Back to kitchen remodel contractors
J5 Real Estate Development Co
- Based in
- Walnut Creek
- On San Francisco permits
- Jan 2012 to Sep 2024
- Last 24 months
- 0 permits filed
86 permits since 2000: 66 completed, 3 in progress, 15 never finaled, 2 expired or cancelled.
Of the 15 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 23 completed, 1 never finaled. Typically 40 days from filing to permit and 219 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2021 | Completed final sign-off Apr 2023 | 110 Ripley St | 1st fl - relocate (e) bathroom, renovate (e) kitchen, dining and bedroomsDetails
1st fl - relocate (e) bathroom, renovate (e) kitchen, dining and bedrooms | $141,129 |
| Apr 6, 2021 | Completed final sign-off May 2021 | 545 Melrose Av | remove and replace the kitchen cabinets keeping same location of the appliances. no change to layout of walls and openings.Details
remove and replace the kitchen cabinets keeping same location of the appliances. no change to layout of walls and openings. | $30,000 |
| Nov 25, 2020 | Completed final sign-off May 2022 | 879 Douglass St | kitchen remodel. removal of a column & replacement of beams, enlarging the kitchen windows facing the backyard & replacement of a door opening to the backyard. replace (e) floor joist in kitchen & addition of washer/dryer.Details
kitchen remodel. removal of a column & replacement of beams, enlarging the kitchen windows facing the backyard & replacement of a door opening to the backyard. replace (e) floor joist in kitchen & addition of washer/dryer. | $80,000 |
| Mar 12, 2020 | Completed final sign-off Apr 2022 | 79 Walter St | 4th fl - residential condo renovation, 79 walter st - renovate (e) kitchen & dining room; renovate (e) bathroom; new full bathroom; reframe (e) ceiling and room. install new skylightsDetails
4th fl - residential condo renovation, 79 walter st - renovate (e) kitchen & dining room; renovate (e) bathroom; new full bathroom; reframe (e) ceiling and room. install new skylights | $50,000 |
| Dec 12, 2019 | Completed final sign-off Sep 2020 | 475 Roosevelt Wy | interior remodel: kitchen, add 1 new bath & closets. remove existing walls & doors. replcae 5 windows in-like-kind. structural work per structural. mep related to scopeDetails
interior remodel: kitchen, add 1 new bath & closets. remove existing walls & doors. replcae 5 windows in-like-kind. structural work per structural. mep related to scope | $40,000 |
| Dec 18, 2018 | Completed final sign-off Dec 2022 | 549 Jersey St | addition of 3rd floor master suite & remodel of 2nd floor kitchen, bath. guestroom @ 1st floor.Details
addition of 3rd floor master suite & remodel of 2nd floor kitchen, bath. guestroom @ 1st floor. | $250,000 |
| Sep 12, 2018 | Completed final sign-off Mar 2019 | 560 Yale St | 1st flr - conversion of 125 sq ft of garage to habitable living, relocate (e) bathroom, (n) laundry, (n) skylights, (n) bedroom. 2nd flr - renovate kitchen and 2 bathroomsDetails
1st flr - conversion of 125 sq ft of garage to habitable living, relocate (e) bathroom, (n) laundry, (n) skylights, (n) bedroom. 2nd flr - renovate kitchen and 2 bathrooms | $50,000 |
| Jun 21, 2017 | Completed final sign-off Jul 2019 | 98 Anderson St | removal of (e) 247 sf deck, construction of 359 sf of occupiable area across 2 levels w/in reduced footprint of (e) deck. conversion of some(e) garage space 472 sf of occupiable area. kitchen remodel as part of work. new bathroom as part of work. no excavation.Details
removal of (e) 247 sf deck, construction of 359 sf of occupiable area across 2 levels w/in reduced footprint of (e) deck. conversion of some(e) garage space 472 sf of occupiable area. kitchen remodel as part of work. new bathroom as part of work. no excavation. | $150,000 |
| May 3, 2017 | Completed final sign-off Sep 2020 | 157 Prospect Av | kitchen and bath renovation. unit 2 renovation. window replacement like for like. voluntary seismic strengthening. (32 st ft infill addition under separate permit #2017-0324-2284.)Details
kitchen and bath renovation. unit 2 renovation. window replacement like for like. voluntary seismic strengthening. (32 st ft infill addition under separate permit #2017-0324-2284.) | $150,000 |
| Jan 26, 2017 | Completed final sign-off Oct 2021 | 51 Mirabel Av | (n)2-story addition to rear; (n)basement; (n)bedrooms & bathrooms. renovate kitchen, living room & roof deck. add skylights. sprinkler nfpa 13 throughout.Details
(n)2-story addition to rear; (n)basement; (n)bedrooms & bathrooms. renovate kitchen, living room & roof deck. add skylights. sprinkler nfpa 13 throughout. | $200,000 |
| Aug 20, 2015 | Completed final sign-off Oct 2016 | 529 Holly Park Cr | voluntary foundation replacement, renovate (e) kitchen, new half bathroom, relocate (e) full bathroom, renovate (e) bedroom.Details
voluntary foundation replacement, renovate (e) kitchen, new half bathroom, relocate (e) full bathroom, renovate (e) bedroom. | $75,000 |
| Aug 7, 2015 | Completed final sign-off Dec 2015 | 1040 Chenery St | renovation of extg kitchen and extg bath. new bathDetails
renovation of extg kitchen and extg bath. new bath | $28,000 |
| Jun 12, 2015 | Completed final sign-off Jan 2016 | 461 Gates St | renovate gr fl garage. voluntary foundation replacement. renovate main floor e kitchen and e dining room. new 1/2 bath and bicycle parking at gr fl. new rear deck 23 inches above grade with firewall on western property line.Details
renovate gr fl garage. voluntary foundation replacement. renovate main floor e kitchen and e dining room. new 1/2 bath and bicycle parking at gr fl. new rear deck 23 inches above grade with firewall on western property line. | $65,000 |
| May 7, 2015 | Completed final sign-off Mar 2016 | 101 Ridgewood Av | (n) ground floor master bedroom & bath; (n) mdia room; (n) interior stair; (re) bath & kitchen; (n) exterior redwood stair.Details
(n) ground floor master bedroom & bath; (n) mdia room; (n) interior stair; (re) bath & kitchen; (n) exterior redwood stair. | $75,000 |
| Dec 11, 2014 | Never finaled issued Apr 2015, no final | 124 Newman St | infill of extg lightwell at east side 2nd floor (e) kitchen.Details
infill of extg lightwell at east side 2nd floor (e) kitchen. | $800 |
| Oct 16, 2014 | Completed final sign-off Jan 2016 | 124 Newman St | grnd floor renovation: (n) bath, (n) bedroom, (n) office, (n) media; main floor renovation: bedroom, bathroom, kitchen, dining room living & family room, new stairs connecting main & ground floors, voluntary foundation repair.Details
grnd floor renovation: (n) bath, (n) bedroom, (n) office, (n) media; main floor renovation: bedroom, bathroom, kitchen, dining room living & family room, new stairs connecting main & ground floors, voluntary foundation repair. | $185,000 |
| Aug 11, 2014 | Completed final sign-off Feb 2015 | 560 Moultrie St | rerouting interior stair, removing kitchen at 3rd floor, and remodeling 3rd floor bathroom, and remodel 2nd floor kitchenDetails
rerouting interior stair, removing kitchen at 3rd floor, and remodeling 3rd floor bathroom, and remodel 2nd floor kitchen | $25,000 |
| Jul 31, 2013 | Completed final sign-off Apr 2016 | 3704 Folsom St | partial fulfillment (compliance) of violation #201389241. 1)removal of extg bathroom, kitchen, partitions, electrical and return the basement to pre construction status of storage. 2)removal of loft constructed without permits. separate permit is required to comply the whole violation.Details
partial fulfillment (compliance) of violation #201389241. 1)removal of extg bathroom, kitchen, partitions, electrical and return the basement to pre construction status of storage. 2)removal of loft constructed without permits. separate permit is required to comply the whole violation. | $5,000 |
| Sep 24, 2012 | Completed final sign-off Aug 2013 | 300 Winfield St | voluntary foundation replacement. renovate extg kitchen add new 1/2 bath(main level) floor 2. add new bath, 2 bedrooms, including one stairs on 1st floor.Details
voluntary foundation replacement. renovate extg kitchen add new 1/2 bath(main level) floor 2. add new bath, 2 bedrooms, including one stairs on 1st floor. | $95,000 |
| Jun 19, 2012 | Completed final sign-off Jul 2012 | 1391 Kansas St | kitchen remodel (like for like), bathroom remodel (like for like). replace furnace (like for like). install washer/dryer. no change on walls and openings.Details
kitchen remodel (like for like), bathroom remodel (like for like). replace furnace (like for like). install washer/dryer. no change on walls and openings. | $20,000 |
| Jun 19, 2012 | Completed final sign-off Feb 2013 | 81 Walter St | basement: 2-(n)posts w/(n) ftgs. floor 1(81a):renovate (e) kitchen & (e) bath, add (n) 1/2 bath, add 2-(n) headers. floor 2(81): same as floor 1, floor 3(79): no work this level.Details
basement: 2-(n)posts w/(n) ftgs. floor 1(81a):renovate (e) kitchen & (e) bath, add (n) 1/2 bath, add 2-(n) headers. floor 2(81): same as floor 1, floor 3(79): no work this level. | $50,000 |
| Jun 1, 2012 | Completed final sign-off Aug 2012 | 2952 21st St | kitchen remodel (like for like) , relocate water heater of kitchen, close doorway, seismic strap water heater & reconnect existing flue provide combustion air per code. kitchen lights shall comply with cec150(k)8Details
kitchen remodel (like for like) , relocate water heater of kitchen, close doorway, seismic strap water heater & reconnect existing flue provide combustion air per code. kitchen lights shall comply with cec150(k)8 | $20,000 |
| Mar 12, 2012 | Completed final sign-off May 2012 | 1385 Kansas St | like for like remodel of 1 unit. (1385) kitchen cabinets, sink, counters, and floor. replace bathroom tub, toilet, sinkd and floors. add washer and dryer hookup in water heater closet. replace furnaceDetails
like for like remodel of 1 unit. (1385) kitchen cabinets, sink, counters, and floor. replace bathroom tub, toilet, sinkd and floors. add washer and dryer hookup in water heater closet. replace furnace | $20,000 |
| Jan 9, 2012 | Completed final sign-off Jul 2012 | 103 Park St | unit 1: renovate (e) kitchen & (e) bath. unit 2: renovate (e) kitchen & (e) bath, add (n) closet, relocate (e) windows. unit 3: relocate/renovate (e) kitchen, renovate (e) bath, deepen (e) closet, relocate (e) windows. unit 4: no work.Details
unit 1: renovate (e) kitchen & (e) bath. unit 2: renovate (e) kitchen & (e) bath, add (n) closet, relocate (e) windows. unit 3: relocate/renovate (e) kitchen, renovate (e) bath, deepen (e) closet, relocate (e) windows. unit 4: no work. | $85,000 |