Back to bathroom remodel contractors
J P Petrie Associates Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Apr 2026
- Last 24 months
- 4 permits filed
38 permits since 2000: 33 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 expired or cancelled. Typically 7 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2026 | Completed final sign-off Aug 2026 | 301 Santa Ana Av | remodel 2 bathrooms, update electrical, plumbing, new recess ights, outlets, switches, bathroom fan, remodel shower, one tankless water heater, new gasline, new 200 a service, new electrical panels - main, meter panel / switch gfi, tile bathroom.Details
remodel 2 bathrooms, update electrical, plumbing, new recess ights, outlets, switches, bathroom fan, remodel shower, one tankless water heater, new gasline, new 200 a service, new electrical panels - main, meter panel / switch gfi, tile bathroom. | $65,000 |
| Jan 9, 2025 | Completed final sign-off Feb 2026 | 2154 42nd Av | revision to bp#201908239699s, to revise master bedroom entrance, (e) walk-in closet on 2nd flr, and fixture configuration in 2nd floor and master bath; add one (n) skylight located in master bathroom. add (e) wet bar in family room on 2nd fl.Details
revision to bp#201908239699s, to revise master bedroom entrance, (e) walk-in closet on 2nd flr, and fixture configuration in 2nd floor and master bath; add one (n) skylight located in master bathroom. add (e) wet bar in family room on 2nd fl. | $20,000 |
| Apr 5, 2024 | Completed final sign-off Jun 2024 | 170 17th Av | remove plaster (ceiling and wall) install insulation and sheetrock in garage, storage, exercise room & hallway. electrical rewire outlets, switches, lights. add one sub panel. remodel bathroom and powder room.Details
remove plaster (ceiling and wall) install insulation and sheetrock in garage, storage, exercise room & hallway. electrical rewire outlets, switches, lights. add one sub panel. remodel bathroom and powder room. | $50,000 |
| Apr 5, 2024 | Completed final sign-off Aug 2024 | 1 Stanford Heights Av | remodel bathroom and bedroom at 1st floor. relocate w&d fixtures in garage. volunatry strengthening partial foundation & slab.Details
remodel bathroom and bedroom at 1st floor. relocate w&d fixtures in garage. volunatry strengthening partial foundation & slab. | $63,000 |
| Jun 5, 2023 | Completed final sign-off Nov 2023 | 3233 21st St | remodel 3 bathrooms, kitchen. replace windows. new flooring. one gas water heater. replace all electrical wires, outlets, switches, one subpanel, laundry area, insulation, drywall. entrance hallway repairs. front main stairs repairs.Details
remodel 3 bathrooms, kitchen. replace windows. new flooring. one gas water heater. replace all electrical wires, outlets, switches, one subpanel, laundry area, insulation, drywall. entrance hallway repairs. front main stairs repairs. | $138,000 |
| Jun 5, 2023 | Completed final sign-off Jul 2023 | 905 Russia Av | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $40,000 |
| Dec 30, 2020 | Completed final sign-off Apr 2021 | 39 Lake St | remodel kitchen in kind replacement, new cabinets. electrical and plumbing update. new appliances and lights. remodel bathroom: repair walls, reconfigure vanity, update electrical and plumbing, install new door, tile, no structual work.Details
remodel kitchen in kind replacement, new cabinets. electrical and plumbing update. new appliances and lights. remodel bathroom: repair walls, reconfigure vanity, update electrical and plumbing, install new door, tile, no structual work. | $40,000 |
| Apr 27, 2018 | Completed final sign-off Nov 2020 | 250 Urbano Dr | revsion to 201012307653 elliminate clay tile roof on 2nd fl, add a bedroom suite in basement, combine 2 bathrooms into one on 1st fl. relocate & enlarge windows at south & west side of the bulding no soft addedDetails
revsion to 201012307653 elliminate clay tile roof on 2nd fl, add a bedroom suite in basement, combine 2 bathrooms into one on 1st fl. relocate & enlarge windows at south & west side of the bulding no soft added | |
| Mar 13, 2017 | Completed final sign-off Apr 2018 | 373 Valley St | new interior stair, new finishes at (e) bathroom & revision /addition of windows on the rear facade. mep permits deferredDetails
new interior stair, new finishes at (e) bathroom & revision /addition of windows on the rear facade. mep permits deferred | $8,875 |
| Jun 9, 2016 | Completed final sign-off Apr 2017 | 419 02nd Av | to comply with nov 201574891 due to fire & water damage, replace wood framing in kind, replace lath/plaster w/gyp.bd. remove wall between kitchen & living room, remodel kitchen & baths, upgrade plumbing & electrical, turn water closet to full bath on #421, replace window throughout. n/a maherDetails
to comply with nov 201574891 due to fire & water damage, replace wood framing in kind, replace lath/plaster w/gyp.bd. remove wall between kitchen & living room, remodel kitchen & baths, upgrade plumbing & electrical, turn water closet to full bath on #421, replace window throughout. n/a maher | $100,000 |
| Feb 12, 2016 | Expired or cancelled expired Aug 2019 | 2340 29th Av | add new deck @ s/w side @ 2rd flr; 3rd fl-remodel (e) bath, convert 2 bedrms to master bedrm; 2nd flr-remodel bath; ground floor - add 2 bedrooms, 1 bath, and family room; replace exterior stair & all windows in kind, replace wh and furnace, construct (n) footing & replace partial footing @ grd flr.Details
add new deck @ s/w side @ 2rd flr; 3rd fl-remodel (e) bath, convert 2 bedrms to master bedrm; 2nd flr-remodel bath; ground floor - add 2 bedrooms, 1 bath, and family room; replace exterior stair & all windows in kind, replace wh and furnace, construct (n) footing & replace partial footing @ grd flr. | $80,000 |
| Jun 29, 2010 | Completed final sign-off Dec 2010 | 2160 Taylor St | fire damage to unit #4 and #6. replace front fascia, support for ceiling,dry wall,kchn, bathroom, floors, electrical, some plumbing, doors replacement, painting windows, u-factor. wood siding deck, furnace and heating duct. repair and replace extg. no structural workDetails
fire damage to unit #4 and #6. replace front fascia, support for ceiling,dry wall,kchn, bathroom, floors, electrical, some plumbing, doors replacement, painting windows, u-factor. wood siding deck, furnace and heating duct. repair and replace extg. no structural work | $100,000 |