J L M Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Dec 2019
- Last 24 months
- 0 permits filed
54 permits since 2000: 45 completed, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
3 roof deck permits: 3 completed. Typically 142 days from filing to permit and 678 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2019 | Completed final sign-off Dec 2020 | 1486 26th Av | 1/f: add 2 bedrooms, 1 family area, 2 bathrooms, add laundry and sink, 2/f: remodel (e) kitchen & 2 bathrooms and living room. new roof deck on 1st floor lightwell infill and new roofdeck at highest level. infill under room on posts at rear. no work at front.Details
1/f: add 2 bedrooms, 1 family area, 2 bathrooms, add laundry and sink, 2/f: remodel (e) kitchen & 2 bathrooms and living room. new roof deck on 1st floor lightwell infill and new roofdeck at highest level. infill under room on posts at rear. no work at front. | $40,000 |
| Dec 1, 2014 | Completed final sign-off Feb 2017 | 1772 Jackson St | revision to 201304195007 s1 change exterior finish on penthouse from stucco to siding. structural work revision related to a smaller roof deck. no expansion of building foot print in this revision.Details
revision to 201304195007 s1 change exterior finish on penthouse from stucco to siding. structural work revision related to a smaller roof deck. no expansion of building foot print in this revision. | |
| May 15, 2014 | Completed final sign-off Apr 2020 | 423 24th Av | remodel of the entire res'd bldg to convert a one unit res'd bldg into a three dwelling unit res'd bldg. a vertical addition will be added to make the (e) two floors into four floors. also proposed is a roof deck and two balconies for the second and third units. the front facade will be redesigned.Details
remodel of the entire res'd bldg to convert a one unit res'd bldg into a three dwelling unit res'd bldg. a vertical addition will be added to make the (e) two floors into four floors. also proposed is a roof deck and two balconies for the second and third units. the front facade will be redesigned. | $450,000 |