J Brown Construction
- Based in
- San Rafael
- On San Francisco permits
- May 2009 to Dec 2020
- Last 24 months
- 0 permits filed
33 permits since 2000: 27 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 28 days from filing to permit and 284 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2018 | Completed final sign-off Nov 2018 | 640 02nd Av | revision to pa #201711073290. revised foundation details, stair framing, 3rd floor ceiling framing.Details
revision to pa #201711073290. revised foundation details, stair framing, 3rd floor ceiling framing. | $10,000 |
| Nov 7, 2017 | Completed final sign-off Nov 2018 | 640 02nd Av | remodel e 3 story residence. replace e windows/doors throughout, 1st flr conditioned space attached to 2nd fl: bedroom, fam rm, full bath, laundry, mudroom. replace unpermitted exterior rear stair. infill lighterll at rear.Details
remodel e 3 story residence. replace e windows/doors throughout, 1st flr conditioned space attached to 2nd fl: bedroom, fam rm, full bath, laundry, mudroom. replace unpermitted exterior rear stair. infill lighterll at rear. | $150,000 |