Iron Rock Construction Inc
- Based in
- Burlingame
- On San Francisco permits
- May 2024 to Jun 2026
- Last 24 months
- 11 permits filed
15 permits since 2000: 13 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 in progress. Typically 26 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2026 | In progress issued Jun 2026 | 1015 Geary St | unit 504, 604 & 605- to comply with nov# 202539634 to include drywall repairs, paint, replace carpet, front door, roof patch and bathroom repair due to fire and water damage. all work in kind. no wall removal or layout change.Details
unit 504, 604 & 605- to comply with nov# 202539634 to include drywall repairs, paint, replace carpet, front door, roof patch and bathroom repair due to fire and water damage. all work in kind. no wall removal or layout change. | $9,500 |
| Jul 16, 2025 | Completed final sign-off Apr 2026 | 225 Wheeler Av | convert 1/f to adu. no change to layout. add tub to make full bath, add windows to new bedroom, add windows to new living room, new kitchen, new bedroom. no change to sDetails
convert 1/f to adu. no change to layout. add tub to make full bath, add windows to new bedroom, add windows to new living room, new kitchen, new bedroom. no change to s | $12,000 |
| Oct 4, 2024 | Completed final sign-off Feb 2025 | 610 Geary St | 2nd/f:units 211-215, 3rd/fl 311-312,315,4th 411-412,414-415,5th 512,514-515, 6th/f 611-612,614, 7th/f 712,714- due to fire and water damage replace drywall as needed, insulation, paint and replace flooring. minor mep work. inclds bathroom upgrades. no wall or layout changeDetails
2nd/f:units 211-215, 3rd/fl 311-312,315,4th 411-412,414-415,5th 512,514-515, 6th/f 611-612,614, 7th/f 712,714- due to fire and water damage replace drywall as needed, insulation, paint and replace flooring. minor mep work. inclds bathroom upgrades. no wall or layout change | $334,638 |
| Jul 30, 2024 | Completed final sign-off Apr 2026 | 225 Wheeler Av | replace (e) substandard foundation - interior work only; remodel (e) sfd @ 2nd fl - relocate kitchen, remodel bath, add new bath & modify walls; add partition walls @ 1st fl level for storage & wall strengthening; add half bath & relocated utility sink;Details
replace (e) substandard foundation - interior work only; remodel (e) sfd @ 2nd fl - relocate kitchen, remodel bath, add new bath & modify walls; add partition walls @ 1st fl level for storage & wall strengthening; add half bath & relocated utility sink; | $125,000 |