Back to kitchen remodel contractors
J P Construction
- Based in
- San Mateo
- On San Francisco permits
- Apr 2000 to Jan 2010
- Last 24 months
- 0 permits filed
25 permits since 2000: 20 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 3 days from filing to permit and 322 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2008 | Completed final sign-off Jan 2010 | 179 Fairmount St | remodel kitchen including cabinets, electrical, plumbing, flooring and add new 1/2 bathroom on 2nd floor.Details
remodel kitchen including cabinets, electrical, plumbing, flooring and add new 1/2 bathroom on 2nd floor. | $85,000 |
| Mar 31, 2008 | Completed final sign-off Jun 2013 | 201 Teresita Bl | vertical addition & alteration to existing - 1st floor (e): convert bedroom to family room; new deck; remodel bathroom fixtures & kitchen applicance. 2nd floor (new): add 3 bedrooms, 1 baths, new stairs. proposed revisions will reduce scope of work & total project cost.Details
vertical addition & alteration to existing - 1st floor (e): convert bedroom to family room; new deck; remodel bathroom fixtures & kitchen applicance. 2nd floor (new): add 3 bedrooms, 1 baths, new stairs. proposed revisions will reduce scope of work & total project cost. | $205,000 |
| Dec 20, 2005 | Completed final sign-off Mar 2006 | 593 Flood Av | kitchen remodel, electric & plumbing upgrade.Details
kitchen remodel, electric & plumbing upgrade. | $40,000 |
| Apr 25, 2000 | Completed final sign-off Oct 2000 | 763 Myra Wy | kitchen remodeling update electrical, window and doorDetails
kitchen remodeling update electrical, window and door | $15,000 |