Intrepid Electronic Systems Inc
- Based in
- Crockett
- On San Francisco permits
- Dec 2004 to Nov 2025
- Last 24 months
- 6 permits filed
122 permits since 2000: 90 completed, 4 in progress, 19 never finaled, 9 expired or cancelled.
Of the 19 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 14 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 42 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2016 | Completed final sign-off Oct 2016 | 1227 Hampshire St | (n) fire alarm system for (e) 50 unit apartment bldg includes connection to (e) waterflow switch, a/v device coverage w/ low frequency sounders in units. manual pull stations provided at stair landing & exits.Details
(n) fire alarm system for (e) 50 unit apartment bldg includes connection to (e) waterflow switch, a/v device coverage w/ low frequency sounders in units. manual pull stations provided at stair landing & exits. | $100,000 |
| Jan 27, 2015 | Never finaled issued Feb 2015, no final | 3298 25th St | new fire alarm system. including mointoring of existing water flow switch, manual pull stations at exits and stair landings, horn & strobes for occupant notificatin, off site mointoring and smoke detector in corridors.Details
new fire alarm system. including mointoring of existing water flow switch, manual pull stations at exits and stair landings, horn & strobes for occupant notificatin, off site mointoring and smoke detector in corridors. | $50,000 |
| Oct 27, 2014 | Completed final sign-off May 2015 | 3590 19th St | new fire alarm system & elevator upgrade to group 4 including monitoring of existing water flow switch, elevator recall service, av coverage, manual pull stations at exits and stair landings.Details
new fire alarm system & elevator upgrade to group 4 including monitoring of existing water flow switch, elevator recall service, av coverage, manual pull stations at exits and stair landings. | $50,000 |
| Jul 2, 2009 | Completed final sign-off Dec 2010 | 44 Mcallister St | provide a new fire alarm system w/ auto. voice evacuation message. system to monitor sprinkler system. provide elevator recall functions. release fire doors. provide area smoke detection for res. corridors & common areas. manual pull stations at stair landings and exitsDetails
provide a new fire alarm system w/ auto. voice evacuation message. system to monitor sprinkler system. provide elevator recall functions. release fire doors. provide area smoke detection for res. corridors & common areas. manual pull stations at stair landings and exits | $195,000 |