J P Petrie Associates Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Apr 2026
- Last 24 months
- 4 permits filed
38 permits since 2000: 33 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2023 | Completed final sign-off Nov 2023 | 3233 21st St | remodel 3 bathrooms, kitchen. replace windows. new flooring. one gas water heater. replace all electrical wires, outlets, switches, one subpanel, laundry area, insulation, drywall. entrance hallway repairs. front main stairs repairs.Details
remodel 3 bathrooms, kitchen. replace windows. new flooring. one gas water heater. replace all electrical wires, outlets, switches, one subpanel, laundry area, insulation, drywall. entrance hallway repairs. front main stairs repairs. | $138,000 |
| Jun 5, 2023 | Completed final sign-off Jul 2023 | 905 Russia Av | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $40,000 |
| Nov 18, 2022 | Completed final sign-off Jun 2023 | 76 Amethyst Wy | 1/f: reposition the entry door by filling in the existing entrance alcove. relocate the (e) water closet. demolish interior walls that are attached to the existing kitchen, dining room and w/c.Details
1/f: reposition the entry door by filling in the existing entrance alcove. relocate the (e) water closet. demolish interior walls that are attached to the existing kitchen, dining room and w/c. | $50,000 |
| Dec 30, 2020 | Completed final sign-off Apr 2021 | 39 Lake St | remodel kitchen in kind replacement, new cabinets. electrical and plumbing update. new appliances and lights. remodel bathroom: repair walls, reconfigure vanity, update electrical and plumbing, install new door, tile, no structual work.Details
remodel kitchen in kind replacement, new cabinets. electrical and plumbing update. new appliances and lights. remodel bathroom: repair walls, reconfigure vanity, update electrical and plumbing, install new door, tile, no structual work. | $40,000 |
| Aug 23, 2019 | Completed final sign-off Feb 2026 | 2154 42nd Av | horizontal addition to the rear of an (e) 2 stories, single family bldg. relocated kitchen to grd flr. add 3 bedrooms on 2nd flr.Details
horizontal addition to the rear of an (e) 2 stories, single family bldg. relocated kitchen to grd flr. add 3 bedrooms on 2nd flr. | $100,000 |
| Jun 9, 2016 | Completed final sign-off Apr 2017 | 419 02nd Av | to comply with nov 201574891 due to fire & water damage, replace wood framing in kind, replace lath/plaster w/gyp.bd. remove wall between kitchen & living room, remodel kitchen & baths, upgrade plumbing & electrical, turn water closet to full bath on #421, replace window throughout. n/a maherDetails
to comply with nov 201574891 due to fire & water damage, replace wood framing in kind, replace lath/plaster w/gyp.bd. remove wall between kitchen & living room, remodel kitchen & baths, upgrade plumbing & electrical, turn water closet to full bath on #421, replace window throughout. n/a maher | $100,000 |