Farinato Construction Inc.
- Based in
- Glen Ellen
- On San Francisco permits
- Dec 2013 to Jan 2017
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2017 | Completed final sign-off Jun 2017 | 2617 Cabrillo St | legalize existing rooms on lower floor (office, exercise and work room). (n) entry door wall, remove secondary interior stair, remove old exterior door to backyard, replace old roof glazing with new tempered glass unit. replace 2 old skylights with new velux (same size). add 8' high (max) trellisDetails
legalize existing rooms on lower floor (office, exercise and work room). (n) entry door wall, remove secondary interior stair, remove old exterior door to backyard, replace old roof glazing with new tempered glass unit. replace 2 old skylights with new velux (same size). add 8' high (max) trellis | $30,000 |
| Jan 4, 2017 | Completed final sign-off Jun 2017 | 2617 Cabrillo St | bathroom remodel, change tub to shower, change single vanity to double vanity, re-position toiletm add light fixture, add electric warm floor under tileDetails
bathroom remodel, change tub to shower, change single vanity to double vanity, re-position toiletm add light fixture, add electric warm floor under tile | $25,000 |
| Jan 14, 2014 | Completed final sign-off May 2014 | 1531 07th Av | revision to app#201312305267. remodel kitchen and bath. raise light well in bath.Details
revision to app#201312305267. remodel kitchen and bath. raise light well in bath. | |
| Dec 30, 2013 | Completed final sign-off May 2014 | 1531 07th Av | bathroom remodel, shower & toilet location switched, new vanity & new tub same location, new flooring; kitchen remodel, new cabinetes & appliances, refinish floor, new light fixtures - to comply with cec150(k) 8 & 10Details
bathroom remodel, shower & toilet location switched, new vanity & new tub same location, new flooring; kitchen remodel, new cabinetes & appliances, refinish floor, new light fixtures - to comply with cec150(k) 8 & 10 | $72,425 |