Back to bathroom remodel contractors
J & L Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Aug 2026
- Last 24 months
- 2 permits filed
60 permits since 2000: 43 completed, 2 in progress, 8 never finaled, 7 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 14 completed, 3 never finaled, 5 expired or cancelled. Typically 4 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2022 | Completed final sign-off Mar 2023 | 1579 28th Av | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $90,000 |
| Nov 9, 2021 | Completed final sign-off Mar 2023 | 1579 28th Av | g/f: interior remodel: add 2 bedrooms, 2 bathrooms, a media room on 1st floor.Details
g/f: interior remodel: add 2 bedrooms, 2 bathrooms, a media room on 1st floor. | $50,000 |
| Nov 2, 2021 | Never finaled issued Nov 2021, no final | 79 Curtis St | comply with nov 202174595. show existing floor plans to reflect (e) condition. 1/f: add one bath, bedroom, family room and laundry. 2/f: relocated kitchen and dining. add one bath and rear deck. 3/f: remodel bath and bedrooms. add one bath. replace all windows in-kind at front.Details
comply with nov 202174595. show existing floor plans to reflect (e) condition. 1/f: add one bath, bedroom, family room and laundry. 2/f: relocated kitchen and dining. add one bath and rear deck. 3/f: remodel bath and bedrooms. add one bath. replace all windows in-kind at front. | $130,000 |
| Aug 9, 2021 | Expired or cancelled cancelled Oct 2021 | 79 Curtis St | comply with nov 202174595 and 202174744. revision to 201801098218. shower e floor plans to reflect e condition. 1st fl add 1 bath, bedroom, family rm, and laundry. 2nd fl relocate kitchen, dining, add 1 bath and rear deck. 3 fl remodel bath and bedrooms, add 1 bath. replace all windows in kind frontDetails
comply with nov 202174595 and 202174744. revision to 201801098218. shower e floor plans to reflect e condition. 1st fl add 1 bath, bedroom, family rm, and laundry. 2nd fl relocate kitchen, dining, add 1 bath and rear deck. 3 fl remodel bath and bedrooms, add 1 bath. replace all windows in kind front | $50,000 |
| Aug 20, 2019 | Completed final sign-off Oct 2019 | 357 Warren Dr | remodel (e) kichen and bathroom in kindDetails
remodel (e) kichen and bathroom in kind | $25,000 |
| Jan 9, 2018 | Expired or cancelled cancelled Jul 2021 | 79 Curtis St | remodeling: third floor- remodel (e) bathroom and add one new bathroom. 2nd floor -remove (e) half bathroom, remodel (e) bathroom & kitchen in kind. 1st floor - add one new full bathroom and a new bedroomDetails
remodeling: third floor- remodel (e) bathroom and add one new bathroom. 2nd floor -remove (e) half bathroom, remodel (e) bathroom & kitchen in kind. 1st floor - add one new full bathroom and a new bedroom | $100,000 |
| Sep 25, 2017 | Completed final sign-off Jun 2018 | 371 Victoria St | propesed 1 new bedroom, 1 new full bath on 1st fl. relocate dryer, washer, sinkDetails
propesed 1 new bedroom, 1 new full bath on 1st fl. relocate dryer, washer, sink | $40,000 |
| Jan 6, 2017 | Completed final sign-off Mar 2017 | 403 44th Av | a)3rd floor:remodel two extg bathrooms in kind b)2nd floor: remodel extg kitchen in kind c) 1st floor add a new office/family room; 292 sq ft. and 1 new bathroom. n/a for maherDetails
a)3rd floor:remodel two extg bathrooms in kind b)2nd floor: remodel extg kitchen in kind c) 1st floor add a new office/family room; 292 sq ft. and 1 new bathroom. n/a for maher | $70,000 |
| Dec 30, 2016 | Never finaled issued Dec 2016, no final | 5434 Geary Bl | unit #1: remodel existing kitchen/bathroom like for like no changes to wall locations.Details
unit #1: remodel existing kitchen/bathroom like for like no changes to wall locations. | $8,000 |
| Sep 1, 2016 | Completed final sign-off Aug 2017 | 967 Delano Av | add a full bathroom on 2nd floor closet. add 2 bedrooms, a media room, and 2 full baths on 1st floor.Details
add a full bathroom on 2nd floor closet. add 2 bedrooms, a media room, and 2 full baths on 1st floor. | $55,000 |
| Dec 30, 2015 | Completed final sign-off Aug 2016 | 2617 Cabrillo St | proposed (a)second floor: 1)remodel extg kitchen in kind. 2) a new bathroom and convert extg 1 1/2 to 2 1/2 bathrooms and 3)change extg dining to office(b) 1st floor: 1) a new bathroom. 2) relocate dryer washer and sink. 3) replace ext water heater to tankless water heater.Details
proposed (a)second floor: 1)remodel extg kitchen in kind. 2) a new bathroom and convert extg 1 1/2 to 2 1/2 bathrooms and 3)change extg dining to office(b) 1st floor: 1) a new bathroom. 2) relocate dryer washer and sink. 3) replace ext water heater to tankless water heater. | $50,000 |
| May 1, 2015 | Completed final sign-off Mar 2016 | 1439 05th Av | comply with complaint #201562451 consolidate pa#201406027258 & 201410108639. lower unit- remodel 1 bath, kitchen & replace interior finishes. upper unit- remodel 3 bathrooms, kitchen & (n) interior finishes. revision to pa#201406027258 at 1/fDetails
comply with complaint #201562451 consolidate pa#201406027258 & 201410108639. lower unit- remodel 1 bath, kitchen & replace interior finishes. upper unit- remodel 3 bathrooms, kitchen & (n) interior finishes. revision to pa#201406027258 at 1/f | $54,000 |
| Jan 22, 2015 | Completed final sign-off May 2015 | 130 Guttenberg St | remodel to two bathrooms & kitchen.Details
remodel to two bathrooms & kitchen. | $15,000 |
| Jan 2, 2015 | Expired or cancelled expired Feb 2018 | 396 Allison St | add new deck in rear per plan, add bedroom, family room and bathroom on 1st floor per plan.Details
add new deck in rear per plan, add bedroom, family room and bathroom on 1st floor per plan. | $25,000 |
| Oct 10, 2014 | Expired or cancelled cancelled Oct 2015 | 1439 05th Av | remodel (e) kitchen 2nd fl. replace (e) furnace. replace (n) gyp. bd. @ dining room, living, rm, (e) 1 bedroom @ 2nd fl (n) gyp. bd. @ 3 bathrooms, 4 bdrms @ 3rd fl.Details
remodel (e) kitchen 2nd fl. replace (e) furnace. replace (n) gyp. bd. @ dining room, living, rm, (e) 1 bedroom @ 2nd fl (n) gyp. bd. @ 3 bathrooms, 4 bdrms @ 3rd fl. | $48,000 |
| Jun 2, 2014 | Expired or cancelled expired Mar 2016 | 1439 05th Av | to comply w/ocmplaint 200904785 - add two bedrooms, two bathrooms laundry & storage on 1st floor per plan.Details
to comply w/ocmplaint 200904785 - add two bedrooms, two bathrooms laundry & storage on 1st floor per plan. | $40,000 |
| Mar 19, 2014 | Never finaled issued Apr 2014, no final | 783 42nd Av | add 2 bathrooms, 2 bedrooms, , laundry room, mudroom and storage on 1st floor per plan.Details
add 2 bathrooms, 2 bedrooms, , laundry room, mudroom and storage on 1st floor per plan. | $50,000 |
| Mar 12, 2014 | Completed final sign-off May 2014 | 2587 30th Av | add 1 bedroom on 1/f per plan, bathroom relocate on 1/f per plan.Details
add 1 bedroom on 1/f per plan, bathroom relocate on 1/f per plan. | $30,000 |
| Jul 12, 2012 | Completed final sign-off Oct 2012 | 86 Everglade Dr | proposed one new bathroom and replacing damaged slide door at rear in-kind on first floor.Details
proposed one new bathroom and replacing damaged slide door at rear in-kind on first floor. | $10,000 |
| Mar 5, 2012 | Completed final sign-off Oct 2012 | 1216 32nd Av | add two bedrooms and bathrooms on the 1st floor & laundry room and study room on 1st floor per plan.Details
add two bedrooms and bathrooms on the 1st floor & laundry room and study room on 1st floor per plan. | $45,000 |
| Jul 1, 2011 | Completed final sign-off Sep 2011 | 15 Springfield Dr | 1)construct a new half bath and enlarge the closet in one of the front bedroom. 2)replacing all 6 extg recess lights in living room.Details
1)construct a new half bath and enlarge the closet in one of the front bedroom. 2)replacing all 6 extg recess lights in living room. | $9,000 |
| Dec 31, 2010 | Completed final sign-off May 2011 | 2531 29th Av | revision to 201012156761, reduce scope of work per plan. delete bedroom and relocate full bath at ground floor. revise cost estimate from $70979 to $20000.Details
revision to 201012156761, reduce scope of work per plan. delete bedroom and relocate full bath at ground floor. revise cost estimate from $70979 to $20000. |