Back to kitchen remodel contractors
J Brown Construction
- Based in
- San Rafael
- On San Francisco permits
- May 2009 to Dec 2020
- Last 24 months
- 0 permits filed
33 permits since 2000: 27 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 1 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2020 | Completed final sign-off Mar 2021 | 4202 17th St | remodel bath and kitchen like for like.Details
remodel bath and kitchen like for like. | $35,000 |
| Dec 27, 2018 | Completed final sign-off May 2020 | 1471 South Van Ness Av | unit b. interior remodel. remodel kitchen. 3rd flr - relocate bath, remodel bedroom. 2nd flr - convert 1 bath to laundry, add powder roomDetails
unit b. interior remodel. remodel kitchen. 3rd flr - relocate bath, remodel bedroom. 2nd flr - convert 1 bath to laundry, add powder room | $200,000 |
| Aug 19, 2014 | Completed final sign-off Jan 2015 | 431 Buchanan St | remodel kitchen, remove 3/4 bath, convert to closet, remodel master bath. change tub to shower. add 1/2 bath in hallwayDetails
remodel kitchen, remove 3/4 bath, convert to closet, remodel master bath. change tub to shower. add 1/2 bath in hallway | $65,000 |
| May 5, 2014 | Completed final sign-off Aug 2014 | 3955 Cesar Chavez St | replace cabinets , tiles, and counter in kitchen , no alterations of wall , window and door.Details
replace cabinets , tiles, and counter in kitchen , no alterations of wall , window and door. | $10,000 |
| Feb 14, 2014 | Never finaled issued Feb 2014, no final | 101 Lombard St | unit #112e - remodel kitchen & 1/2 bth, relocate frig & stove (electric), removing partition wall (non bearing), replacing vanity & lights in 1/2 bath.Details
unit #112e - remodel kitchen & 1/2 bth, relocate frig & stove (electric), removing partition wall (non bearing), replacing vanity & lights in 1/2 bath. | $12,000 |
| Aug 25, 2011 | Completed final sign-off Oct 2011 | 874 Douglass St | remodel kitchen @ ground floor lower unit.Details
remodel kitchen @ ground floor lower unit. | $5,000 |
| Jul 14, 2011 | Completed final sign-off Sep 2011 | 617 Central Av | remove bedroom, family room, bathroom, and kitchen. install a storage room at gr flDetails
remove bedroom, family room, bathroom, and kitchen. install a storage room at gr fl | $5,000 |