Block 1670, lot 001B
2617 Cabrillo St
- City’s use
- Single Family Residential
- Built
- 1948
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 3 bathrooms
- Building
- 2,240 sq ft
- Lot
- 2,250 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2017 | Never finaled issued Mar 2017, no final | 2617 Cabrillo St | Superior Roofing Solutions | roof patch approx 200sf.Details
roof patch approx 200sf. | $5,800 |
| Jan 20, 2017 | Completed final sign-off Jun 2017 | 2617 Cabrillo St | Farinato Construction Inc. | legalize existing rooms on lower floor (office, exercise and work room). (n) entry door wall, remove secondary interior stair, remove old exterior door to backyard, replace old roof glazing with new tempered glass unit. replace 2 old skylights with new velux (same size). add 8' high (max) trellisDetails
legalize existing rooms on lower floor (office, exercise and work room). (n) entry door wall, remove secondary interior stair, remove old exterior door to backyard, replace old roof glazing with new tempered glass unit. replace 2 old skylights with new velux (same size). add 8' high (max) trellis | $30,000 |
| Jan 4, 2017 | Completed final sign-off Mar 2017 | 2617 Cabrillo St | inkind replacement of wood casement-fixed windows (2) on front with marvin aluminum-clad wood windowsDetails
inkind replacement of wood casement-fixed windows (2) on front with marvin aluminum-clad wood windows | $18,000 | |
| Jan 4, 2017 | Completed final sign-off Jun 2017 | 2617 Cabrillo St | Farinato Construction Inc. | bathroom remodel, change tub to shower, change single vanity to double vanity, re-position toiletm add light fixture, add electric warm floor under tileDetails
bathroom remodel, change tub to shower, change single vanity to double vanity, re-position toiletm add light fixture, add electric warm floor under tile | $25,000 |
| Mar 14, 2016 | Completed final sign-off Aug 2016 | 2617 Cabrillo St | J & L Construction Co. | proposed a rear wood platform about 20'x19'-3"-12" high/above finish grade.Details
proposed a rear wood platform about 20'x19'-3"-12" high/above finish grade. | $2,000 |
| Dec 30, 2015 | Completed final sign-off Aug 2016 | 2617 Cabrillo St | J & L Construction Co. | proposed (a)second floor: 1)remodel extg kitchen in kind. 2) a new bathroom and convert extg 1 1/2 to 2 1/2 bathrooms and 3)change extg dining to office(b) 1st floor: 1) a new bathroom. 2) relocate dryer washer and sink. 3) replace ext water heater to tankless water heater.Details
proposed (a)second floor: 1)remodel extg kitchen in kind. 2) a new bathroom and convert extg 1 1/2 to 2 1/2 bathrooms and 3)change extg dining to office(b) 1st floor: 1) a new bathroom. 2) relocate dryer washer and sink. 3) replace ext water heater to tankless water heater. | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Farinato Construction Inc. (2), J & L Construction Co. (2), Superior Roofing Solutions
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.