Back to bathroom remodel contractors
J..H. Construction Co./John A Huerta Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2002 to Jul 2026
- Last 24 months
- 6 permits filed
67 permits since 2000: 50 completed, 13 never finaled, 4 expired or cancelled.
Of the 13 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 6 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2022 | Completed final sign-off Oct 2024 | 38 Samoset St | lower bedroom addition under (e) living room. kitchen & bathroom remodel. modification of (e) deck. (n) windows & doors.Details
lower bedroom addition under (e) living room. kitchen & bathroom remodel. modification of (e) deck. (n) windows & doors. | $400,000 |
| Apr 25, 2019 | Never finaled issued May 2019, no final | 612 Howard St | third floor tenant improvement: eliminate corridor (n) bathrooms, (n) lighting, (n) non-structural partitions, paint. (n) elevator panel upgrade, (n) entry (bldg) threshold. maher n/a.Details
third floor tenant improvement: eliminate corridor (n) bathrooms, (n) lighting, (n) non-structural partitions, paint. (n) elevator panel upgrade, (n) entry (bldg) threshold. maher n/a. | $90,000 |
| May 30, 2018 | Completed final sign-off Nov 2018 | 44 Ulloa St | kitchen area 100sq ft, bathroom 60sq ft. remove and replace existing cabinets, new counter tops, new floor coverings. remove and replace plumbing fixtures, new tuke for tub/shower, new tile floor. patch 7 paint. flooring in kitchenette.Details
kitchen area 100sq ft, bathroom 60sq ft. remove and replace existing cabinets, new counter tops, new floor coverings. remove and replace plumbing fixtures, new tuke for tub/shower, new tile floor. patch 7 paint. flooring in kitchenette. | $44,000 |
| Feb 5, 2018 | Never finaled issued Feb 2018, no final | 709 Central Av | remove and replace plumbing fixtures and kitchen cabinets with new. install new outlets and lighting fixtures. new floor covering in bath and kitchen. new tile in bath/tub surround.Details
remove and replace plumbing fixtures and kitchen cabinets with new. install new outlets and lighting fixtures. new floor covering in bath and kitchen. new tile in bath/tub surround. | $35,000 |
| Sep 15, 2016 | Never finaled issued Oct 2016, no final | 105 Bache St | replace (4) windows (3) in front (1) in rear bath. repair ext siding possible replace dry rot under rear window siding. street facing windows to be replaced with vinylDetails
replace (4) windows (3) in front (1) in rear bath. repair ext siding possible replace dry rot under rear window siding. street facing windows to be replaced with vinyl | $2,500 |
| Dec 9, 2014 | Completed final sign-off Jan 2015 | 31 Miramar Av | upstair bathroom. install new floor tile and wall tile in shower. new toilet, add one light to ceiling. new shower valve. high efficacy light fixture.Details
upstair bathroom. install new floor tile and wall tile in shower. new toilet, add one light to ceiling. new shower valve. high efficacy light fixture. | $3,500 |
| Nov 5, 2014 | Expired or cancelled expired Feb 2017 | 585 Crestlake Dr | bathroom remodel & fix plumbing leak, replace toilet and sink, tile floor.Details
bathroom remodel & fix plumbing leak, replace toilet and sink, tile floor. | $4,500 |
| Jun 13, 2013 | Completed final sign-off Nov 2016 | 146 Joost Av | remodel & expand 1st floor: kitchen remodel, new interior courtyard, bedroom & bathroom, new partial 2nd floor on rear-facing side (not visible from street) with new master bedroom, bathroom & walk in closet & a small deck.Details
remodel & expand 1st floor: kitchen remodel, new interior courtyard, bedroom & bathroom, new partial 2nd floor on rear-facing side (not visible from street) with new master bedroom, bathroom & walk in closet & a small deck. | $190,575 |
| May 11, 2010 | Completed final sign-off Nov 2010 | 2830 Mission St | upgrade to two bathroom of an (e) restaurant taqueria san jose. three lever handle locks. isa signage. repair dry rot at rear siding. new exit door at the rear. new handrail to exit stairs ( 3) steps. repair steps and landing to rear brpken tiles. lower 4' of counter for isaDetails
upgrade to two bathroom of an (e) restaurant taqueria san jose. three lever handle locks. isa signage. repair dry rot at rear siding. new exit door at the rear. new handrail to exit stairs ( 3) steps. repair steps and landing to rear brpken tiles. lower 4' of counter for isa | $14,000 |
| Feb 19, 2008 | Completed final sign-off Sep 2008 | 327 Linden St | remodel (1) kitchen and (1) bathroom, repair walls, sand floors and paint @ not greater one floor of than 2/3 of the total floor area of plaster to be removed/or structural upgrade reqd @ common area hall etc.replace w/ 5/8 type x all areas.flourescent lights & exhaust fan in bathroom.Details
remodel (1) kitchen and (1) bathroom, repair walls, sand floors and paint @ not greater one floor of than 2/3 of the total floor area of plaster to be removed/or structural upgrade reqd @ common area hall etc.replace w/ 5/8 type x all areas.flourescent lights & exhaust fan in bathroom. | $20,000 |