Interstate Restoration California Lp
- Based in
- Fort Worth
- On San Francisco permits
- Jan 2013 to Aug 2017
- Last 24 months
- 0 permits filed
49 permits since 2000: 38 completed, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2016 | Expired or cancelled cancelled Jan 2017 | 250 Golden Gate Av | repair 1400sf of drywall using 5/8 type-x. install insulation of same locations. per water damage. keep 2 layer fire rating. unit 318, 3/f floor hall, 3/f landing, 2/f lobby, 2/f landing, 1/f landing and stairs. no change to egress , occupancy or incradh.Details
repair 1400sf of drywall using 5/8 type-x. install insulation of same locations. per water damage. keep 2 layer fire rating. unit 318, 3/f floor hall, 3/f landing, 2/f lobby, 2/f landing, 1/f landing and stairs. no change to egress , occupancy or incradh. | $15,000 |
| Apr 29, 2014 | Never finaled issued Apr 2014, no final | 610 Vallejo St | repair basement floor, re-frame stage stairs, and install new floor finish.Details
repair basement floor, re-frame stage stairs, and install new floor finish. | $40,000 |
| Mar 18, 2014 | Completed final sign-off Jan 2015 | 678 Geary St | building shell work for future t.i. work include first floor bathroom, remove and reconstruct (e) stair to basement, replace (e) fixtures @ basement restroom space, remove (e) soffits, level floors, patch and repair dry wall vacant space. t.i. under separate permit.Details
building shell work for future t.i. work include first floor bathroom, remove and reconstruct (e) stair to basement, replace (e) fixtures @ basement restroom space, remove (e) soffits, level floors, patch and repair dry wall vacant space. t.i. under separate permit. | $30,000 |
| Mar 17, 2014 | Completed final sign-off Sep 2015 | 1201 04th St | to comply w/ nov#201457831. demo building inside stairways, 326,423,526,525,523,522,521,519,517,516,617,614,615,619,621,624,709,21,19,17,15,3,6,7,9,11,5,623,427,425,417,315,316,317,323,325 & 8. drywall and doors. total of 37 units.Details
to comply w/ nov#201457831. demo building inside stairways, 326,423,526,525,523,522,521,519,517,516,617,614,615,619,621,624,709,21,19,17,15,3,6,7,9,11,5,623,427,425,417,315,316,317,323,325 & 8. drywall and doors. total of 37 units. | $10,000 |
| Sep 16, 2013 | Completed final sign-off Oct 2013 | 1755 Ofarrell St | drywall installation at apt.# 304,404,501,502,504,601,604,605,701,702,704,801,802,805,806,901,902,903,904,905,909,910, hallway, stairway, i.t. room, mechanical room & electrical room due to water damage.Details
drywall installation at apt.# 304,404,501,502,504,601,604,605,701,702,704,801,802,805,806,901,902,903,904,905,909,910, hallway, stairway, i.t. room, mechanical room & electrical room due to water damage. | $155,000 |