Back to bathroom remodel contractors
J Brown Construction
- Based in
- San Rafael
- On San Francisco permits
- May 2009 to Dec 2020
- Last 24 months
- 0 permits filed
33 permits since 2000: 27 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 2 never finaled. Typically 0 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2020 | Completed final sign-off Mar 2021 | 4202 17th St | remodel bath and kitchen like for like.Details
remodel bath and kitchen like for like. | $35,000 |
| Jun 4, 2020 | Completed final sign-off Dec 2020 | 1177 California St | unit #1712: bathroom remodel like for like. all in kind.Details
unit #1712: bathroom remodel like for like. all in kind. | $20,000 |
| Dec 3, 2019 | Completed final sign-off May 2020 | 699 Webster St | remodel bath, new master bath, new laundry and new water heater; convert family room to master bedroomDetails
remodel bath, new master bath, new laundry and new water heater; convert family room to master bedroom | $45,000 |
| Dec 27, 2018 | Completed final sign-off May 2020 | 1471 South Van Ness Av | unit b. interior remodel. remodel kitchen. 3rd flr - relocate bath, remodel bedroom. 2nd flr - convert 1 bath to laundry, add powder roomDetails
unit b. interior remodel. remodel kitchen. 3rd flr - relocate bath, remodel bedroom. 2nd flr - convert 1 bath to laundry, add powder room | $200,000 |
| Nov 29, 2018 | Completed final sign-off Apr 2019 | 636 Andover St | remodel downstairs bath like for like 6x6. replace slider door in the master bedroom like for like.Details
remodel downstairs bath like for like 6x6. replace slider door in the master bedroom like for like. | $15,000 |
| Dec 5, 2017 | Completed final sign-off Apr 2018 | 433 Elizabeth St | expand & remodel existing bathroom in upper floor - 19" into (e) closet space. change (e) water heater.Details
expand & remodel existing bathroom in upper floor - 19" into (e) closet space. change (e) water heater. | $40,000 |
| Nov 7, 2017 | Completed final sign-off Nov 2018 | 640 02nd Av | remodel e 3 story residence. replace e windows/doors throughout, 1st flr conditioned space attached to 2nd fl: bedroom, fam rm, full bath, laundry, mudroom. replace unpermitted exterior rear stair. infill lighterll at rear.Details
remodel e 3 story residence. replace e windows/doors throughout, 1st flr conditioned space attached to 2nd fl: bedroom, fam rm, full bath, laundry, mudroom. replace unpermitted exterior rear stair. infill lighterll at rear. | $150,000 |
| Aug 7, 2017 | Never finaled issued Aug 2017, no final | 1162 Dolores St | remove window and cover. install heated tile floor mats and change tub spout in hall bath.Details
remove window and cover. install heated tile floor mats and change tub spout in hall bath. | $3,000 |
| Aug 19, 2014 | Completed final sign-off Jan 2015 | 431 Buchanan St | remodel kitchen, remove 3/4 bath, convert to closet, remodel master bath. change tub to shower. add 1/2 bath in hallwayDetails
remodel kitchen, remove 3/4 bath, convert to closet, remodel master bath. change tub to shower. add 1/2 bath in hallway | $65,000 |
| Mar 13, 2014 | Completed final sign-off Jun 2014 | 2682 17th Av | remodel bath, replace tub, shower and vanity, same locations. no walls removed. 6'9"x8'6" approx.Details
remodel bath, replace tub, shower and vanity, same locations. no walls removed. 6'9"x8'6" approx. | $12,000 |
| Feb 14, 2014 | Never finaled issued Feb 2014, no final | 101 Lombard St | unit #112e - remodel kitchen & 1/2 bth, relocate frig & stove (electric), removing partition wall (non bearing), replacing vanity & lights in 1/2 bath.Details
unit #112e - remodel kitchen & 1/2 bth, relocate frig & stove (electric), removing partition wall (non bearing), replacing vanity & lights in 1/2 bath. | $12,000 |
| Jul 14, 2011 | Completed final sign-off Sep 2011 | 617 Central Av | remove bedroom, family room, bathroom, and kitchen. install a storage room at gr flDetails
remove bedroom, family room, bathroom, and kitchen. install a storage room at gr fl | $5,000 |
| May 3, 2011 | Completed final sign-off May 2011 | 404 Dellbrook Av | repair dry wall @ 1st floor bedrooms in kind. install tile in bath only. no change light or fixtures etc. no change to windows, wall or doorsDetails
repair dry wall @ 1st floor bedrooms in kind. install tile in bath only. no change light or fixtures etc. no change to windows, wall or doors | $2,000 |
| Apr 7, 2011 | Completed final sign-off May 2011 | 1078 Noe St | remodel bath on 2nd floor. move laundry from garage to 2nd floor closet. enlarge 2 closets.Details
remodel bath on 2nd floor. move laundry from garage to 2nd floor closet. enlarge 2 closets. | $15,000 |