Back to kitchen remodel contractors
Itu Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2009 to Aug 2026
- Last 24 months
- 19 permits filed
136 permits since 2000: 117 completed, 2 in progress, 9 never finaled, 8 expired or cancelled.
Of the 9 never-finaled permits, 7 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
43 kitchen remodel permits: 37 completed, 1 in progress, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 202 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1655 Beach St | replacing the existing sewer line, remodel existing kitchen at the same location. no structural work. refacing 2 full bathrooms at 3rd floor.Details
replacing the existing sewer line, remodel existing kitchen at the same location. no structural work. refacing 2 full bathrooms at 3rd floor. | $80,000 |
| Nov 6, 2025 | Completed final sign-off Feb 2026 | 105 Belvedere St | top floor: remodel (e) bathroom, shower, (2) sinks and toilet. remodel (e) kitchen and laundry - no structural work. upgrade electrical throughout. refinish floors and repaint throughtout.Details
top floor: remodel (e) bathroom, shower, (2) sinks and toilet. remodel (e) kitchen and laundry - no structural work. upgrade electrical throughout. refinish floors and repaint throughtout. | $75,000 |
| Jun 13, 2025 | Completed final sign-off Jan 2026 | 2373 Filbert St | remodel kitchen at 2/f, master bathroom full remodel at 3/f, kids bath replace tile and plumbing fixtures finish only. replace (6) (e) windows, (1) french door: at rear of building. no structural work.Details
remodel kitchen at 2/f, master bathroom full remodel at 3/f, kids bath replace tile and plumbing fixtures finish only. replace (6) (e) windows, (1) french door: at rear of building. no structural work. | $75,000 |
| Jul 15, 2024 | Completed final sign-off Sep 2024 | 2395 29th Av | unit #2: replace bathroom vanity, toilet, tile and bathroom shower valve. replace kitchen cabinets and applicances.Details
unit #2: replace bathroom vanity, toilet, tile and bathroom shower valve. replace kitchen cabinets and applicances. | $25,000 |
| May 3, 2024 | Completed final sign-off Oct 2025 | 724 Masonic Av | repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathroomsDetails
repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathrooms | $100,000 |
| Sep 30, 2022 | Completed final sign-off Aug 2024 | 275 San Benito Wy | remodel e kitchen, remodel e primary bathroom install new underground fire service andand closet, replace e windows with new wood windows to match e. replace e french doors at rear and front facade with new wood fr doors o match e, new window north elevation at primary bath,n garage door,widen opengDetails
remodel e kitchen, remodel e primary bathroom install new underground fire service andand closet, replace e windows with new wood windows to match e. replace e french doors at rear and front facade with new wood fr doors o match e, new window north elevation at primary bath,n garage door,widen openg | $150,000 |
| Jun 16, 2022 | Completed final sign-off Oct 2023 | 1990 16th Av | interior remodel. kitchen & bathroom remodel. basement unfinished space conversion to room, bedroom remodel.Details
interior remodel. kitchen & bathroom remodel. basement unfinished space conversion to room, bedroom remodel. | $300,000 |
| Mar 3, 2022 | Completed final sign-off Oct 2023 | 1990 16th Av | non structural remodel first and second floor: 3 full bathrooms, one full kitchen, new electric wiring and existing laundry, no structural work, everything is existing locations. to comply with nov# 2022878818 dated 2/22/22Details
non structural remodel first and second floor: 3 full bathrooms, one full kitchen, new electric wiring and existing laundry, no structural work, everything is existing locations. to comply with nov# 2022878818 dated 2/22/22 | $100,000 |
| Jan 7, 2022 | Completed final sign-off Apr 2022 | 414 41st Av | remodel kitchen and dining room area/ no structural work: remodel as is. (1) new electric (2) new cabinets (3) replace appliances (4) new counter with tileDetails
remodel kitchen and dining room area/ no structural work: remodel as is. (1) new electric (2) new cabinets (3) replace appliances (4) new counter with tile | $25,000 |
| May 4, 2021 | Completed final sign-off Jan 2022 | 376 Lexington St | install new cabinetry in kitchen and dining rom. no moving walls or change of foot print. install net trends and risers on existing stairway between first fl and garage. reconfigure garage cabinets and storage racks and relocate workbench. seal garage pad and relcate workbench electrical.Details
install new cabinetry in kitchen and dining rom. no moving walls or change of foot print. install net trends and risers on existing stairway between first fl and garage. reconfigure garage cabinets and storage racks and relocate workbench. seal garage pad and relcate workbench electrical. | $52,000 |
| Feb 4, 2021 | Completed final sign-off Jan 2022 | 3456 Clay St | remodel existing kitchen as is. remodel 4 full baths and a half bath. replace 4 existing furnaces. electrical new recess light and outlets thru w/ switches.Details
remodel existing kitchen as is. remodel 4 full baths and a half bath. replace 4 existing furnaces. electrical new recess light and outlets thru w/ switches. | $100,000 |
| Jun 29, 2020 | Completed final sign-off Oct 2020 | 142 Yale St | patch drywall due to installation of recess lights. replace closet doors, intall need baseboards, paint second floor walls and ceiling. install new kitchen countertops & reinstall bathroom vanitites. all work in-kindDetails
patch drywall due to installation of recess lights. replace closet doors, intall need baseboards, paint second floor walls and ceiling. install new kitchen countertops & reinstall bathroom vanitites. all work in-kind | $4,000 |
| Jun 1, 2020 | Expired or cancelled withdrawn Feb 2023 | 2954 23rd St | remodel existing kitchen and bathroom in-kind. new plumbing for laundry room kitchenDetails
remodel existing kitchen and bathroom in-kind. new plumbing for laundry room kitchen | $75,000 |
| Dec 31, 2019 | Completed final sign-off Apr 2022 | 877 Treat Av | remodel of interior, including new bathrooms & kitchen. excavation for new rooms at basement. new deck at rearDetails
remodel of interior, including new bathrooms & kitchen. excavation for new rooms at basement. new deck at rear | $400,000 |
| Oct 15, 2019 | Completed final sign-off May 2020 | 67 Jordan Av | interior remodel: relocate bathroom on 2nd level to enlarge kitchen. combine 1/2 bath with full bath, remodel master bathroom & closet on 3rd level. remove all plaster & rplce with gypsum board. all nw elect., plmg, & mech ducts throughout. replace single pane windows at side & rear. n/a for maherDetails
interior remodel: relocate bathroom on 2nd level to enlarge kitchen. combine 1/2 bath with full bath, remodel master bathroom & closet on 3rd level. remove all plaster & rplce with gypsum board. all nw elect., plmg, & mech ducts throughout. replace single pane windows at side & rear. n/a for maher | $200,000 |
| Oct 8, 2019 | Completed final sign-off Apr 2022 | 877 Treat Av | remodel existing kitchen and bathroom plug upgrade new electric throughout and install new furnace. remodel in kind.Details
remodel existing kitchen and bathroom plug upgrade new electric throughout and install new furnace. remodel in kind. | $60,000 |
| Jul 22, 2019 | Completed final sign-off Mar 2020 | 3321 23rd St | int remodel- relocate kitchen remodel bathroom, create new bathroom in each unit and relocate bedroomDetails
int remodel- relocate kitchen remodel bathroom, create new bathroom in each unit and relocate bedroom | $96,000 |
| Mar 26, 2019 | Completed final sign-off Nov 2019 | 763 Myra Wy | interior remodel at ground fl. into livable sf-394.2 sf conditioned space added, new windows & door at ground floor, new windows at upper fl. living rm. and new opening in wall between living rm. & kitchenDetails
interior remodel at ground fl. into livable sf-394.2 sf conditioned space added, new windows & door at ground floor, new windows at upper fl. living rm. and new opening in wall between living rm. & kitchen | $70,000 |
| Mar 6, 2019 | Completed final sign-off Jun 2019 | 201 Moultrie St | remodel (e) kitchen ( 10x15)with 2 full bathrooms (6x10)install 18 recessed lights (dining rm ,kitchen & downstairs family rm) make upgrades to a(e) 2nd flr fireplace from woodfire to gas, float ceiling & walls througout the hose (n) flooring throughoutDetails
remodel (e) kitchen ( 10x15)with 2 full bathrooms (6x10)install 18 recessed lights (dining rm ,kitchen & downstairs family rm) make upgrades to a(e) 2nd flr fireplace from woodfire to gas, float ceiling & walls througout the hose (n) flooring throughout | $40,000 |
| Oct 29, 2018 | Completed final sign-off Nov 2018 | 537 Rutland St | remodel one existing bathroom (non structural). new kitchen cabinets, run new electrical outlets throughout the second floor. replace existing water heater and furnanceDetails
remodel one existing bathroom (non structural). new kitchen cabinets, run new electrical outlets throughout the second floor. replace existing water heater and furnance | $20,000 |
| Jul 6, 2018 | Completed final sign-off Oct 2018 | 2785 Jackson St | remodel 1 kitchen and 3 bathrooms, in-kindDetails
remodel 1 kitchen and 3 bathrooms, in-kind | $70,000 |
| Jan 16, 2018 | Completed final sign-off Aug 2018 | 2521 Octavia St | new skylights, windows and doors at rear facade. structural upgrades in select locations. upgrade furnace and water heater. kitchen and bath remodel sep permitDetails
new skylights, windows and doors at rear facade. structural upgrades in select locations. upgrade furnace and water heater. kitchen and bath remodel sep permit | $30,000 |
| Jan 16, 2018 | Completed final sign-off May 2018 | 1990 Green St | remdel existing kitchen and dining rm. no change to walls doors or openingsDetails
remdel existing kitchen and dining rm. no change to walls doors or openings | $35,000 |
| Dec 6, 2017 | Completed final sign-off Jul 2018 | 1782 Beach St | minor interior remodel of extg kitchen and living areas. addition new interior stair and ground floor bedroom suite.Details
minor interior remodel of extg kitchen and living areas. addition new interior stair and ground floor bedroom suite. | $90,000 |
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 2521 Octavia St | remodel kitchen , powder rooom, master bathroom , 2 guest bathrooms.Details
remodel kitchen , powder rooom, master bathroom , 2 guest bathrooms. | $75,000 |
| Aug 22, 2017 | Completed final sign-off Dec 2017 | 9 Heather Av | revision to pa 2017-0811-4671, remove 1 wall at kitchen dining room and install new support beam and post as requiredDetails
revision to pa 2017-0811-4671, remove 1 wall at kitchen dining room and install new support beam and post as required | $5,000 |
| Aug 11, 2017 | Never finaled issued Aug 2017, no final | 750 Elizabeth St | remove one wall between kitchen and dining room per structural plans.Details
remove one wall between kitchen and dining room per structural plans. | $5,000 |
| Aug 11, 2017 | Completed final sign-off Dec 2017 | 9 Heather Av | remodel e kitchen. no alteration of wall, window and doorDetails
remodel e kitchen. no alteration of wall, window and door | $25,000 |
| Jul 31, 2017 | Completed final sign-off Oct 2018 | 750 Elizabeth St | update/remodel 2 bathroom and remodeling (e) kitchen.Details
update/remodel 2 bathroom and remodeling (e) kitchen. | $45,000 |
| Jul 11, 2017 | Completed final sign-off Nov 2017 | 131 San Pablo Av | master bathroom remodel, replace kitchen counter tops & appliances, refinish hardwood floors throughout the houseDetails
master bathroom remodel, replace kitchen counter tops & appliances, refinish hardwood floors throughout the house | $25,000 |
| Jun 16, 2017 | Completed final sign-off Oct 2017 | 2572 Greenwich St | kitchen remodel. no structural work.Details
kitchen remodel. no structural work. | $30,000 |
| Mar 3, 2017 | Completed final sign-off Feb 2021 | 1053 Tennessee St | rear addition to an (e) front building of house to include a new kitchen, 1 bathroom & 1 bedroom.Details
rear addition to an (e) front building of house to include a new kitchen, 1 bathroom & 1 bedroom. | $600,000 |
| Dec 15, 2016 | Expired or cancelled expired Oct 2021 | 225 Hoffman Av | total interior renovation; 2 kitchens, 2 baths remodel; windows, add bath at 1st floor.Details
total interior renovation; 2 kitchens, 2 baths remodel; windows, add bath at 1st floor. | $85,000 |
| Oct 24, 2016 | Completed final sign-off Dec 2017 | 1444 15th Av | light grading versa-lok retaining walls, concrete steps, conc. paving, artificial turf grass, fire tit, out door kitchen, veffie boxes, wood fence.Details
light grading versa-lok retaining walls, concrete steps, conc. paving, artificial turf grass, fire tit, out door kitchen, veffie boxes, wood fence. | $32,000 |
| Aug 10, 2016 | Completed final sign-off Nov 2016 | 1385 Portola Dr | remodel kitchen and bathroom. no alteration of wall, window and door.Details
remodel kitchen and bathroom. no alteration of wall, window and door. | $35,000 |
| Aug 5, 2016 | Completed final sign-off Oct 2016 | 361 Duncan St | kitchen and bathroom remodel. new electric work; recessed lighting. re-finish floors, paint ceiling, walls and trimDetails
kitchen and bathroom remodel. new electric work; recessed lighting. re-finish floors, paint ceiling, walls and trim | $35,000 |
| Jul 13, 2016 | Completed final sign-off Dec 2017 | 1444 15th Av | remodel extg bath, add new master bath, and half bathroom. relocate kitchen from 2nd floor to 1st floor legalizing lower level rooms. new electric throughout including new service. paint interior and exterior.Details
remodel extg bath, add new master bath, and half bathroom. relocate kitchen from 2nd floor to 1st floor legalizing lower level rooms. new electric throughout including new service. paint interior and exterior. | $60,000 |
| Jun 22, 2016 | Completed final sign-off Feb 2017 | 1238 Green St | remodel one kitchen and one second floor bathroom. replace 8 windows with wood sashes, front only. replace furnace. repaint exterior and interiorDetails
remodel one kitchen and one second floor bathroom. replace 8 windows with wood sashes, front only. replace furnace. repaint exterior and interior | $22,500 |
| Jun 22, 2016 | Completed final sign-off Apr 2017 | 565 24th Av | remodel one kitchen and one 2nd floor bathroom. replace 10 sashes windows to match existing wood windows. replace furnace. repaint interiors and exteriors. wood windows to match existing.Details
remodel one kitchen and one 2nd floor bathroom. replace 10 sashes windows to match existing wood windows. replace furnace. repaint interiors and exteriors. wood windows to match existing. | $25,000 |
| May 10, 2016 | Completed final sign-off Jun 2016 | 3041 Baker St | kitchen upgrade: install hardwood floors,install new counter tops,re-install appliances,upgrade outlets,install 2 ceiling lights. bathroom: replace tile on floor & shower walls,put new counter.floors: refinish floors.Details
kitchen upgrade: install hardwood floors,install new counter tops,re-install appliances,upgrade outlets,install 2 ceiling lights. bathroom: replace tile on floor & shower walls,put new counter.floors: refinish floors. | $12,500 |
| Jul 22, 2015 | Completed final sign-off Feb 2016 | 2760 Sacramento St | unit #9: upgrade kitchen, bath, floor and electric. kitchen & bath remodel.Details
unit #9: upgrade kitchen, bath, floor and electric. kitchen & bath remodel. | $35,900 |
| Oct 24, 2011 | Expired or cancelled expired Mar 2013 | 900 Bush St | remodel complete kitchen, master bath, guest bath, install ceiling lights, refinish floors and paint. relocate heater termostate. lighting to comply with cec150(k) exhaust fans connect to (e) exhaust ducts. no change to exhaust system.Details
remodel complete kitchen, master bath, guest bath, install ceiling lights, refinish floors and paint. relocate heater termostate. lighting to comply with cec150(k) exhaust fans connect to (e) exhaust ducts. no change to exhaust system. | $35,000 |
| May 19, 2011 | Completed final sign-off Jul 2011 | 4526 California St | remodel kitchen & bathroom - add new pantry, new door, shelves. move door opening, install a door & coat closet.Details
remodel kitchen & bathroom - add new pantry, new door, shelves. move door opening, install a door & coat closet. | $5,900 |