Back to kitchen remodel contractors
Iron Rock Construction Inc
- Based in
- Burlingame
- On San Francisco permits
- May 2024 to Nov 2026
- Last 24 months
- 11 permits filed
16 permits since 2000: 13 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 in progress. Typically 6 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2026 | In progress issued Nov 2026 | 2945 Ulloa St | to comply with nov #202665058.selective interior demolition of water damaged material. kitchen: removal of all wall coverings lath and plaster and tile floor. main level: removal of ceiling, lathe & plaster downstairs: removal of wall and ceiling and carpet + vinyl flooring (exploratory)Details
to comply with nov #202665058.selective interior demolition of water damaged material. kitchen: removal of all wall coverings lath and plaster and tile floor. main level: removal of ceiling, lathe & plaster downstairs: removal of wall and ceiling and carpet + vinyl flooring (exploratory) | $20,000 |
| Jul 16, 2025 | Completed final sign-off Apr 2026 | 225 Wheeler Av | convert 1/f to adu. no change to layout. add tub to make full bath, add windows to new bedroom, add windows to new living room, new kitchen, new bedroom. no change to sDetails
convert 1/f to adu. no change to layout. add tub to make full bath, add windows to new bedroom, add windows to new living room, new kitchen, new bedroom. no change to s | $12,000 |
| Sep 16, 2024 | Completed final sign-off Oct 2024 | 680 Mission St | unit 9g.to comply with complaint# 202427924: drywall installation reconnect kitchen appliances, replace closet door, replace sink, and counter in kitchen. prime and paint walls. install outlet covers, replace floor in where needed.Details
unit 9g.to comply with complaint# 202427924: drywall installation reconnect kitchen appliances, replace closet door, replace sink, and counter in kitchen. prime and paint walls. install outlet covers, replace floor in where needed. | $7,000 |
| Jul 30, 2024 | Completed final sign-off Apr 2026 | 225 Wheeler Av | replace (e) substandard foundation - interior work only; remodel (e) sfd @ 2nd fl - relocate kitchen, remodel bath, add new bath & modify walls; add partition walls @ 1st fl level for storage & wall strengthening; add half bath & relocated utility sink;Details
replace (e) substandard foundation - interior work only; remodel (e) sfd @ 2nd fl - relocate kitchen, remodel bath, add new bath & modify walls; add partition walls @ 1st fl level for storage & wall strengthening; add half bath & relocated utility sink; | $125,000 |
| May 16, 2024 | Completed final sign-off May 2025 | 225 Wheeler Av | take out the gypsum board in the bed rooms and vinyl flooring in the kitchen for exploratory demo. replace/repair in kind after exploration.Details
take out the gypsum board in the bed rooms and vinyl flooring in the kitchen for exploratory demo. replace/repair in kind after exploration. | $5,000 |