Back to kitchen remodel contractors
J & L Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Aug 2026
- Last 24 months
- 2 permits filed
60 permits since 2000: 43 completed, 2 in progress, 8 never finaled, 7 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 9 completed, 3 never finaled, 3 expired or cancelled. Typically 1 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2023 | Completed final sign-off Sep 2023 | 2955 Webster St | one kitchen remodel: replace cabinet, counter, sink and ceiling lights.Details
one kitchen remodel: replace cabinet, counter, sink and ceiling lights. | $12,000 |
| Jun 13, 2023 | Completed final sign-off Oct 2024 | 2058 Thomas Av | abate nov#202200095.legalize kitchen setup,all work done in the ground fl unit.include lighting,electrical outlets,switches,ventilation fans,hvac sytem,plumbing work.replace & upsize electrical service main panel to 200amps,install 100 amps sub panel in the lower lvel proposed adu.Details
abate nov#202200095.legalize kitchen setup,all work done in the ground fl unit.include lighting,electrical outlets,switches,ventilation fans,hvac sytem,plumbing work.replace & upsize electrical service main panel to 200amps,install 100 amps sub panel in the lower lvel proposed adu. | $70,000 |
| Aug 12, 2022 | Completed final sign-off Dec 2023 | 970 Holloway Av | to comply with nov# 202290565. legalize dwelling unit at ground fl per ord 43-14. enlarge rear sliding door to become new unit entrance. convert (e) office to (n) bedroom. legalize kitchen.Details
to comply with nov# 202290565. legalize dwelling unit at ground fl per ord 43-14. enlarge rear sliding door to become new unit entrance. convert (e) office to (n) bedroom. legalize kitchen. | $10,000 |
| Nov 2, 2021 | Never finaled issued Nov 2021, no final | 79 Curtis St | comply with nov 202174595. show existing floor plans to reflect (e) condition. 1/f: add one bath, bedroom, family room and laundry. 2/f: relocated kitchen and dining. add one bath and rear deck. 3/f: remodel bath and bedrooms. add one bath. replace all windows in-kind at front.Details
comply with nov 202174595. show existing floor plans to reflect (e) condition. 1/f: add one bath, bedroom, family room and laundry. 2/f: relocated kitchen and dining. add one bath and rear deck. 3/f: remodel bath and bedrooms. add one bath. replace all windows in-kind at front. | $130,000 |
| Aug 9, 2021 | Expired or cancelled cancelled Oct 2021 | 79 Curtis St | comply with nov 202174595 and 202174744. revision to 201801098218. shower e floor plans to reflect e condition. 1st fl add 1 bath, bedroom, family rm, and laundry. 2nd fl relocate kitchen, dining, add 1 bath and rear deck. 3 fl remodel bath and bedrooms, add 1 bath. replace all windows in kind frontDetails
comply with nov 202174595 and 202174744. revision to 201801098218. shower e floor plans to reflect e condition. 1st fl add 1 bath, bedroom, family rm, and laundry. 2nd fl relocate kitchen, dining, add 1 bath and rear deck. 3 fl remodel bath and bedrooms, add 1 bath. replace all windows in kind front | $50,000 |
| Jun 10, 2020 | Completed final sign-off Jul 2020 | 1 Daniel Burnham Ct | unit #201: replacing few cabinets in existing kitchen in kind.Details
unit #201: replacing few cabinets in existing kitchen in kind. | $4,000 |
| Jan 9, 2018 | Expired or cancelled cancelled Jul 2021 | 79 Curtis St | remodeling: third floor- remodel (e) bathroom and add one new bathroom. 2nd floor -remove (e) half bathroom, remodel (e) bathroom & kitchen in kind. 1st floor - add one new full bathroom and a new bedroomDetails
remodeling: third floor- remodel (e) bathroom and add one new bathroom. 2nd floor -remove (e) half bathroom, remodel (e) bathroom & kitchen in kind. 1st floor - add one new full bathroom and a new bedroom | $100,000 |
| Apr 19, 2017 | Never finaled issued Apr 2017, no final | 94 Geneva Av | remodel (e) kitchen in-kind.Details
remodel (e) kitchen in-kind. | $21,000 |
| Jan 6, 2017 | Completed final sign-off Mar 2017 | 403 44th Av | a)3rd floor:remodel two extg bathrooms in kind b)2nd floor: remodel extg kitchen in kind c) 1st floor add a new office/family room; 292 sq ft. and 1 new bathroom. n/a for maherDetails
a)3rd floor:remodel two extg bathrooms in kind b)2nd floor: remodel extg kitchen in kind c) 1st floor add a new office/family room; 292 sq ft. and 1 new bathroom. n/a for maher | $70,000 |
| Dec 30, 2016 | Never finaled issued Dec 2016, no final | 5434 Geary Bl | unit #1: remodel existing kitchen/bathroom like for like no changes to wall locations.Details
unit #1: remodel existing kitchen/bathroom like for like no changes to wall locations. | $8,000 |
| Dec 30, 2015 | Completed final sign-off Aug 2016 | 2617 Cabrillo St | proposed (a)second floor: 1)remodel extg kitchen in kind. 2) a new bathroom and convert extg 1 1/2 to 2 1/2 bathrooms and 3)change extg dining to office(b) 1st floor: 1) a new bathroom. 2) relocate dryer washer and sink. 3) replace ext water heater to tankless water heater.Details
proposed (a)second floor: 1)remodel extg kitchen in kind. 2) a new bathroom and convert extg 1 1/2 to 2 1/2 bathrooms and 3)change extg dining to office(b) 1st floor: 1) a new bathroom. 2) relocate dryer washer and sink. 3) replace ext water heater to tankless water heater. | $50,000 |
| May 1, 2015 | Completed final sign-off Mar 2016 | 1439 05th Av | comply with complaint #201562451 consolidate pa#201406027258 & 201410108639. lower unit- remodel 1 bath, kitchen & replace interior finishes. upper unit- remodel 3 bathrooms, kitchen & (n) interior finishes. revision to pa#201406027258 at 1/fDetails
comply with complaint #201562451 consolidate pa#201406027258 & 201410108639. lower unit- remodel 1 bath, kitchen & replace interior finishes. upper unit- remodel 3 bathrooms, kitchen & (n) interior finishes. revision to pa#201406027258 at 1/f | $54,000 |
| Jan 22, 2015 | Completed final sign-off May 2015 | 130 Guttenberg St | remodel to two bathrooms & kitchen.Details
remodel to two bathrooms & kitchen. | $15,000 |
| Oct 10, 2014 | Expired or cancelled cancelled Oct 2015 | 1439 05th Av | remodel (e) kitchen 2nd fl. replace (e) furnace. replace (n) gyp. bd. @ dining room, living, rm, (e) 1 bedroom @ 2nd fl (n) gyp. bd. @ 3 bathrooms, 4 bdrms @ 3rd fl.Details
remodel (e) kitchen 2nd fl. replace (e) furnace. replace (n) gyp. bd. @ dining room, living, rm, (e) 1 bedroom @ 2nd fl (n) gyp. bd. @ 3 bathrooms, 4 bdrms @ 3rd fl. | $48,000 |
| Oct 5, 2006 | Completed final sign-off Feb 2007 | 10 Bertie Minor Ln | unit 6 - remodel existing kitchen- replace stove, counter, cabinets & floor. work on unit 6 only.Details
unit 6 - remodel existing kitchen- replace stove, counter, cabinets & floor. work on unit 6 only. | $3,000 |