Back to bathroom remodel contractors
Itu Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2009 to Aug 2026
- Last 24 months
- 19 permits filed
136 permits since 2000: 117 completed, 2 in progress, 9 never finaled, 8 expired or cancelled.
Of the 9 never-finaled permits, 7 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
57 bathroom remodel permits: 49 completed, 2 in progress, 1 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1655 Beach St | replacing the existing sewer line, remodel existing kitchen at the same location. no structural work. refacing 2 full bathrooms at 3rd floor.Details
replacing the existing sewer line, remodel existing kitchen at the same location. no structural work. refacing 2 full bathrooms at 3rd floor. | $80,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 101 Belvedere St | 2 bathroom remodels no structural changes, replacement of fixtures, one new tub and one new shower, new toilets, sink, vanities, update electrical and plumbing as needed.Details
2 bathroom remodels no structural changes, replacement of fixtures, one new tub and one new shower, new toilets, sink, vanities, update electrical and plumbing as needed. | $30,000 |
| Nov 6, 2025 | Completed final sign-off Mar 2026 | 35 Alviso St | remodel (2) full bathrooms: 1st flr and 2nd flr. remodel laundry at 2nd flr.Details
remodel (2) full bathrooms: 1st flr and 2nd flr. remodel laundry at 2nd flr. | $60,000 |
| Nov 6, 2025 | Completed final sign-off Feb 2026 | 105 Belvedere St | top floor: remodel (e) bathroom, shower, (2) sinks and toilet. remodel (e) kitchen and laundry - no structural work. upgrade electrical throughout. refinish floors and repaint throughtout.Details
top floor: remodel (e) bathroom, shower, (2) sinks and toilet. remodel (e) kitchen and laundry - no structural work. upgrade electrical throughout. refinish floors and repaint throughtout. | $75,000 |
| Nov 6, 2025 | Completed final sign-off Feb 2026 | 140 Quintara St | remodel (e) 2nd flr bathroomm, no structural changes. add ceiling lights at: (2) bedrooms, bathroom, dining area, family room and entry hall. replace hardwood floor on same area at 2nd floor.Details
remodel (e) 2nd flr bathroomm, no structural changes. add ceiling lights at: (2) bedrooms, bathroom, dining area, family room and entry hall. replace hardwood floor on same area at 2nd floor. | $50,000 |
| Jun 13, 2025 | Completed final sign-off Jan 2026 | 2373 Filbert St | remodel kitchen at 2/f, master bathroom full remodel at 3/f, kids bath replace tile and plumbing fixtures finish only. replace (6) (e) windows, (1) french door: at rear of building. no structural work.Details
remodel kitchen at 2/f, master bathroom full remodel at 3/f, kids bath replace tile and plumbing fixtures finish only. replace (6) (e) windows, (1) french door: at rear of building. no structural work. | $75,000 |
| Jul 15, 2024 | Completed final sign-off Sep 2024 | 2395 29th Av | unit #2: replace bathroom vanity, toilet, tile and bathroom shower valve. replace kitchen cabinets and applicances.Details
unit #2: replace bathroom vanity, toilet, tile and bathroom shower valve. replace kitchen cabinets and applicances. | $25,000 |
| Jun 20, 2024 | Completed final sign-off Sep 2024 | 46 Presidio Av | remodel 2 full bathrooms on 3/f. no structural changes. replace bar sink at 2/f.Details
remodel 2 full bathrooms on 3/f. no structural changes. replace bar sink at 2/f. | $30,000 |
| May 3, 2024 | Completed final sign-off Oct 2025 | 724 Masonic Av | repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathroomsDetails
repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathrooms | $100,000 |
| Feb 17, 2023 | Completed final sign-off Jun 2023 | 2221 Divisadero St | 2/f: remodel primary bathroom in-kind, no structural work, remodel (e) laundry roomDetails
2/f: remodel primary bathroom in-kind, no structural work, remodel (e) laundry room | $30,000 |
| Sep 30, 2022 | Completed final sign-off Aug 2024 | 275 San Benito Wy | remodel e kitchen, remodel e primary bathroom install new underground fire service andand closet, replace e windows with new wood windows to match e. replace e french doors at rear and front facade with new wood fr doors o match e, new window north elevation at primary bath,n garage door,widen opengDetails
remodel e kitchen, remodel e primary bathroom install new underground fire service andand closet, replace e windows with new wood windows to match e. replace e french doors at rear and front facade with new wood fr doors o match e, new window north elevation at primary bath,n garage door,widen openg | $150,000 |
| Aug 22, 2022 | Completed final sign-off Nov 2022 | 33 Medau Pl | remodel (e) bathroom as-in. add 3 receptacles outlets in the bedroom. replace washer/dryer. in kind.Details
remodel (e) bathroom as-in. add 3 receptacles outlets in the bedroom. replace washer/dryer. in kind. | $20,000 |
| Jul 25, 2022 | Expired or cancelled expired Jan 2026 | 151 15th Av | self remodel ktichen, self remodel bathroom, repair weatherproof front exterior wall and repaint walls to comply with 201782961(his). repair rear deck and stairs to comply with 201782961(his)Details
self remodel ktichen, self remodel bathroom, repair weatherproof front exterior wall and repaint walls to comply with 201782961(his). repair rear deck and stairs to comply with 201782961(his) | $7,200 |
| Jun 16, 2022 | Completed final sign-off Oct 2023 | 1990 16th Av | interior remodel. kitchen & bathroom remodel. basement unfinished space conversion to room, bedroom remodel.Details
interior remodel. kitchen & bathroom remodel. basement unfinished space conversion to room, bedroom remodel. | $300,000 |
| Mar 3, 2022 | Completed final sign-off Oct 2023 | 1990 16th Av | non structural remodel first and second floor: 3 full bathrooms, one full kitchen, new electric wiring and existing laundry, no structural work, everything is existing locations. to comply with nov# 2022878818 dated 2/22/22Details
non structural remodel first and second floor: 3 full bathrooms, one full kitchen, new electric wiring and existing laundry, no structural work, everything is existing locations. to comply with nov# 2022878818 dated 2/22/22 | $100,000 |
| Dec 6, 2021 | Completed final sign-off Sep 2022 | 487 19th Av | remodel as is (5) bathrooms. no structural changes. (2) half bathrooms & (3) full bathrooms.Details
remodel as is (5) bathrooms. no structural changes. (2) half bathrooms & (3) full bathrooms. | $75,000 |
| Sep 24, 2021 | Completed final sign-off Jan 2022 | 163 04th Av | remodel 2 (e) bathrooms, no structural work at 3rd fl. lights per cenc 150.0 (k)Details
remodel 2 (e) bathrooms, no structural work at 3rd fl. lights per cenc 150.0 (k) | $30,000 |
| Aug 16, 2021 | Completed final sign-off Nov 2022 | 123 03rd Av | 1) replace tile on 2 full bathrooms. 2) replace plumbing fixtures in the same locations and powder toilet. 3) replace existing lights. (11.e. lighting and controller per cec 150.0 (k))Details
1) replace tile on 2 full bathrooms. 2) replace plumbing fixtures in the same locations and powder toilet. 3) replace existing lights. (11.e. lighting and controller per cec 150.0 (k)) | $25,000 |
| Feb 4, 2021 | Completed final sign-off Jan 2022 | 3456 Clay St | remodel existing kitchen as is. remodel 4 full baths and a half bath. replace 4 existing furnaces. electrical new recess light and outlets thru w/ switches.Details
remodel existing kitchen as is. remodel 4 full baths and a half bath. replace 4 existing furnaces. electrical new recess light and outlets thru w/ switches. | $100,000 |
| Oct 22, 2020 | Completed final sign-off Jan 2021 | 562 22nd Av | remodel (e) 2/f bathrooom, 1/f half bathroom, replace appliances. rewire new electric wiring throughout 1 and 2 floor. replace (e) furnace.Details
remodel (e) 2/f bathrooom, 1/f half bathroom, replace appliances. rewire new electric wiring throughout 1 and 2 floor. replace (e) furnace. | $25,000 |
| Jul 7, 2020 | Completed final sign-off Aug 2022 | 658 Shotwell St | priority processing. interior and exterior renovation, including foundation replacement and new resident and employee bathrooms. reconfiguration of bedrooms to accommodate increased client count.Details
priority processing. interior and exterior renovation, including foundation replacement and new resident and employee bathrooms. reconfiguration of bedrooms to accommodate increased client count. | $1,050,000 |
| Jun 29, 2020 | Completed final sign-off Oct 2020 | 142 Yale St | patch drywall due to installation of recess lights. replace closet doors, intall need baseboards, paint second floor walls and ceiling. install new kitchen countertops & reinstall bathroom vanitites. all work in-kindDetails
patch drywall due to installation of recess lights. replace closet doors, intall need baseboards, paint second floor walls and ceiling. install new kitchen countertops & reinstall bathroom vanitites. all work in-kind | $4,000 |
| Jun 1, 2020 | Expired or cancelled withdrawn Feb 2023 | 2954 23rd St | remodel existing kitchen and bathroom in-kind. new plumbing for laundry room kitchenDetails
remodel existing kitchen and bathroom in-kind. new plumbing for laundry room kitchen | $75,000 |
| Dec 31, 2019 | Completed final sign-off Apr 2022 | 877 Treat Av | remodel of interior, including new bathrooms & kitchen. excavation for new rooms at basement. new deck at rearDetails
remodel of interior, including new bathrooms & kitchen. excavation for new rooms at basement. new deck at rear | $400,000 |
| Oct 15, 2019 | Completed final sign-off May 2020 | 67 Jordan Av | interior remodel: relocate bathroom on 2nd level to enlarge kitchen. combine 1/2 bath with full bath, remodel master bathroom & closet on 3rd level. remove all plaster & rplce with gypsum board. all nw elect., plmg, & mech ducts throughout. replace single pane windows at side & rear. n/a for maherDetails
interior remodel: relocate bathroom on 2nd level to enlarge kitchen. combine 1/2 bath with full bath, remodel master bathroom & closet on 3rd level. remove all plaster & rplce with gypsum board. all nw elect., plmg, & mech ducts throughout. replace single pane windows at side & rear. n/a for maher | $200,000 |
| Oct 8, 2019 | Completed final sign-off Apr 2022 | 877 Treat Av | remodel existing kitchen and bathroom plug upgrade new electric throughout and install new furnace. remodel in kind.Details
remodel existing kitchen and bathroom plug upgrade new electric throughout and install new furnace. remodel in kind. | $60,000 |
| Jul 22, 2019 | Completed final sign-off Mar 2020 | 3321 23rd St | int remodel- relocate kitchen remodel bathroom, create new bathroom in each unit and relocate bedroomDetails
int remodel- relocate kitchen remodel bathroom, create new bathroom in each unit and relocate bedroom | $96,000 |
| Mar 6, 2019 | Completed final sign-off Jun 2019 | 201 Moultrie St | remodel (e) kitchen ( 10x15)with 2 full bathrooms (6x10)install 18 recessed lights (dining rm ,kitchen & downstairs family rm) make upgrades to a(e) 2nd flr fireplace from woodfire to gas, float ceiling & walls througout the hose (n) flooring throughoutDetails
remodel (e) kitchen ( 10x15)with 2 full bathrooms (6x10)install 18 recessed lights (dining rm ,kitchen & downstairs family rm) make upgrades to a(e) 2nd flr fireplace from woodfire to gas, float ceiling & walls througout the hose (n) flooring throughout | $40,000 |
| Feb 4, 2019 | Completed final sign-off Apr 2019 | 1350 Filbert St | remodel existing bathroom at second floor. run gas for patio pit, insert existing chimney.Details
remodel existing bathroom at second floor. run gas for patio pit, insert existing chimney. | $25,000 |
| Oct 29, 2018 | Completed final sign-off Nov 2018 | 537 Rutland St | remodel one existing bathroom (non structural). new kitchen cabinets, run new electrical outlets throughout the second floor. replace existing water heater and furnanceDetails
remodel one existing bathroom (non structural). new kitchen cabinets, run new electrical outlets throughout the second floor. replace existing water heater and furnance | $20,000 |
| Jul 6, 2018 | Completed final sign-off Oct 2018 | 2785 Jackson St | remodel 1 kitchen and 3 bathrooms, in-kindDetails
remodel 1 kitchen and 3 bathrooms, in-kind | $70,000 |
| Jan 16, 2018 | Completed final sign-off Aug 2018 | 2521 Octavia St | new skylights, windows and doors at rear facade. structural upgrades in select locations. upgrade furnace and water heater. kitchen and bath remodel sep permitDetails
new skylights, windows and doors at rear facade. structural upgrades in select locations. upgrade furnace and water heater. kitchen and bath remodel sep permit | $30,000 |
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 2521 Octavia St | remodel kitchen , powder rooom, master bathroom , 2 guest bathrooms.Details
remodel kitchen , powder rooom, master bathroom , 2 guest bathrooms. | $75,000 |
| Nov 17, 2017 | Completed final sign-off Jan 2018 | 201 Roanoke St | unit 1: add one bathroom per plansDetails
unit 1: add one bathroom per plans | $25,000 |
| Nov 9, 2017 | Completed final sign-off Jan 2018 | 348 Church St | remodel (e) master bathroom, in kindDetails
remodel (e) master bathroom, in kind | $25,000 |
| Oct 30, 2017 | Completed final sign-off Mar 2019 | 725 Webster St | remodel existing hall bath. no changes to the sturctural at unit 725. same location. no moving of walls, dooors or windows.Details
remodel existing hall bath. no changes to the sturctural at unit 725. same location. no moving of walls, dooors or windows. | $10,000 |
| Jul 31, 2017 | Completed final sign-off Oct 2018 | 750 Elizabeth St | update/remodel 2 bathroom and remodeling (e) kitchen.Details
update/remodel 2 bathroom and remodeling (e) kitchen. | $45,000 |
| Jul 21, 2017 | Completed final sign-off Feb 2018 | 366 Precita Av | remove and replace bathroom.Details
remove and replace bathroom. | $5,000 |
| Jul 11, 2017 | Completed final sign-off Nov 2017 | 131 San Pablo Av | master bathroom remodel, replace kitchen counter tops & appliances, refinish hardwood floors throughout the houseDetails
master bathroom remodel, replace kitchen counter tops & appliances, refinish hardwood floors throughout the house | $25,000 |
| Mar 3, 2017 | Completed final sign-off Feb 2021 | 1053 Tennessee St | (rear bldg). gut rehab of an (e) accessory dwelling to include a new dwelling unit (1 bed & 1 bath) & additional sq. ft. under an (e) projection (approx 50 sq.ft.), maher n/aDetails
(rear bldg). gut rehab of an (e) accessory dwelling to include a new dwelling unit (1 bed & 1 bath) & additional sq. ft. under an (e) projection (approx 50 sq.ft.), maher n/a | $150,000 |
| Mar 3, 2017 | Completed final sign-off Feb 2021 | 1053 Tennessee St | rear addition to an (e) front building of house to include a new kitchen, 1 bathroom & 1 bedroom.Details
rear addition to an (e) front building of house to include a new kitchen, 1 bathroom & 1 bedroom. | $600,000 |
| Feb 28, 2017 | Completed final sign-off May 2017 | 1385 Portola Dr | remodel 2nd fl (e) bathroom.Details
remodel 2nd fl (e) bathroom. | $20,000 |
| Dec 16, 2016 | Completed final sign-off Feb 2017 | 20 Parsons St | remodel existing one and half bathroom. in kind remodel.Details
remodel existing one and half bathroom. in kind remodel. | $25,000 |
| Dec 15, 2016 | Expired or cancelled expired Oct 2021 | 225 Hoffman Av | total interior renovation; 2 kitchens, 2 baths remodel; windows, add bath at 1st floor.Details
total interior renovation; 2 kitchens, 2 baths remodel; windows, add bath at 1st floor. | $85,000 |
| Aug 25, 2016 | Completed final sign-off Feb 2017 | 1238 Green St | remove wall dividing bedroom 1 and 2 to become a master bedroom and master bathroom. add skylight in bathroom. remove illegal bathroom in the basement.Details
remove wall dividing bedroom 1 and 2 to become a master bedroom and master bathroom. add skylight in bathroom. remove illegal bathroom in the basement. | $25,000 |
| Aug 10, 2016 | Completed final sign-off Nov 2016 | 1385 Portola Dr | remodel kitchen and bathroom. no alteration of wall, window and door.Details
remodel kitchen and bathroom. no alteration of wall, window and door. | $35,000 |
| Aug 5, 2016 | Completed final sign-off Oct 2016 | 361 Duncan St | kitchen and bathroom remodel. new electric work; recessed lighting. re-finish floors, paint ceiling, walls and trimDetails
kitchen and bathroom remodel. new electric work; recessed lighting. re-finish floors, paint ceiling, walls and trim | $35,000 |
| Jul 13, 2016 | Completed final sign-off Dec 2017 | 1444 15th Av | remodel extg bath, add new master bath, and half bathroom. relocate kitchen from 2nd floor to 1st floor legalizing lower level rooms. new electric throughout including new service. paint interior and exterior.Details
remodel extg bath, add new master bath, and half bathroom. relocate kitchen from 2nd floor to 1st floor legalizing lower level rooms. new electric throughout including new service. paint interior and exterior. | $60,000 |
| Jun 22, 2016 | Completed final sign-off Feb 2017 | 1238 Green St | remodel one kitchen and one second floor bathroom. replace 8 windows with wood sashes, front only. replace furnace. repaint exterior and interiorDetails
remodel one kitchen and one second floor bathroom. replace 8 windows with wood sashes, front only. replace furnace. repaint exterior and interior | $22,500 |
| Jun 22, 2016 | Completed final sign-off Apr 2017 | 565 24th Av | remodel one kitchen and one 2nd floor bathroom. replace 10 sashes windows to match existing wood windows. replace furnace. repaint interiors and exteriors. wood windows to match existing.Details
remodel one kitchen and one 2nd floor bathroom. replace 10 sashes windows to match existing wood windows. replace furnace. repaint interiors and exteriors. wood windows to match existing. | $25,000 |
| May 10, 2016 | Completed final sign-off Jun 2016 | 3041 Baker St | kitchen upgrade: install hardwood floors,install new counter tops,re-install appliances,upgrade outlets,install 2 ceiling lights. bathroom: replace tile on floor & shower walls,put new counter.floors: refinish floors.Details
kitchen upgrade: install hardwood floors,install new counter tops,re-install appliances,upgrade outlets,install 2 ceiling lights. bathroom: replace tile on floor & shower walls,put new counter.floors: refinish floors. | $12,500 |
| Jul 22, 2015 | Completed final sign-off Feb 2016 | 2760 Sacramento St | unit #9: upgrade kitchen, bath, floor and electric. kitchen & bath remodel.Details
unit #9: upgrade kitchen, bath, floor and electric. kitchen & bath remodel. | $35,900 |
| May 18, 2015 | Completed final sign-off Aug 2015 | 96 Winfield St | bathroom remodel in-kind: 1-replace all bath features, tile, tub, sink, crown moulding.Details
bathroom remodel in-kind: 1-replace all bath features, tile, tub, sink, crown moulding. | $15,000 |
| May 5, 2014 | Completed final sign-off Jul 2019 | 2231 Francisco St | remodel existing ground fl. including bathroom, family room and den. new second floor at rear including new master bath & two bedrooms. ** maher: compliance with ordinance no# 155-13 not required **Details
remodel existing ground fl. including bathroom, family room and den. new second floor at rear including new master bath & two bedrooms. ** maher: compliance with ordinance no# 155-13 not required ** | $65,000 |
| Oct 26, 2011 | Expired or cancelled cancelled Sep 2026 | 4788 Mission St | add a deli counter to an existing retail grocery facility including associates improvements to meet the enviromental health requirements; new storefront enclosure, upgrades to existing bathroom, flooring, wall finishes, food prep area plus mechanical ventilation and lighting.Details
add a deli counter to an existing retail grocery facility including associates improvements to meet the enviromental health requirements; new storefront enclosure, upgrades to existing bathroom, flooring, wall finishes, food prep area plus mechanical ventilation and lighting. | $20,000 |
| Oct 24, 2011 | Expired or cancelled expired Mar 2013 | 900 Bush St | remodel complete kitchen, master bath, guest bath, install ceiling lights, refinish floors and paint. relocate heater termostate. lighting to comply with cec150(k) exhaust fans connect to (e) exhaust ducts. no change to exhaust system.Details
remodel complete kitchen, master bath, guest bath, install ceiling lights, refinish floors and paint. relocate heater termostate. lighting to comply with cec150(k) exhaust fans connect to (e) exhaust ducts. no change to exhaust system. | $35,000 |
| May 19, 2011 | Completed final sign-off Jul 2011 | 4526 California St | remodel kitchen & bathroom - add new pantry, new door, shelves. move door opening, install a door & coat closet.Details
remodel kitchen & bathroom - add new pantry, new door, shelves. move door opening, install a door & coat closet. | $5,900 |