J P Petrie Associates Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Apr 2026
- Last 24 months
- 4 permits filed
38 permits since 2000: 33 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 expired or cancelled. Typically 10 days from filing to permit and 208 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 2740 Harrison St | replace rear stair steps with same material - presure treated wood 2x12. ref complaint 202536882 itmem # 2, 202537753Details
replace rear stair steps with same material - presure treated wood 2x12. ref complaint 202536882 itmem # 2, 202537753 | $5,000 |
| Jun 5, 2023 | Completed final sign-off Nov 2023 | 3233 21st St | remodel 3 bathrooms, kitchen. replace windows. new flooring. one gas water heater. replace all electrical wires, outlets, switches, one subpanel, laundry area, insulation, drywall. entrance hallway repairs. front main stairs repairs.Details
remodel 3 bathrooms, kitchen. replace windows. new flooring. one gas water heater. replace all electrical wires, outlets, switches, one subpanel, laundry area, insulation, drywall. entrance hallway repairs. front main stairs repairs. | $138,000 |
| Jul 21, 2017 | Completed final sign-off Apr 2018 | 373 Valley St | revision to pa 2017-0313-1327, revise stairs to basement level. revision to structural plansDetails
revision to pa 2017-0313-1327, revise stairs to basement level. revision to structural plans | $500 |
| Mar 13, 2017 | Completed final sign-off Apr 2018 | 373 Valley St | new interior stair, new finishes at (e) bathroom & revision /addition of windows on the rear facade. mep permits deferredDetails
new interior stair, new finishes at (e) bathroom & revision /addition of windows on the rear facade. mep permits deferred | $8,875 |
| Feb 12, 2016 | Expired or cancelled expired Aug 2019 | 2340 29th Av | add new deck @ s/w side @ 2rd flr; 3rd fl-remodel (e) bath, convert 2 bedrms to master bedrm; 2nd flr-remodel bath; ground floor - add 2 bedrooms, 1 bath, and family room; replace exterior stair & all windows in kind, replace wh and furnace, construct (n) footing & replace partial footing @ grd flr.Details
add new deck @ s/w side @ 2rd flr; 3rd fl-remodel (e) bath, convert 2 bedrms to master bedrm; 2nd flr-remodel bath; ground floor - add 2 bedrooms, 1 bath, and family room; replace exterior stair & all windows in kind, replace wh and furnace, construct (n) footing & replace partial footing @ grd flr. | $80,000 |