J P Construction
- Based in
- San Mateo
- On San Francisco permits
- Apr 2000 to Jan 2010
- Last 24 months
- 0 permits filed
25 permits since 2000: 20 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 expired or cancelled. Typically 552 days from filing to permit and 808 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2008 | Completed final sign-off Jun 2013 | 201 Teresita Bl | vertical addition & alteration to existing - 1st floor (e): convert bedroom to family room; new deck; remodel bathroom fixtures & kitchen applicance. 2nd floor (new): add 3 bedrooms, 1 baths, new stairs. proposed revisions will reduce scope of work & total project cost.Details
vertical addition & alteration to existing - 1st floor (e): convert bedroom to family room; new deck; remodel bathroom fixtures & kitchen applicance. 2nd floor (new): add 3 bedrooms, 1 baths, new stairs. proposed revisions will reduce scope of work & total project cost. | $205,000 |
| Jun 2, 2006 | Expired or cancelled expired Dec 2006 | 1112 Noriega St | (n) deck rear of house 7-x9- with stairs trex decking removing (e) stairsDetails
(n) deck rear of house 7-x9- with stairs trex decking removing (e) stairs | $6,700 |