J5 Real Estate Development Co
- Based in
- Walnut Creek
- On San Francisco permits
- Jan 2012 to Sep 2024
- Last 24 months
- 0 permits filed
86 permits since 2000: 66 completed, 3 in progress, 15 never finaled, 2 expired or cancelled.
Of the 15 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
13 stairs permits: 9 completed, 4 never finaled. Typically 56 days from filing to permit and 434 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2023 | Completed final sign-off May 2024 | 74 Lundys Ln | new stair to serve all (e) floors. additon of (2) new dormers on the 3rd floor. add new bathroom to the 3rd floor.Details
new stair to serve all (e) floors. additon of (2) new dormers on the 3rd floor. add new bathroom to the 3rd floor. | $45,000 |
| Nov 16, 2023 | Completed final sign-off May 2025 | 10 San Benito Wy | conversion of (e) basement storage & crawlspace to (n) habitable space, relocate stairs down, 1/f: (e) 1/2-bath & hallway renovation, (4) (n) wood windows & (1) wood door/side lite @ basement (not visible from street)Details
conversion of (e) basement storage & crawlspace to (n) habitable space, relocate stairs down, 1/f: (e) 1/2-bath & hallway renovation, (4) (n) wood windows & (1) wood door/side lite @ basement (not visible from street) | $180,000 |
| Aug 3, 2023 | Never finaled issued Aug 2023, no final | 952 Minnesota St | changing strong wall locations. revision to 202212299374; provide structural improvement to entry stair framingDetails
changing strong wall locations. revision to 202212299374; provide structural improvement to entry stair framing | |
| Dec 30, 2019 | Completed final sign-off Apr 2023 | 110 Ripley St | convert (e) garage into habitable space. replace foundation & slab. rebuild portion of (e) stair. replace (e) concrete stair.Details
convert (e) garage into habitable space. replace foundation & slab. rebuild portion of (e) stair. replace (e) concrete stair. | $60,000 |
| Oct 31, 2019 | Completed final sign-off Oct 2021 | 51 Mirabel Av | revision to pa 2017-0126-8031 revisions to 2 bathrooms, move stair 2'0"; locate catch basins & revise structural framing @ 2nd floor & roofDetails
revision to pa 2017-0126-8031 revisions to 2 bathrooms, move stair 2'0"; locate catch basins & revise structural framing @ 2nd floor & roof | |
| Jun 18, 2019 | Never finaled issued Aug 2019, no final | 760 Moultrie St | replace existing foundation walls at 1st floor, renovation 1st & 2nd floors, infill (e) 2 story lightwell, convert portion of (e) garage into habitable space, new interior stair, new windows.Details
replace existing foundation walls at 1st floor, renovation 1st & 2nd floors, infill (e) 2 story lightwell, convert portion of (e) garage into habitable space, new interior stair, new windows. | $150,000 |
| Jul 21, 2016 | Completed final sign-off Dec 2018 | 236 Mullen Av | new excavation for storage at garage level. (e) first floor renovation of living room, bathroom & storage. repair (e) front stair in kind, less than 50%.Details
new excavation for storage at garage level. (e) first floor renovation of living room, bathroom & storage. repair (e) front stair in kind, less than 50%. | $105,000 |
| May 7, 2015 | Completed final sign-off Mar 2016 | 101 Ridgewood Av | (n) ground floor master bedroom & bath; (n) mdia room; (n) interior stair; (re) bath & kitchen; (n) exterior redwood stair.Details
(n) ground floor master bedroom & bath; (n) mdia room; (n) interior stair; (re) bath & kitchen; (n) exterior redwood stair. | $75,000 |
| Dec 12, 2014 | Never finaled issued Jul 2016, no final | 124 Newman St | (n) dormer, renovation of (e) attic w/ (n) bath, (n) stairs new media room, (n) office, (n) roof deck. patch & repair (e) roof. (n) sidewalk tree.Details
(n) dormer, renovation of (e) attic w/ (n) bath, (n) stairs new media room, (n) office, (n) roof deck. patch & repair (e) roof. (n) sidewalk tree. | $200,000 |
| Oct 16, 2014 | Completed final sign-off Jan 2016 | 124 Newman St | grnd floor renovation: (n) bath, (n) bedroom, (n) office, (n) media; main floor renovation: bedroom, bathroom, kitchen, dining room living & family room, new stairs connecting main & ground floors, voluntary foundation repair.Details
grnd floor renovation: (n) bath, (n) bedroom, (n) office, (n) media; main floor renovation: bedroom, bathroom, kitchen, dining room living & family room, new stairs connecting main & ground floors, voluntary foundation repair. | $185,000 |
| Aug 11, 2014 | Completed final sign-off Feb 2015 | 560 Moultrie St | rerouting interior stair, removing kitchen at 3rd floor, and remodeling 3rd floor bathroom, and remodel 2nd floor kitchenDetails
rerouting interior stair, removing kitchen at 3rd floor, and remodeling 3rd floor bathroom, and remodel 2nd floor kitchen | $25,000 |
| Jan 17, 2014 | Never finaled issued Nov 2014, no final | 413 Shrader St | remodel interior of (e) blding as indicated on plans. replace (e) windows with new windows to match (e) in appearance patch & repair (e) siding as req'd. add new roof dormer to accommodate new interior code compliant stairway. replace (e) gutters & downspouts throughout. rebuild & reconfigure (e)Details
remodel interior of (e) blding as indicated on plans. replace (e) windows with new windows to match (e) in appearance patch & repair (e) siding as req'd. add new roof dormer to accommodate new interior code compliant stairway. replace (e) gutters & downspouts throughout. rebuild & reconfigure (e) | $90,000 |
| Sep 24, 2012 | Completed final sign-off Aug 2013 | 300 Winfield St | voluntary foundation replacement. renovate extg kitchen add new 1/2 bath(main level) floor 2. add new bath, 2 bedrooms, including one stairs on 1st floor.Details
voluntary foundation replacement. renovate extg kitchen add new 1/2 bath(main level) floor 2. add new bath, 2 bedrooms, including one stairs on 1st floor. | $95,000 |