Permit GraphShortlistSan Francisco building permits since 2000

J..H. Construction Co./John A Huerta Co

Contractor license
462070
State license record
Based in
San Francisco
On San Francisco permits
Mar 2002 to Jul 2026
Last 24 months
5 permits filed

67 permits since 2000: 50 completed, 13 never finaled, 4 expired or cancelled.

Of the 13 never-finaled permits, 7 are 5 to 10 years old, 6 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Stairs permits

AllRoof deck 4Deck 4Stairs 7Kitchen remodel 8Bathroom remodel 10

7 stairs permits: 5 completed, 2 never finaled. Typically 10 days from filing to permit and 376 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Nov 7, 2024Completed
final sign-off Nov 2025
4340 Anza Strepair stair at rear, paint and install adequate lighting and smoke detectors. to comply with nov #: 2024-30084 item #2. less than 50%. no plumbing
Details
Permit
202411074612
Permit issued
Nov 7, 2024
Final sign-off
Nov 18, 2025

repair stair at rear, paint and install adequate lighting and smoke detectors. to comply with nov #: 2024-30084 item #2. less than 50%. no plumbing

Open the permit page

$2,500
Jul 14, 2020Never finaled
issued Jul 2020, no final
789 Teresita Blstucco repair front and corner of the house and front of stairs. cosmetic repair. 30-60 sf
Details
Permit
202007140140
Permit issued
Jul 24, 2020

stucco repair front and corner of the house and front of stairs. cosmetic repair. 30-60 sf

Open the permit page

$3,500
Oct 10, 2019Completed
final sign-off Nov 2021
612 Howard Stt.i. new convenience stair
Details
Permit
201910104186
Permit issued
Oct 17, 2019
Final sign-off
Nov 10, 2021

t.i. new convenience stair

Open the permit page

$2,000
Jul 31, 2013Completed
final sign-off Jul 2015
56 Aztec St1/fl-enclose&reconstruct entry stair.create landing@midpt.reloc washer/dryer.reconstruct wood fl at crawl space. 2/fl-enclose lt well@enry stair&(n)stair to new 3rd story. 3/fl-create new mstr bedrm & bathrm w/ roof deck@frt of bldg.
Details
Permit
201307313244
Permit issued
May 19, 2014
Final sign-off
Jul 16, 2015

1/fl-enclose&reconstruct entry stair.create landing@midpt.reloc washer/dryer.reconstruct wood fl at crawl space. 2/fl-enclose lt well@enry stair&(n)stair to new 3rd story. 3/fl-create new mstr bedrm & bathrm w/ roof deck@frt of bldg.

Open the permit page

$150,000
Nov 4, 2011Never finaled
issued Mar 2012, no final
28 Montcalm Stsupplemental to work under permit#201106228702. horizontal extension @ ground floor with (n) first floor deck above. (n) stair & deck to rear yard.
Details
Permit
201111048276
Permit issued
Mar 13, 2012

supplemental to work under permit#201106228702. horizontal extension @ ground floor with (n) first floor deck above. (n) stair & deck to rear yard.

Open the permit page

$15,000
May 11, 2010Completed
final sign-off Nov 2010
2830 Mission Stupgrade to two bathroom of an (e) restaurant taqueria san jose. three lever handle locks. isa signage. repair dry rot at rear siding. new exit door at the rear. new handrail to exit stairs ( 3) steps. repair steps and landing to rear brpken tiles. lower 4' of counter for isa
Details
Permit
201005112191
Permit issued
May 12, 2010
Final sign-off
Nov 8, 2010

upgrade to two bathroom of an (e) restaurant taqueria san jose. three lever handle locks. isa signage. repair dry rot at rear siding. new exit door at the rear. new handrail to exit stairs ( 3) steps. repair steps and landing to rear brpken tiles. lower 4' of counter for isa

Open the permit page

$14,000
Mar 26, 2002Completed
final sign-off Mar 2003
740 Clementina Stadd clerestory, reroof,floor diaphragm. upgrades: rebuild stair/toilet to conform, new gaurdrail
Details
Permit
200203262333
Permit issued
Jun 12, 2002
Final sign-off
Mar 18, 2003

add clerestory, reroof,floor diaphragm. upgrades: rebuild stair/toilet to conform, new gaurdrail

Open the permit page

$42,100