Back to bathroom remodel contractors
J5 Real Estate Development Co
- Based in
- Walnut Creek
- On San Francisco permits
- Jan 2012 to Sep 2024
- Last 24 months
- 0 permits filed
86 permits since 2000: 66 completed, 3 in progress, 15 never finaled, 2 expired or cancelled.
Of the 15 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
47 bathroom remodel permits: 43 completed, 1 in progress, 3 never finaled. Typically 25 days from filing to permit and 253 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 6, 2024 | Completed final sign-off Mar 2025 | 1683 Page St | interior renovation of bathroom area and bedroom closet at 3rd floor.Details
interior renovation of bathroom area and bedroom closet at 3rd floor. | $18,000 |
| Dec 14, 2023 | Completed final sign-off May 2024 | 74 Lundys Ln | new stair to serve all (e) floors. additon of (2) new dormers on the 3rd floor. add new bathroom to the 3rd floor.Details
new stair to serve all (e) floors. additon of (2) new dormers on the 3rd floor. add new bathroom to the 3rd floor. | $45,000 |
| Nov 16, 2023 | Completed final sign-off May 2025 | 10 San Benito Wy | conversion of (e) basement storage & crawlspace to (n) habitable space, relocate stairs down, 1/f: (e) 1/2-bath & hallway renovation, (4) (n) wood windows & (1) wood door/side lite @ basement (not visible from street)Details
conversion of (e) basement storage & crawlspace to (n) habitable space, relocate stairs down, 1/f: (e) 1/2-bath & hallway renovation, (4) (n) wood windows & (1) wood door/side lite @ basement (not visible from street) | $180,000 |
| Oct 12, 2023 | In progress issued Oct 2023 | 150 Bronte St | revision to 201609167950. basement bath will now be a full bathroom. all heating changed to electricDetails
revision to 201609167950. basement bath will now be a full bathroom. all heating changed to electric | $1,000 |
| Jul 24, 2023 | Completed final sign-off Dec 2024 | 10 San Benito Wy | in-kind bathroom remodel at 1 bathroom replace existing plumbing and electrical fxitures.. no structural work, no framing modification.Details
in-kind bathroom remodel at 1 bathroom replace existing plumbing and electrical fxitures.. no structural work, no framing modification. | $10,000 |
| Dec 29, 2022 | Never finaled issued Aug 2023, no final | 952 Minnesota St | ref coa#2022-005798coa. 2)interior renovation of 952 including: conversion on 1st floor storage to new habitable space, infill under extg flr above approx 93 sq ft and partial renovation of extg bath. 3)interior renovation of 954 including: legalize 4th floor and provide nftp 13r sprinklersDetails
ref coa#2022-005798coa. 2)interior renovation of 952 including: conversion on 1st floor storage to new habitable space, infill under extg flr above approx 93 sq ft and partial renovation of extg bath. 3)interior renovation of 954 including: legalize 4th floor and provide nftp 13r sprinklers | $50,000 |
| Mar 15, 2022 | Completed final sign-off Mar 2024 | 199 Moultrie St | primary bedroom and bathroom horizontal addition on the top floor. roof deck under 500 sf.Details
primary bedroom and bathroom horizontal addition on the top floor. roof deck under 500 sf. | $150,000 |
| Aug 25, 2021 | Completed final sign-off Apr 2023 | 110 Ripley St | 1st fl - relocate (e) bathroom, renovate (e) kitchen, dining and bedroomsDetails
1st fl - relocate (e) bathroom, renovate (e) kitchen, dining and bedrooms | $141,129 |
| Feb 18, 2021 | Completed final sign-off Jul 2022 | 549 Jersey St | renovation of existing 200 sqft shed in rear yard. permitted and constructed in 1942. remove existing full bath & provide new half bath & wet bar to confirm to zoning administrator bulletin #1. all work at main dwelling under pa# 201812188681.Details
renovation of existing 200 sqft shed in rear yard. permitted and constructed in 1942. remove existing full bath & provide new half bath & wet bar to confirm to zoning administrator bulletin #1. all work at main dwelling under pa# 201812188681. | $20,000 |
| Oct 24, 2020 | Completed final sign-off May 2022 | 879 Douglass St | bathroom remodel. remodel (e) bathroom, addition of a toilet, replace (e) tub and sink w/ new. (n) electrical work to add (n) light fixtures and 1 fan. relocate (e) door to (n) location.Details
bathroom remodel. remodel (e) bathroom, addition of a toilet, replace (e) tub and sink w/ new. (n) electrical work to add (n) light fixtures and 1 fan. relocate (e) door to (n) location. | $30,000 |
| Mar 12, 2020 | Completed final sign-off Apr 2022 | 79 Walter St | 4th fl - residential condo renovation, 79 walter st - renovate (e) kitchen & dining room; renovate (e) bathroom; new full bathroom; reframe (e) ceiling and room. install new skylightsDetails
4th fl - residential condo renovation, 79 walter st - renovate (e) kitchen & dining room; renovate (e) bathroom; new full bathroom; reframe (e) ceiling and room. install new skylights | $50,000 |
| Dec 12, 2019 | Completed final sign-off Sep 2020 | 475 Roosevelt Wy | interior remodel: kitchen, add 1 new bath & closets. remove existing walls & doors. replcae 5 windows in-like-kind. structural work per structural. mep related to scopeDetails
interior remodel: kitchen, add 1 new bath & closets. remove existing walls & doors. replcae 5 windows in-like-kind. structural work per structural. mep related to scope | $40,000 |
| Oct 31, 2019 | Completed final sign-off Oct 2021 | 51 Mirabel Av | revision to pa 2017-0126-8031 revisions to 2 bathrooms, move stair 2'0"; locate catch basins & revise structural framing @ 2nd floor & roofDetails
revision to pa 2017-0126-8031 revisions to 2 bathrooms, move stair 2'0"; locate catch basins & revise structural framing @ 2nd floor & roof | |
| Sep 4, 2019 | Completed final sign-off Nov 2023 | 624 Moultrie St | 3rd flr addition, approx 514 s.f. w/ 1 bedroom , 1 bathroom, 1 deck.Details
3rd flr addition, approx 514 s.f. w/ 1 bedroom , 1 bathroom, 1 deck. | $50,000 |
| Apr 2, 2019 | Completed final sign-off Mar 2021 | 168 28th Av | residential remodel, replace windows and doors, add lightwell, ground floor condition floor area in basement add 1/2 bathroom. windows on west elevation (front) to be wood not clad.Details
residential remodel, replace windows and doors, add lightwell, ground floor condition floor area in basement add 1/2 bathroom. windows on west elevation (front) to be wood not clad. | $300,000 |
| Dec 18, 2018 | Completed final sign-off Dec 2022 | 549 Jersey St | addition of 3rd floor master suite & remodel of 2nd floor kitchen, bath. guestroom @ 1st floor.Details
addition of 3rd floor master suite & remodel of 2nd floor kitchen, bath. guestroom @ 1st floor. | $250,000 |
| Sep 12, 2018 | Completed final sign-off Mar 2019 | 560 Yale St | 1st flr - conversion of 125 sq ft of garage to habitable living, relocate (e) bathroom, (n) laundry, (n) skylights, (n) bedroom. 2nd flr - renovate kitchen and 2 bathroomsDetails
1st flr - conversion of 125 sq ft of garage to habitable living, relocate (e) bathroom, (n) laundry, (n) skylights, (n) bedroom. 2nd flr - renovate kitchen and 2 bathrooms | $50,000 |
| Jul 20, 2018 | Completed final sign-off Jan 2019 | 290 Maynard St | conversion of ground floor storage into 305 sq ft habitable space - bedroom & bathroomDetails
conversion of ground floor storage into 305 sq ft habitable space - bedroom & bathroom | $25,000 |
| Jun 21, 2017 | Completed final sign-off Jul 2019 | 98 Anderson St | removal of (e) 247 sf deck, construction of 359 sf of occupiable area across 2 levels w/in reduced footprint of (e) deck. conversion of some(e) garage space 472 sf of occupiable area. kitchen remodel as part of work. new bathroom as part of work. no excavation.Details
removal of (e) 247 sf deck, construction of 359 sf of occupiable area across 2 levels w/in reduced footprint of (e) deck. conversion of some(e) garage space 472 sf of occupiable area. kitchen remodel as part of work. new bathroom as part of work. no excavation. | $150,000 |
| May 3, 2017 | Completed final sign-off Sep 2020 | 157 Prospect Av | kitchen and bath renovation. unit 2 renovation. window replacement like for like. voluntary seismic strengthening. (32 st ft infill addition under separate permit #2017-0324-2284.)Details
kitchen and bath renovation. unit 2 renovation. window replacement like for like. voluntary seismic strengthening. (32 st ft infill addition under separate permit #2017-0324-2284.) | $150,000 |
| Jan 26, 2017 | Completed final sign-off Oct 2021 | 51 Mirabel Av | (n)2-story addition to rear; (n)basement; (n)bedrooms & bathrooms. renovate kitchen, living room & roof deck. add skylights. sprinkler nfpa 13 throughout.Details
(n)2-story addition to rear; (n)basement; (n)bedrooms & bathrooms. renovate kitchen, living room & roof deck. add skylights. sprinkler nfpa 13 throughout. | $200,000 |
| Dec 5, 2016 | Completed final sign-off Mar 2017 | 317 Surrey St | add 1 new bath at 3rd fl. convert. convert 1 full bath to 1/2 bath and pantry. no structural workDetails
add 1 new bath at 3rd fl. convert. convert 1 full bath to 1/2 bath and pantry. no structural work | $20,000 |
| Sep 22, 2016 | Never finaled issued Sep 2016, no final | 327 Winfield St | replace bathroom tile. repair shower pan. install new shower fixtures at same location.Details
replace bathroom tile. repair shower pan. install new shower fixtures at same location. | $2,000 |
| Jul 21, 2016 | Completed final sign-off Dec 2018 | 236 Mullen Av | new excavation for storage at garage level. (e) first floor renovation of living room, bathroom & storage. repair (e) front stair in kind, less than 50%.Details
new excavation for storage at garage level. (e) first floor renovation of living room, bathroom & storage. repair (e) front stair in kind, less than 50%. | $105,000 |
| Apr 19, 2016 | Completed final sign-off Feb 2017 | 327 Winfield St | basement expansion 136 sq ft: one (n) bedroom, relocate (e) one bath, renovate patio, none new wet bar (mud room), relocate office, convert (e) game room to bedroom. main floor: remove interior partitions, (n) skylight, renovate (e) sunroom, repair deck less than 50%.Details
basement expansion 136 sq ft: one (n) bedroom, relocate (e) one bath, renovate patio, none new wet bar (mud room), relocate office, convert (e) game room to bedroom. main floor: remove interior partitions, (n) skylight, renovate (e) sunroom, repair deck less than 50%. | $160,000 |
| Aug 20, 2015 | Completed final sign-off Oct 2016 | 529 Holly Park Cr | voluntary foundation replacement, renovate (e) kitchen, new half bathroom, relocate (e) full bathroom, renovate (e) bedroom.Details
voluntary foundation replacement, renovate (e) kitchen, new half bathroom, relocate (e) full bathroom, renovate (e) bedroom. | $75,000 |
| Aug 7, 2015 | Completed final sign-off Dec 2015 | 1040 Chenery St | renovation of extg kitchen and extg bath. new bathDetails
renovation of extg kitchen and extg bath. new bath | $28,000 |
| Jun 12, 2015 | Completed final sign-off Jan 2016 | 461 Gates St | renovate gr fl garage. voluntary foundation replacement. renovate main floor e kitchen and e dining room. new 1/2 bath and bicycle parking at gr fl. new rear deck 23 inches above grade with firewall on western property line.Details
renovate gr fl garage. voluntary foundation replacement. renovate main floor e kitchen and e dining room. new 1/2 bath and bicycle parking at gr fl. new rear deck 23 inches above grade with firewall on western property line. | $65,000 |
| May 7, 2015 | Completed final sign-off Mar 2016 | 101 Ridgewood Av | (n) ground floor master bedroom & bath; (n) mdia room; (n) interior stair; (re) bath & kitchen; (n) exterior redwood stair.Details
(n) ground floor master bedroom & bath; (n) mdia room; (n) interior stair; (re) bath & kitchen; (n) exterior redwood stair. | $75,000 |
| May 5, 2015 | Completed final sign-off Aug 2015 | 624 Moultrie St | converting from garage to new bathroom at ground floor convert 69 sf of garage space to livingDetails
converting from garage to new bathroom at ground floor convert 69 sf of garage space to living | $8,000 |
| Jan 15, 2015 | Completed final sign-off Jan 2016 | 124 Newman St | revision to app#201410169082. relocation of bathroom and storage. new bathroom and laundry closet. new moment frame.Details
revision to app#201410169082. relocation of bathroom and storage. new bathroom and laundry closet. new moment frame. | $40,000 |
| Dec 12, 2014 | Never finaled issued Jul 2016, no final | 124 Newman St | (n) dormer, renovation of (e) attic w/ (n) bath, (n) stairs new media room, (n) office, (n) roof deck. patch & repair (e) roof. (n) sidewalk tree.Details
(n) dormer, renovation of (e) attic w/ (n) bath, (n) stairs new media room, (n) office, (n) roof deck. patch & repair (e) roof. (n) sidewalk tree. | $200,000 |
| Oct 16, 2014 | Completed final sign-off Jan 2016 | 124 Newman St | grnd floor renovation: (n) bath, (n) bedroom, (n) office, (n) media; main floor renovation: bedroom, bathroom, kitchen, dining room living & family room, new stairs connecting main & ground floors, voluntary foundation repair.Details
grnd floor renovation: (n) bath, (n) bedroom, (n) office, (n) media; main floor renovation: bedroom, bathroom, kitchen, dining room living & family room, new stairs connecting main & ground floors, voluntary foundation repair. | $185,000 |
| Aug 11, 2014 | Completed final sign-off Feb 2015 | 560 Moultrie St | rerouting interior stair, removing kitchen at 3rd floor, and remodeling 3rd floor bathroom, and remodel 2nd floor kitchenDetails
rerouting interior stair, removing kitchen at 3rd floor, and remodeling 3rd floor bathroom, and remodel 2nd floor kitchen | $25,000 |
| Jun 6, 2014 | Completed final sign-off Oct 2014 | 1419 Kansas St | remove interior non-load bearing walls to enclose bathrooms and closets. install new plmg and electrical for new bathrooms and bedroom. replace doors and windows. renovate interior finishes.Details
remove interior non-load bearing walls to enclose bathrooms and closets. install new plmg and electrical for new bathrooms and bedroom. replace doors and windows. renovate interior finishes. | $30,000 |
| Mar 13, 2014 | Completed final sign-off Apr 2014 | 520 College Av | revision to pa#201402118276: dryrot repair at window located in bathroom, repair work is limited to approx. 5'x8' rotted plywood sheathing, no stud replacement, finish to match existing with stucco facing in-kind. plywd edge nailing shall be 10d@4"o.c. at all edges and 10d @ 12"o.c. at field.Details
revision to pa#201402118276: dryrot repair at window located in bathroom, repair work is limited to approx. 5'x8' rotted plywood sheathing, no stud replacement, finish to match existing with stucco facing in-kind. plywd edge nailing shall be 10d@4"o.c. at all edges and 10d @ 12"o.c. at field. | $500 |
| Feb 11, 2014 | Completed final sign-off Apr 2014 | 520 College Av | bathroom renovation @ main (2nd) floor, relocation of washer & dryer, demolition of laundry room in garage floor to be turned into storage room.Details
bathroom renovation @ main (2nd) floor, relocation of washer & dryer, demolition of laundry room in garage floor to be turned into storage room. | $8,500 |
| Nov 20, 2013 | Completed final sign-off Jan 2014 | 624 Moultrie St | remove wall between living room and kitchem - new header and structural colums; renovate bathroom in place.Details
remove wall between living room and kitchem - new header and structural colums; renovate bathroom in place. | $35,000 |
| Jul 31, 2013 | Completed final sign-off Apr 2016 | 3704 Folsom St | partial fulfillment (compliance) of violation #201389241. 1)removal of extg bathroom, kitchen, partitions, electrical and return the basement to pre construction status of storage. 2)removal of loft constructed without permits. separate permit is required to comply the whole violation.Details
partial fulfillment (compliance) of violation #201389241. 1)removal of extg bathroom, kitchen, partitions, electrical and return the basement to pre construction status of storage. 2)removal of loft constructed without permits. separate permit is required to comply the whole violation. | $5,000 |
| Mar 29, 2013 | Completed final sign-off Sep 2013 | 445 Banks St | renovation of existing ground level and bath area.Details
renovation of existing ground level and bath area. | $10,000 |
| Dec 4, 2012 | Completed final sign-off Mar 2013 | 10 Alviso St | remodel 2 bathrooms & add 1 new half bathroomDetails
remodel 2 bathrooms & add 1 new half bathroom | $23,000 |
| Nov 7, 2012 | Completed final sign-off Nov 2013 | 361 Highland Av | basement renovation: replacement of existing portion of garage slab, lowering of basement slab, addition of office, bath & 1/2 bath. first floor lightwell infill.Details
basement renovation: replacement of existing portion of garage slab, lowering of basement slab, addition of office, bath & 1/2 bath. first floor lightwell infill. | $50,000 |
| Sep 24, 2012 | Completed final sign-off Aug 2013 | 300 Winfield St | voluntary foundation replacement. renovate extg kitchen add new 1/2 bath(main level) floor 2. add new bath, 2 bedrooms, including one stairs on 1st floor.Details
voluntary foundation replacement. renovate extg kitchen add new 1/2 bath(main level) floor 2. add new bath, 2 bedrooms, including one stairs on 1st floor. | $95,000 |
| Jun 19, 2012 | Completed final sign-off Jul 2012 | 1391 Kansas St | kitchen remodel (like for like), bathroom remodel (like for like). replace furnace (like for like). install washer/dryer. no change on walls and openings.Details
kitchen remodel (like for like), bathroom remodel (like for like). replace furnace (like for like). install washer/dryer. no change on walls and openings. | $20,000 |
| Jun 19, 2012 | Completed final sign-off Feb 2013 | 81 Walter St | basement: 2-(n)posts w/(n) ftgs. floor 1(81a):renovate (e) kitchen & (e) bath, add (n) 1/2 bath, add 2-(n) headers. floor 2(81): same as floor 1, floor 3(79): no work this level.Details
basement: 2-(n)posts w/(n) ftgs. floor 1(81a):renovate (e) kitchen & (e) bath, add (n) 1/2 bath, add 2-(n) headers. floor 2(81): same as floor 1, floor 3(79): no work this level. | $50,000 |
| Mar 12, 2012 | Completed final sign-off May 2012 | 1385 Kansas St | like for like remodel of 1 unit. (1385) kitchen cabinets, sink, counters, and floor. replace bathroom tub, toilet, sinkd and floors. add washer and dryer hookup in water heater closet. replace furnaceDetails
like for like remodel of 1 unit. (1385) kitchen cabinets, sink, counters, and floor. replace bathroom tub, toilet, sinkd and floors. add washer and dryer hookup in water heater closet. replace furnace | $20,000 |
| Jan 9, 2012 | Completed final sign-off Jul 2012 | 103 Park St | unit 1: renovate (e) kitchen & (e) bath. unit 2: renovate (e) kitchen & (e) bath, add (n) closet, relocate (e) windows. unit 3: relocate/renovate (e) kitchen, renovate (e) bath, deepen (e) closet, relocate (e) windows. unit 4: no work.Details
unit 1: renovate (e) kitchen & (e) bath. unit 2: renovate (e) kitchen & (e) bath, add (n) closet, relocate (e) windows. unit 3: relocate/renovate (e) kitchen, renovate (e) bath, deepen (e) closet, relocate (e) windows. unit 4: no work. | $85,000 |