005 | Never finaled issued Jan 2005, no final | 1501 08th Av | North Beach Const. | kitchen & bathroom remodel unit f, no structural work to be doneDetails
kitchen & bathroom remodel unit f, no structural work to be done | $19,000 |
| Jan 7, 2005 | Never finaled issued Jan 2005, no final | 1501 08th Av | add additional beam at ceiling of garage #1 for reinforcement purpuses (voluntary)Details
add additional beam at ceiling of garage #1 for reinforcement purpuses (voluntary) | $1,200 | |
| Nov 10, 2004 | Never finaled issued Nov 2004, no final | 1501 08th Av | North Beach Const. | kitchen & bathroom remodel, unit#b. no structural work to be done.Details
kitchen & bathroom remodel, unit#b. no structural work to be done. | $24,000 |
| Apr 30, 2004 | Completed final sign-off Aug 2004 | 1501 08th Av | North Beach Const. | unit #d- remodel kitchen & bath.no structural work to be doneDetails
unit #d- remodel kitchen & bath.no structural work to be done | $18,000 |
| Apr 1, 2004 | Never finaled issued Apr 2004, no final | 1501 08th Av | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $8,325 |
| Jul 1, 2003 | Completed final sign-off Sep 2003 | 1501 08th Av | North Beach Const. | kitchen and bathroom remodel, unit #e, no structural work to be doneDetails
kitchen and bathroom remodel, unit #e, no structural work to be done | $17,000 |
| Oct 16, 2002 | Completed final sign-off Feb 2003 | 1501 08th Av | North Beach Const. | #a-remodel bathroom, remove palster, sheetrock tiles & bath fix., resheetrock, install new bath fix.Details
#a-remodel bathroom, remove palster, sheetrock tiles & bath fix., resheetrock, install new bath fix. | $14,000 |
| Aug 9, 2001 | Completed final sign-off Nov 2001 | 1501 08th Av | kitchen & bathroom remodeling.unit#c plumbing & electrical work performed by other (licensed contracDetails
kitchen & bathroom remodeling.unit#c plumbing & electrical work performed by other (licensed contrac | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- North Beach Const. (9), The Lawson Roofing Co Inc. (2), Charles Window & Door/Golden Gate Home I, Gil Construction & Assoc Inc., Jakobson Construction Inc., Jemico Llc Dba Renewal By Andersen Of Sf, Reed Electric Company Inc Dba Century El, Sincere Construction Company Inc
- Architects
- Darren Wong, Tony Jackson
- Engineers
- Tim O'sullivan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.