Back to bathroom remodel contractors
J P Construction
- Based in
- San Mateo
- On San Francisco permits
- Apr 2000 to Jan 2010
- Last 24 months
- 0 permits filed
25 permits since 2000: 20 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 359 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2008 | Completed final sign-off Jan 2010 | 179 Fairmount St | remodel kitchen including cabinets, electrical, plumbing, flooring and add new 1/2 bathroom on 2nd floor.Details
remodel kitchen including cabinets, electrical, plumbing, flooring and add new 1/2 bathroom on 2nd floor. | $85,000 |
| Mar 31, 2008 | Completed final sign-off Jun 2013 | 201 Teresita Bl | vertical addition & alteration to existing - 1st floor (e): convert bedroom to family room; new deck; remodel bathroom fixtures & kitchen applicance. 2nd floor (new): add 3 bedrooms, 1 baths, new stairs. proposed revisions will reduce scope of work & total project cost.Details
vertical addition & alteration to existing - 1st floor (e): convert bedroom to family room; new deck; remodel bathroom fixtures & kitchen applicance. 2nd floor (new): add 3 bedrooms, 1 baths, new stairs. proposed revisions will reduce scope of work & total project cost. | $205,000 |
| Apr 25, 2007 | Completed final sign-off May 2007 | 591 Flood Av | replace patio door rear of house (on deck) w/ anderson door 6'x6'-8". replace (e) bath window w/same size (retrofit) w/abc manufactor white vinyl not visible from the street.Details
replace patio door rear of house (on deck) w/ anderson door 6'x6'-8". replace (e) bath window w/same size (retrofit) w/abc manufactor white vinyl not visible from the street. | $4,200 |
| Nov 28, 2006 | Completed final sign-off Feb 2007 | 763 Myra Wy | bathroom remodel-fixtures to remain-same location, new tub, pedestal sink, toilet, fixtures and tile. new electrical, lights & outlets, update 2/occupancy sensor, new linen closet, no structural changes. replace (e) skylight w/velux-same location.Details
bathroom remodel-fixtures to remain-same location, new tub, pedestal sink, toilet, fixtures and tile. new electrical, lights & outlets, update 2/occupancy sensor, new linen closet, no structural changes. replace (e) skylight w/velux-same location. | $20,000 |
| Jun 28, 2006 | Completed final sign-off Dec 2006 | 303 Monterey Bl | bathroom remodel n fixtures, window, tile, elec, plumbDetails
bathroom remodel n fixtures, window, tile, elec, plumb | $20,000 |
| Feb 25, 2002 | Completed final sign-off Feb 2003 | 724 Myra Wy | amend to 2002/02/20/9563. add tub/shower to half bath, change lower rear doors to windows-see drawinDetails
amend to 2002/02/20/9563. add tub/shower to half bath, change lower rear doors to windows-see drawin | $600 |
| Feb 20, 2002 | Completed final sign-off Feb 2003 | 724 Myra Wy | remove (e)deck build (n)deck, upgrade & legalize (e)lower bedroom, add (n)1/2 bath to lower bedroomDetails
remove (e)deck build (n)deck, upgrade & legalize (e)lower bedroom, add (n)1/2 bath to lower bedroom | $45,000 |