J..H. Construction Co./John A Huerta Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2002 to Jul 2026
- Last 24 months
- 6 permits filed
67 permits since 2000: 50 completed, 13 never finaled, 4 expired or cancelled.
Of the 13 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 2 completed, 2 never finaled. Typically 150 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2015 | Completed final sign-off Jul 2015 | 56 Aztec St | clarify scope of work for pa #201307313244-s1 - delete roof deck on approved plans @ page a2.2.Details
clarify scope of work for pa #201307313244-s1 - delete roof deck on approved plans @ page a2.2. | |
| Jul 31, 2013 | Completed final sign-off Jul 2015 | 56 Aztec St | 1/fl-enclose&reconstruct entry stair.create landing@midpt.reloc washer/dryer.reconstruct wood fl at crawl space. 2/fl-enclose lt well@enry stair&(n)stair to new 3rd story. 3/fl-create new mstr bedrm & bathrm w/ roof deck@frt of bldg.Details
1/fl-enclose&reconstruct entry stair.create landing@midpt.reloc washer/dryer.reconstruct wood fl at crawl space. 2/fl-enclose lt well@enry stair&(n)stair to new 3rd story. 3/fl-create new mstr bedrm & bathrm w/ roof deck@frt of bldg. | $150,000 |
| Sep 15, 2011 | Never finaled issued Jun 2016, no final | 3200 Harrison St | complete siesmic upgrade, construction of new penthouse & roof deck, new interior walls, finishes, structural, plumbing, electrical, mechanical, new glazing. replacement of glazing at fucade. two new garage space & curb cut.Details
complete siesmic upgrade, construction of new penthouse & roof deck, new interior walls, finishes, structural, plumbing, electrical, mechanical, new glazing. replacement of glazing at fucade. two new garage space & curb cut. | $1,000,000 |
| Jan 8, 2008 | Never finaled issued Jan 2008, no final | 980 Corbett Av | revision to original p/a #2005.08.11.0076. (n) windows @ third level to change to sliding doors. this changes the roof to a roof deck.Details
revision to original p/a #2005.08.11.0076. (n) windows @ third level to change to sliding doors. this changes the roof to a roof deck. | $3,000 |